• 제목/요약/키워드: Nuclear plant

검색결과 4,149건 처리시간 0.035초

Load Test Simulator Development for Steam Turbine-Generator System of Nuclear Power Plant

  • Jeong, Chang-Ki;Kim, Jong-An;Kim, Byung-Chul;Choi, In-Kyu;Woo, Joo-Hee
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2005년도 ICCAS
    • /
    • pp.1384-1386
    • /
    • 2005
  • This paper focuses on development of load test simulator of a steam turbine-generator in a nuclear power plant. When load is taken off from electrical power network, it is very difficult to effectively control the steam flow to turbine of the nuclear turbine-generator, because of disturbances, such as electrical load and network unbalance on electrical network. Up to the present time, the conventional control system has been used for the load control on nuclear steam generator, owing to the easy control algorithms and the advantage which have been proven on the nuclear power plant. However, since there are problems with stability control during low power and start-up, only a highly experienced operator can operate during those procedures. Also, a great deal of time and an expensive simulator is needed for the training of an operator. The KEPRI is developed simulator for 600MW nuclear power plant to take a test of generator load rejection, throttle valve, and turbine load control. Total load test is implemented before start up.

  • PDF

Evaluation of Nuclear Plant Cable Aging Through Condition Monitoring

  • Kim, Jong-Seog;Lee, Dong-Ju
    • Nuclear Engineering and Technology
    • /
    • 제36권5호
    • /
    • pp.475-484
    • /
    • 2004
  • Extending the lifetime of a nuclear power plant [(hereafter referred to simply as NPP)] is one of the most important concerns in the global nuclear industry. Cables are one of the long-life items that have not been considered for replacement during the design life of a NPP. To extend the cable life beyond the design life, it is first necessary to prove that the design life is too conservative compared with actual aging. Condition monitoring is useful means of evaluating the aging condition of cable. In order to simulate natural aging in a nuclear power plant. a study on accelerated aging must first be conducted. In this paper, evaluations of mechanical aging degradation for a neoprene cable jacket were performed after accelerated aging under tcontinuous and intermittent heating conditions. Contrary to general expectations, intermittent heating to the neoprene cable jacket showed low aging degradation, 50% break-elongation, and 60% indenter modulus, compared with continuous heating. With a plant maintenance period of 1 month after every 12 or 18 months operation, we can easily deduce that the life time of the cable jacket of neoprene can be extended much longer than extimated through the general EQ test. which adopts continuous accelerated aging for determining cable life. Therefore, a systematic approach that considers the actual environment conditions of the nuclear power plant is required for determining cable life.

Effect of thermal aging on the mechanical, intergranular corrosion and corrosion fatigue properties of Z3CN20.09M cast duplex stainless steel

  • Ti, Wenxin;Wu, Huanchun;Xue, Fei;Zhang, Guodong;Peng, Qunjia;Fang, Kewei;Wang, Xitao
    • Nuclear Engineering and Technology
    • /
    • 제53권8호
    • /
    • pp.2591-2599
    • /
    • 2021
  • The effect of thermal aging at 475 ℃ and 750 ℃ of Z3CN20.09M cast duplex stainless steel (CDSS) on microstructure, mechanical and intergranular corrosion properties were investigated by transmission electron microscope (TEM), nano indenter, scanning electron microscope (SEM) and corrosion fatigue test system. The result indicated that the spinodal decomposition and G precipitated were occurred after aged at 475 ℃, as well as sigma precipitated at 750 ℃. The microstructure degeneration of ferrite was saturated after aged for 2000h and 200 h at 475 ℃ and 750 ℃ respectively. The mechanical properties, intergranular corrosion resistance and corrosion fatigue lives were continuing deteriorated with increasing the aging time at both temperatures. The difference of the degeneration mechanisms of Z3CN20.09M CDSS aged at 475 ℃ and 750 ℃ was analyzed.

원자력 발전소의 해수전해설비 폐수소를 활용한 PEM 연료전지 발전 시스템에 관한 연구 (A study on the power plant system combined with PEM fuel cell and the wasted hydrogen from the sea water electrolyzer of nuclear power plants)

  • 최종원;이주형;차석원;김민수
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2010년도 춘계학술대회 초록집
    • /
    • pp.124.2-124.2
    • /
    • 2010
  • Generally, a coolant of the nuclear power plant is manufactured by electrolyzing the sea water near the plant for making the sodium hypochlorite(NaOCl), which is used for sterilizing the bacteria and the shellfishes sticking to the drains or the pumps at the outlet of the cooling system due to $8-10^{\circ}C$ warmer temperature than the inlet sea water. During manufacturing the sodium hypochlorite, the hydrogen with the high purity is also produced at the anode side of the electrolyzer. This paper describes a novel power plant system combined with the polymer electrolyte membrane(PEM) fuel cell, the wasted hydrogen from the sea water electrolyzer and the wasted heat of the nuclear power plant. The present status over the exhausted hydrogen at twenty nuclear power plants in Korea was investigated in this study, from which an available power generation is estimated. Furthermore, the economic feasibility of the PEM fuel cell power plant is also evaluated by a current regulations over the power production and exchange using a renewable energy shown in Korea Power Exchange(KRX).

