• Title/Summary/Keyword: Nuclide Production System

Search Result 2, Processing Time 0.015 seconds

Design of I-123 Nuclide Production System (I-123 핵종생산장치 시스템 설계)

  • Jung, Hyun-Woo;You, Jae-Jun;Kim, Byung-Il;Lee, Dong-Hoon
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.18 no.6
    • /
    • pp.1462-1468
    • /
    • 2014
  • Xe gas is moved to target from GPM. It is used to feasible nuclear reaction from proton of 30MeV cyclotron being investigated by the Xe-124 gas target system. This system is divided into four parts. The hardware system was constructed by solidworks 3-D CAD and Helium supply is to cool the Havor foil. The Cooling water has the job of cooling down the temperature when Xe gas is being investigated in the target. Temperature and pressure gauges are attached to be checked easily. GPM has the part that prepares to transport Xe gas. There are storage vessel that stores Xe gas, the cold trap that filters humidity and impurity and lastly storage vessel that temporarily stores Xe gas. HCS using the helium is to clean and cool for each part. These parts are configured with SIEMENS PLC and PcVue monitoring program for more comfortable and easy maintenance.

Design of I-123 Nuclide production system (I-123 핵종생산장치 시스템 설계)

  • Jung, Hyun-Woo;You, Jae-Jun;Kim, Byung Il;Chun, KwonSoo;Lee, Ji-Seub;Park, Hyun;Choi, JunYong;Oh, Se-Young;Bang, Sang-Kwon;Lee, Dong Hoon
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2014.05a
    • /
    • pp.496-499
    • /
    • 2014
  • Xe Gas is moved to Target from GPM. It is Used to feasible nuclear reaction from proton of 30MeV Cyclotron being investigated by the Xe-124 Gas target System. This system is divided into four parts. Hardware was constructed by solidworks and Helium Supply is to cool the Havor Foil. Water has the job of cooling down the temperature when Xe Gas is being investigated in the target. Temperature and pressure gauges are attached to be checked easily. GPM(Gas Process Manifold) has the part that prepares to transport Xe Gas. There are Storage Vessel that stores Xe Gas, the cold trap that filters humidity and impurity and lastly storage vessel that temporarily stores Xe Gas. HCS(Helium Circulation System) using the Helium to cleaning and cooling. these parts are used to SIEMENS PLC and Pcvue Program. Because It is more comfortable and easy maintenance.

  • PDF