• 제목/요약/키워드: ORIRES

검색결과 5건 처리시간 0.016초

환경제약을 고려한 동북아 전력계통 연계의 경제성 평가 (Evaluation of Economic Impacts of the Interstate Electric Power System in Northeast Asia Considering CO2 Emission)

  • 정구형;강동주;김발호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.837-839
    • /
    • 2005
  • ORIRES developed by ESI, Russia is a linear programming (LP) model to optimize electric power system operation and planning. Since ORIRES requires data relatively less than other models, it is suitable for northeast asia where imposes restriction against data acquisition. In this paper, we analyze the economic imparts of the environmental regulation on the interstate electric power system in northeast asia. For the rational evaluation of environmental effectiveness, CO2 emission constraints are incorporated into ORIRES.

  • PDF

동북아 전력계통 연계에 따른 경제성 분석 (Economic Analysis on the Interconnected Electric Power System in Northeast Asia)

  • 정구형;김경민;박중성;한석만;김발호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.766-768
    • /
    • 2005
  • Interstate electric power system, as an alternative for energy cooperation under regional economic bloc, has been hotly debated before progressing the restructure in electric power industry and rapidly expanded in many regions after 1990s. Especially, since northeast asia has strong supplementation in resource, load shape, fuel mix etc., interconnection of electric power systems in this region may bring considerable economic benefits. For the economic analysis, we implement ORIRES model developed by ESI, Russia. ORIRES is a linear programming (LP) model for electric power system operation and planning. Since ORIRES requires data relatively less than other model, it is suitable for northeast asia that has considerable restriction against required data acquisition. In this paper, we perform an economic analysis on interconnection in northeast asia.

  • PDF

Economic Feasibility on the Interconnected Electric Power Systems in North-East Asia

  • Chung, Koo-Hyung;Kim, Bal-Ho H.
    • Journal of Electrical Engineering and Technology
    • /
    • 제2권4호
    • /
    • pp.452-460
    • /
    • 2007
  • The interstate electric power system, as an alternative for energy cooperation under regional economic block, was fervently debated prior to the restructuring of electric power industries and rapidly expanded in many regions since the 1990s. Especially, electric power system interconnection in the Northeast Asia region may bring considerable economic benefits since this region has strong supplementation in resource holdings, load shape, fuel mix, and etc. In this paper, we implement the ORIRES model, proposed by ESI of Russia, in order to analyze the economic feasibility on the Northeast Asia Region Electrical System Ties (NEAREST) project.

동북아 전력계통 연계에 따른 경제성 분석 (Economic Feasibility on the Interconnected Electric Power System in North-East Asia)

  • 정구형;한석만;김발호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제55권2호
    • /
    • pp.76-84
    • /
    • 2006
  • Interstate electric power system, as an alternative for energy cooperation under regional economic block, has been hotly debated before progressing the restructure in electric power industry and rapidly expanded in many regions after 1990s. Especially, since northeast asia has strong supplementation in resource, load shape, fuel mix etc., interconnection of electric power systems in this region may bring considerable economic benefits. This paper implements a mathematical optimization model, ORIRES, proposed by Russia, in analysing the economic feasibility of system interconnection. Additional analyses on the environmental impact of the system interconnection, and sensitivity of key factor inputs have been performed.

CO2 배출량 제약과 배출권거래제를 고려한 설비계획 방법론에 관한 연구 (A study on development of generation expansion planning considering CO2 emission constraints and Emission Trading)

  • 김양일;이승현;한석만;정구형;김발호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.46-48
    • /
    • 2006
  • WASP which is used to plan generation expansion has disadvantages that can't manage environmental factors and regional supply-demand planning. But with the effectuation of the United Nations Framework Convention on Climate Change (UNFCCC) and Kyoto Protocol, it is expected that reducing greenhouse gases affects power system in its long-term generation expansion planning. Therefore national countermeasures is needed. This paper formulates a mathematical model considering CO2 emission constraints and Emission Trading that will be enforced. This model is based on the ORIRES which was made by ESI, Russia and manages generation expansion planning. And this mathematical model is verified by studying a case system.

  • PDF