Analysis of Battery Performance Test for DC Power System in Nuclear Power Plant (원자력발전소 직류전원계통용 축전지 성능시험 분석)

  • Kim, Daesik;Cha, Hanju
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.63 no.2
    • /
    • pp.61-68
    • /
    • 2014
  • Function of battery bank stores energy for DC load in general, and DC power system of the nuclear power plant is used to supply DC loads for safety- featured instrumentation and control such as inverter, class 1E power system control and indication, and station annunciation. Class 1E DC power system must provide a power for the design basis accident conditions, and adequate capacity must be available during loss of AC power and subsequent safe shutdown of the plant. In present, batteries of Class 1E DC power system of the nuclear power plant uses lead-acid batteries. Class 1E batteries of nuclear power plants in Korea are summarized in terms of specification, such as capacity, discharge rate, bank configuration and discharge end voltage, etc. This paper summarizes standards of determining battery size for the nuclear power plant, and analyzes duty cycle for the class 1E DC power system of nuclear power plant. Then, battery cell size is calculated as 2613Ah according to the standard. In addition, this paper analyzes performance test results during past 13 years and shows performance degradation in the battery bank. Performance tests in 2001 and 2005 represent that entire battery cells do not reach the discharge-end voltage. Howeyer, the discharge-end voltage is reached in 14.7% of channel A (17 EA), 13.8% of channel B (16 EA), 5.2% of channel C (6 EA) and 16.4% of channel D (19 EA) at 2011 performance test. Based on the performance test results analysis and size calculation, battery capacity and degradation by age in Korearn nuclear power plant is discussed and would be used for new design.

Plan of BIM-based Quantity Take-off for Nuclear Power Plant Decommissioning (BIM을 활용한 원전 해체 물량산출 방안)

  • Jung, In-Su;Won, Ji-Sun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.9
    • /
    • pp.6297-6304
    • /
    • 2015
  • Nuclear power plant decommissioning has attracted attention according to the shutdown decision of Kori 1 which is Korea's first nuclear power plant. Nuclear power plant decommissioning is the one who never experienced ever in our country. So, its process is difficult and time-consuming. In addition, it is difficult to determine the decommissioning quantity. This study proposed the plan that can be used in quantity take-off for nuclear power plant decommissioning using BIM technology being utilized in recent construction industry. As a result, we suggested the method of BIM-based quantity take-off such as the selection decommissioning method and process, setting up of BIM modeling environment, establishment of OBS & WBS, integrated BIM modeling, the definition of quantity property. The proposed plan can be utilized usefully from when permanent stopping nuclear power plant occurs intensively. Furthermore, the overseas nuclear power plant decommissioning project order also are expected through technology securement based on this plan.

Transient and stable expression of hepatitis B surface antigen in tomato (Lycopersicon esculentum L.)

  • Srinivas, L.;Sunil Kumar, G.B.;Ganapathi, T.R.;Revathi, C.J.;Bapat, V.A.
    • Plant Biotechnology Reports
    • /
    • v.2 no.1
    • /
    • pp.1-6
    • /
    • 2008
  • Cotyledonary leaves of tomato cv. Megha were transformed with the hepatitis B virus 's' gene, which encodes surface antigen. Six plant expression cassettes (pHBS, pHER, pEFEHBS, pEFEHER, pSHER and pEFESHER) were used to assay the possible expression levels by agroinfiltration. The maximum transient expression level of 489.5 ng/g D.W. was noted in pEFEHER-infiltrated cotyledonary leaves. Transgenic tomato plants with pEFEHBS and pEFEHER expression cassettes were regenerated and characterized by molecular analysis. The expression of the antigen in the fruits was confirmed by RT-PCR and ELISA analysis. This is the first report on the expression of hepatitis B surface antigen in tomato.

