• Title/Summary/Keyword: Nuclear power program

Search Result 508, Processing Time 0.029 seconds

Comparative Study of Dose Evaluation of Liquid Effluent in Nuclear Power Plants for Radiological Impact on the Environment Review

  • Seokju Hwang;Si-Young Kim;Deuk-Man Kim;Young Hwan Hwang;Jungkwon Son
    • 방사성폐기물학회지
    • /
    • 제22권1호
    • /
    • pp.45-54
    • /
    • 2024
  • Currently, off-site dose calculations for nuclear power plants are conducted using a computer program (K-DOSE 60). The program is developed based on the regulatory guidelines of the Korea Institute of Nuclear Safety (KINS), which is a domestic nuclear regulatory agency. In this study, a domestic application of the International Atomic Energy Agency (IAEA) TRS (Technical Reports Series)-472 methodology for 3H and 14C in liquid effluents was studied. The dose-evaluation methods adopted and the program configuration for dose evaluation are described based on 3H and 14C in the liquid-effluent-evaluation module of the computer program. The accuracy of the program is verified by comparing the program-calculated results with hand calculation values. Furthermore, a comparative evaluation with LADTAP II, which is a liquid-effluent-evaluation methodology developed by the U.S. NRC (Nuclear Regulatory Commission), is performed. The result confirms that the program-calculated results for the IAEA TRS-472 methodology are consistent with the hand calculation values. Meanwhile, the result of comparative evaluation with LADTAP II indicates different results depending on the methodology used.

신규원전의 설계특성 기반 정비효과성감시 프로그램 개발 (Development of Maintenance Effectiveness Monitoring Program based on Design Characteristics for New Nuclear Power Plant)

  • 염동운;현진우;송태영
    • 한국압력기기공학회 논문집
    • /
    • 제8권1호
    • /
    • pp.25-32
    • /
    • 2012
  • Korea Hydro & Nuclear Power Co. (KHNP) has developed and implemented the maintenance effectiveness monitoring (MR) programs for the operating nuclear power plants. The MR program is developed by reflecting design characteristics of the operating nuclear power plants to monitor the plant performance for improving the safety and reliability. Recently, KHNP has built a new nuclear power plant, and developed the MR program to establish the advanced maintenance system by reflecting unique design characteristics based on the OPR1000 standard model. So, the MR program developed in this study has another characteristics in comparison with the OPR1000 standard model, and we will verify the suitability of the MR program through evaluating initial performance of the plant. The safety and reliability of the new plant will be improved by developing and implementing the MR program.

원자력발전소 전기기기의 보수, 교체 방법론 (Repair and Replacement Methodology for Electrical Equipment Used in Nuclear Power Plants)

  • 박철희;박완규;이만복;김춘삼
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2018년도 전력전자학술대회
    • /
    • pp.177-179
    • /
    • 2018
  • After Fukushima nuclear accident at 2011, nuclear industrial has been focused on operation and maintenance phase, not design and construction phase. Continued good operating performance of nuclear power plants has been the best critical issue to nuclear utilities. Replacement for complete components as well as parts of components is being procured because nuclear utilities must maintain safety and reliability of operating nuclear power plants. However, many suppliers and manufacturers are giving up a nuclear quality assurance program under reduction in new construction of nuclear power plants. It is able to be increased difficulty in procuring spare parts to support operations and maintenance of nuclear power plants. Over 20% of nuclear power plant equipment in some countries is obsolete. Owing to obsolescence of nuclear safety-related items and/or withdrawing a nuclear quality assurance program of suppliers and manufactures, some replacement item and part might be procured to the item not covered by appendix B to USNRC 10 CFR Part 50. Under various methods of the nuclear repair and replacement methodology, utilities are supposed to establish a typical program for a repair and replacement of an electrical equipment and its parts in conjunction with a nuclear quality assurance. Concerning this typical program, this study suggests the repair and replacement methodology of electrical equipments used in nuclear power plants by procurement of a power supply, based on nuclear regulations, codes, standards, guidelines, specific and general technical information, etc..