  • PDF

원자력발전소 건설공사의 공종별 위험도에 관한 연구 (A Study on the Risk Level of Work Types in Nuclear Power Plant Construction)

  • 이종빈;이준경;장성록
    • 한국안전학회지
    • /
    • 제28권3호
    • /
    • pp.95-99
    • /
    • 2013
  • The goal of this study was to investigate some significant factors to influence level of safety at plant construction field and analyze degree of risk by work classification. Currently, there are lots of construction fields for the nuclear power plant for electricity generation, and our government also planned constructing more nuclear power plant in near future. However, much of the safety literature neglected the degree of risk factors on the plant construction field. Safety managers participated in the brainstorming session for drawing decision criteria of the degree of risk (i.e., significant factors). Then, they were asked to answer a structured questionnaire which was developed for drawing most important factors. Finally, the analytic hierarchy process (AHP) was used to analyze level of risk by work classification. The following results were obtained. First, total twelve factors judging degree of risk were found in the brainstorming session. Second, the questionnaire showed four significant factors, including number of workers, working environments, skill of craft and accident experience. Third, the results of AHP showed Architecture work is the most dangerous work among 6 work types. The results could be used to reduce degree of risk in construction field of the nuclear power plant.

원자력 발전에 대한 국민 신뢰감 회복 PR 정책방안 (A Public Relations Policy Studies on Recovered Confidence of the People for a Nuclear Power Plant)

  • 유승엽
    • 디지털융복합연구
    • /
    • 제11권10호
    • /
    • pp.287-294
    • /
    • 2013
  • 본 연구는 원자력 발전에 대한 국민 신뢰감 회복을 위한 홍보정책 방안을 제시하고자 하였다. 이를 위해 기존에 여론조사와 2차 자료를 검토하여 원전 안전에 대한 국민 불신감 문제점을 제기하였으며, 메타분석을 활용하여 자료를 분석하였다. 원전에 대한 국민 신뢰감 회복 홍보정책은 크게 세 가지를 제시하였다. 첫째, 원전에 대한 경제성/안전성 소통전략을 단기적/장기적 측면에서 제안하였다. 둘째, 원전 신뢰성 강화 소통전략을 단기적/장기적 측면에서 제안하였다. 끝으로, 한국수력원자력의 장기적 이미지 구축방안을 제안하였다. 본 연구결과는 한국의 원자력 발전에 대한 신뢰감을 증대시키는 효과를 제시할 것으로 기대한다.

A Quantitative Team Situation Awareness Measurement Method Considering Technical and Nontechnical Skills of Teams

  • Yim, Ho Bin;Seong, Poong Hyun
    • Nuclear Engineering and Technology
    • /
    • 제48권1호
    • /
    • pp.144-152
    • /
    • 2016
  • Human capabilities, such as technical/nontechnical skills, have begun to be recognized as crucial factors for nuclear safety. One of the most common ways to improve human capabilities in general is training. The nuclear industry has constantly developed and used training as a tool to increase plant efficiency and safety. An integrated training framework was suggested for one of those efforts, especially during simulation training sessions of nuclear power plant operation teams. The developed training evaluation methods are based on measuring the levels of situation awareness of teams in terms of the level of shared confidence and consensus as well as the accuracy of team situation awareness. Verification of the developed methods was conducted by analyzing the training data of real nuclear power plant operation teams. The teams that achieved higher level of shared confidence showed better performance in solving problem situations when coupled with high consensus index values. The accuracy of nuclear power plant operation teams' situation awareness was approximately the same or showed a similar trend as that of senior reactor operators' situation awareness calculated by a situation awareness accuracy index (SAAI). Teams that had higher SAAI values performed better and faster than those that had lower SAAI values.

Human resource development and needs analysis for nuclear power plant deployment in Nigeria

  • Egieya, Jafaru M.;Ayo-Imoru, Ronke M.;Ewim, Daniel R.E.;Agedah, Ebisomu C.
    • Nuclear Engineering and Technology
    • /
    • 제54권2호
    • /
    • pp.749-763
    • /
    • 2022
  • The fulcrum of economic development is a sustainable supply of electricity. Nigeria is plagued with blackouts, with one of the lowest per capita electricity consumption in the world (circa. 120 kWh per capita). Hence, policies have been instigated to integrate electricity generation from nuclear power plants (NPP) on or before 2027. However, a critical requirement for NPP generation is the implementation of robust human resource development (HRD) programs. This paper presents the perspective of Nigeria in assessing human resources needs over the entire NPP lifecycle following the milestone approach and employing the IAEA's Nuclear Power Human Resource (NPHR) modeling tool. Three workforce organizations are in focus including the owner/operator, regulators, and construction workers following three decades timeframe (2015-2045). The results indicate that for the study period, a maximum of approximately 9045 personnel (73% construction workers, 24% owner/operator, and 3% regulators) should be directly involved in the NPP program just before the commissioning of the third NPP in 2033. However, this number decreases by about 73% (2465 personnel including 94% operator and 6% regulator) at the end of the study timeframe. The results can potentially provide clarity and guidance in HRD decision-making programs.