Safety assessment of Generation III nuclear power plant buildings subjected to commercial aircraft crash Part II: Structural damage and vibrations

  • Qu, Y.G.;Wu, H.;Xu, Z.Y.;Liu, X.;Dong, Z.F.;Fang, Q.
    • Nuclear Engineering and Technology
    • /
    • v.52 no.2
    • /
    • pp.397-416
    • /
    • 2020
  • Investigations of the commercial aircraft impact effect on nuclear island infrastructures have been drawing extensive attention, and this paper aims to perform the safety assessment of Generation III nuclear power plant (NPP) buildings subjected to typical commercial aircrafts crash. At present Part II, based on the verified finite element (FE) models of aircrafts Airbus A320 and A380, as well as the NPP containment and auxiliary buildings in Part I of this paper, the whole collision process is reproduced numerically by adopting the coupled missile-target interaction approach with the finite element code LS-DYNA. The impact induced damage of NPP plant under four impact locations of containment (cylinder, air intake, conical roof and PCS water tank) and two impact locations of auxiliary buildings (exterior wall and roof of spent fuel pool room) are evaluated. Furthermore, by considering the inner structures in the containment and raft foundation of NPP, the structural vibration analyses are conducted under two impact locations (middle height of cylinder, main control room in the auxiliary buildings). It indicates that, within the discussed scenarios, NPP structures can withstand the impact of both two aircrafts, while the functionality of internal equipment on higher floors will be affected to some extent under impact induced vibrations, and A380 aircraft will cause more serious structural damage and vibrations than A320 aircraft. The present work can provide helpful references to assess the safety of the structures and inner equipment of NPP plant under commercial aircraft impact.

Perception Survey of Nuclear Power after the Nuclear Plant and Thyroid Cancer Controversy (원자력발전소와 갑상선암 논란 이후 원자력에 대한 인식 조사)

  • Lee, Jae-Heon;Park, Eun-tae
    • Journal of the Korean Society of Radiology
    • /
    • v.11 no.1
    • /
    • pp.19-25
    • /
    • 2017
  • In this study, in order to analyze the general awareness of the nuclear power according to the controversy of thyroid cancer around nuclear plant, we investigated risks, preference and economics regarding type of power, and awareness of pre-post nucl ear power targeting the Busan Metropolitan residents. As a result, there has been a change in people's awareness of nuclear power as a result of the controversy thyroid cancer around nuclear plant. Especially, there was the greatest increase in the risk factors compared to before the event(p<0.05). Negative awareness of nuclear risk was shown to be expressed differently accor ding to the difference between groups. It is thought that this is due to the different prior experience of each individuals or obtained information through the interaction with others rather than on scientific and objective grounds. In order to establish a nuclear power policy considering the level of the people in the future, it seems that the efforts to understand the attitudes and opinions of people about nuclear power and above all, a scientific trust in nuclear power should be guaranteed.

Application of Low Voltage High Resistance Grounding in Nuclear Power Plants

  • Chang, Choong-Koo;Hassan, Mostafa Ahmed Fouad
    • Nuclear Engineering and Technology
    • /
    • v.48 no.1
    • /
    • pp.211-217
    • /
    • 2016
  • Most nuclear power plants now utilize solid grounded low voltage systems. For safety and reliability reasons, the low voltage (LV) high resistance grounding (HRG) system is also increasingly used in the pulp and paper, petroleum and chemical, and semiconductor industries. Fault detection is easiest and fastest with a solidly grounded system. However, a solidly grounded system has many limitations such as severe fault damage, poor reliability on essential circuits, and electrical noise caused by the high magnitude of ground fault currents. This paper will briefly address the strengths and weaknesses of LV grounding systems. An example of a low voltage HRG system in the LV system of a nuclear power plant will be presented. The HRG system is highly recommended for LV systems of nuclear power plants if sufficient considerations are provided to prevent nuisance tripping of ground fault relays and to avoid the deterioration of system reliability.