  • PDF

실용적인 원전공학 교육을 위한 시스템즈 엔지니어 프로그램 (Systems Engineer Program for Practical Nuclear Power Plant Engineering Education)

  • 장중구;정재천
    • 시스템엔지니어링학술지
    • /
    • 제11권2호
    • /
    • pp.31-40
    • /
    • 2015
  • KEPCO International Nuclear Graduate School (KINGS) is dedicated to nurturing leadership-level professionals in nuclear power plant (NPP) engineering. KINGS have designed curriculum based on two philosophies. First, we balance aspects of discipline engineering, specialty engineering, and management engineering in the framework of systems engineering. Second, KINGS have designed the curriculum so that students can learn and experience the know-what, know-how and know-why level knowledge of NPP engineering and management. The specialization programs are opened during the 2nd year for 3 trimesters and those are a process of learning through practical project courses. The objectives of the specialization programs are to help students to learn the NPP life cycle technologies in highly structured and systematic ways. The systems engineer program (SEP) is one of the specialization programs. A practical case of the SEP which was applied to the project course for the NPP electric power system design education will be elaborated in this paper.

THINNED PIPE MANAGEMENT PROGRAM OF KOREAN NUCLEAR POWER PLANTS

  • Lee, S.H.;Lee, Y.S.;Park, S.K.;Lee, J.G.
    • Corrosion Science and Technology
    • /
    • 제14권1호
    • /
    • pp.1-11
    • /
    • 2015
  • Local wall thinning and integrity degradation caused by several mechanisms, such as flow accelerated corrosion (FAC), cavitation, flashing and/or liquid drop impingements, are a main concern in carbon steel piping systems of nuclear power plant in terms of safety and operability. Thinned pipe management program (TPMP) had been developed and optimized to reduce the possibility of unplanned shutdown and/or power reduction due to pipe failure caused by wall thinning in the secondary side piping system. This program also consists of several technical elements such as prediction of wear rate for each component, prioritization of components for inspection, thickness measurement, calculation of actual wear and wear rate for each component. Decision making is associated with replacement or continuous service for thinned pipe components. Establishment of long-term strategy based on diagnosis of plant condition regarding overall wall thinning is also essential part of the program. Prediction models of wall thinning caused by FAC had been established for 24 operating nuclear plants. Long term strategies to manage the thinned pipe component were prepared and applied to each unit, which was reflecting plant specific design, operation, and inspection history, so that the structural integrity of piping system can be maintained. An alternative integrity assessment criterion and a computer program for thinned piping items were developed for the first time in the world, which was directly applicable to the secondary piping system of nuclear power plant. The thinned pipe management program is applied to all domestic nuclear power plants as a standard procedure form so that it contributes to preventing an accident caused by FAC.

Deployment of Radioactive Waste Disposal Facility with the Introduction of Nuclear Power Plants (NPP) in Kenya

  • Shadrack, A.;Kim, C.L.
    • Journal of Nuclear Fuel Cycle and Waste Technology
    • /
    • 제1권1호
    • /
    • pp.37-47
    • /
    • 2013
  • This paper describes basic plans for the development of a radioactive waste disposal facility with the introduction of Nuclear Power Plants (NPPs) for Kenya. The specific objective of this study was to estimate the total projected waste volumes of low- and intermediate-level radioactive waste (LILW) expected to be generated from the Kenyan nuclear power programme. The facility is expected to accommodate LILW to be generated from operation and decommissioning of nuclear power plants for a period of 50 years. An on-site storage capacity of 700 $m^3$ at nuclear power plant sites and a final disposal repository facility of more than 7,000 $m^3$ capacity were derived by considering Korean nuclear power programme radioactive waste generation data, including Kori, Hanbit, and APR 1400 nuclear reactor data. The repository program is best suited to be introduced roughly 10 years after reactor operation. This study is important as an initial implementation of a national LILW disposal program for Kenya and other newcomer countries interested in nuclear power technology.