Fuel Cost Analysis of CANDU-PHWR Wolsung Nuclear Power Plant Unit 1

  • Lee, Ik-Hwan;Lee, Chang-Kun;Yang, Chang-Guk;Yook, Chong-Chul
    • Nuclear Engineering and Technology
    • /
    • v.9 no.3
    • /
    • pp.151-163
    • /
    • 1977
  • Being based on the Segal method, calculation was carried out for the natural uranium nuclear fuel cost with Zircaloy-4 cladding having design Parameters of Wolsung Nuclear Power Plant, CANDU-PHWR (Unit 1) , currently under construction in Korea aiming at its completion in 1982. An attempt was also made for tile sensitivity analysis of each fuel component; j. e., depreciation of fuel manufacturing plant caused by its life time, its load factor, production scale expansion of plant facilities, variations of construction and operating costs of fuel manufacturing plant, fluctuation of interest rates, extent of uranium ore price increases and effect of learning factor.

  • PDF

Development of the Large Tubesheet Forgings for Nuclear Power Plant (원자력 발전소용 대형 튜브시트 단강품의 개발)

  • Kim, D.K.;Kim, Y.D.;Kim, D.Y.
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 2006.05a
    • /
    • pp.176-179
    • /
    • 2006
  • Large tubesheet forgings of the steam generator for the 1,400MW nuclear power plant has been developed. Steam Generator is one of the most important structural part for nuclear power plant. It is manufactured by various steel forgings such as shell, head, torus and tubesheet. These steel forgings have been made by open die forging process. After steel melting and ingot making, open die forging has been carried out to get a good quality which means high soundness and homogeniety of the steel forgings by using high capacity hydraulic press. This paper introduced the forging process development and manufacturing experience of large tubesheet forgings which will be used for the steam generator of 1,400MW nuclear power plant.

  • PDF

Selection and Analysis of Operating Parameters for Condition Monitoring of Emergency Diesel Generator at Nuclear Power Plant (원자력발전소 비상디젤발전기 상태감시를 위한 운전인자 선정에 관한 연구)

  • Park, J.H.;Choi, K.H.;Lee, S.G.;Park, J.E.
    • Journal of Power System Engineering
    • /
    • v.11 no.3
    • /
    • pp.3-8
    • /
    • 2007
  • The emergency AC power supply system of the nuclear power plant is designed to supply the power to the nuclear reactor at the emergency operating condition. The safety function of the diesel generator at the nuclear power plant is to supply AC electric power to the plant safety system whenever the preferred AC power supply is unavailable. The reliable operation of onsite emergency diesel generator should be ensured by a conditioning monitoring system designed to maintain and monitor and forecast the reliability level of diesel generator. To do this kind of diesel generator condition monitoring we reviewed several operating factors and history of the wolsong unit 3 diesel generator and selected the proper conditioning monitoring operating factors.

  • PDF

A Study on Loss of Coolant Accident in Nuclear Power Plant Using DOE (실험계획법을 이용한 원자력 발전소에서의 냉각제 상실사고에 대한 연구)

  • Leem Young-Moon;Lee Sung-Mo
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.4
    • /
    • pp.85-99
    • /
    • 2005
  • The main objective of this paper is to search whether containment vessel's best pressure may increase until how long when loss of coolant accident (LOCA) happened in containment vessel of Ulchin nuclear power plant 1 and 2. Another goal of this research is to find the influential factors that increase containment vessel pressure. Model for this research is Ulchin nuclear power plant 1 with 10 cycles. Data were collected by simulator of Ulchin nuclear power plant 1 and design of experiment was used for data analysis. For the experiment, seven factors that are going to influence in containment vessel pressure were chosen. It was found that fatter which influences in early rise of containment vessel pressure after LOCA is only explosion size. Also, containment vessel's best pressure (3.74 bar.a) was much lower than limit (4.86 bar.a) of FSAR (Final Safety Analysis Report).