Modification of Reference Temperature Program in Reactor Regulating System

  • Yu, Sung-Sik;Lee, Byung-Jin;Kim, Se-Chang;Cheong, Jong-Sik;Kim, Ji-In;Doo, Jin-Yong
    • 한국원자력학회:학술대회논문집
    • /
    • 한국원자력학회 1998년도 춘계학술발표회논문집(1)
    • /
    • pp.404-410
    • /
    • 1998
  • In Yonggwang nuclear units 3 and 4 currently under commercial operation, the cold leg temperature was very close to the technical specification limit of 298$^{\circ}C$ during initial startup testing, which was caused by the higher-than-expected reactor coolant system flow. Accordingly, the reference temperature (Tref) program needed to be revised to allow more flexibility for plant operations. In this study, the method of a specific test performed at Yonggwang nuclear unit 4 to revise the Tref program was described and the test results were discussed. In addition, the modified Tref program was evaluated on its potential impacts on system performance and safety. The methods of changing the Tref program and the associated pressurizer level setpoint program were also explained. Finally, for Ulchin nuclear unit 3 and 4 currently under initial startup testing, the effects of reactor coolant system flow rate on the coolant temperature were evaluated from the thermal hydraulic standpoint and an optimum Tref program was recommended.

  • PDF

발전용 비상디젤발전기 엔진 상태진단 프로그램 개발 연구 (A Study on the Development of EDG Engine Condition Diagnosis Program in Power Plant)

  • 이상국;김대웅
    • 동력기계공학회지
    • /
    • 제19권5호
    • /
    • pp.67-72
    • /
    • 2015
  • The reliable operation of onsite emergency diesel generator(EDG) should be ensured by a conditioning monitoring system designed to maintain, monitor and forecast the reliability level of diesel generator. The purpose of this paper is to develop condition diagnosis algorithm(logic) and analysis program of engine for the accurate diagnosis in actual condition of emergency diesel generator engine. As a result of this study, we confirmed that developed engine condition diagnosis algorithm and analysis program could be efficiently applied for actual EDG engine in nuclear power plant.

A preliminary evaluation of the implementation of a radiation protection program for the lens of the eye in Korean nuclear power plants

  • Kong, Tae Young;Kim, Si Young;Cho, Moonhyung;Jung, Yoonhee;Son, Jung Kwon;Jang, Han;Kim, Hee Geun
    • Nuclear Engineering and Technology
    • /
    • 제53권9호
    • /
    • pp.3035-3043
    • /
    • 2021
  • Epidemiological research has revealed that radiation exposure can cause cataracts. The Korean nuclear regulatory body has proposed the reduction of the occupational dose limit for the lens of the eye from 150 mSv/y to 100 mSv/5y, with an additional limitation of not exceeding 50 mSv/y for a specific year, taking into account the recommendations of the International Commission on Radiological Protection, and the International Atomic Energy Agency. This means that radiation workers should receive the same level of radiation safety for the lens of the eye as for whole-body protection. Korean nuclear power plants (NPPs) are conducting research to establish the radiation protection program for the lens of the eye. In terms of the preliminary results of the implementation of the radiation protection program for the lens of the eye dedicated to Korean NPPs, this review article summarizes the current state of understanding of the regulations, technical guidance, eye lens dosimeters, and radiation field conditions resulting in lens dose.

Challenges in nuclear energy adoption: Why nuclear energy newcomer countries put nuclear power programs on hold?

  • Philseo Kim;Hanna Yasmine;Man-Sung Yim;Sunil S. Chirayath
    • Nuclear Engineering and Technology
    • /
    • 제56권4호
    • /
    • pp.1234-1243
    • /
    • 2024
  • The pressing need to mitigate greenhouse gas emissions has stimulated a renewed interest in nuclear energy worldwide. However, while numerous countries have shown interest in nuclear power over the course of history, many of them have not continued their pursuit and chosen to defer or abandon their peaceful nuclear power projects. Scrapping a national nuclear power program after making initial efforts implies significant challenges in such a course or a waste of national resources. Therefore, this study aims to identify the crucial factors that influence a country's decision to terminate or hold off its peaceful nuclear power programs. Our empirical analyses demonstrate that major nuclear accidents and leadership changes are significant factors that lead countries to terminate or defer their nuclear power programs. Additionally, we highlight that domestic politics (democracy), lack of military alliance with major nuclear suppliers, low electricity demand, and national energy security environments (energy import, crude oil price) can hamper a country's possibility of regaining interest in a nuclear power program after it has been scrapped, suspended, or deferred. The findings of this study have significant implications for policymakers and stakeholders in the energy sector as they strive to balance the competing demands of energy security, and environmental sustainability.