• 제목/요약/키워드: Nuclear components

검색결과 1,073건 처리시간 0.025초

Steady-State Performance Analysis of Pressurizer and Helical Steam Generator for SMART

  • Seo, Jae-Kwang;Kang, Hyung-Seok;Kim, Hwan-Yeol;Cho, Bong-Hyun;Lee, Doo-Jeong
    • 한국원자력학회:학술대회논문집
    • /
    • 한국원자력학회 1997년도 춘계학술발표회논문집(1)
    • /
    • pp.310-315
    • /
    • 1997
  • System-Integrated Modular Advanced Reactor (SMART), where major primary components such as modular helical steam generator and self regulating pressurizer are integrated into reactor vessel, is currently under development. The pressurizer is designed to control the primary pressure mainly with partial pressure of nitrogen gas and to maintain the fluid temperature as low as possible for the purpose of minimizing steam contribution. The steam generator (SG) is designed to produce super-heated steam inside tube at power operation. Because the in-vessel pressurizer and in-vessel SG are classified as the characteristic components of SMART, it is important to perform a steady state calculation of these components in order to evaluate the adoption of these components. A steady state analysis of the in-vessel pressurizer and in-vessel SG has been performed under normal power operation and the results show an acceptable performance of the components.

  • PDF

원전 배관의 반복 측정 데이터에 대한 신뢰도 분석 방법 (Reliability Analysis Method for Repeated UT Measurement Data in Nuclear Power Plants)

  • 윤훈;황경모
    • Corrosion Science and Technology
    • /
    • 제12권3호
    • /
    • pp.142-148
    • /
    • 2013
  • Safety is a major concern in Nuclear Power Plants (NPPs). Piping systems in NPPs are very complex and composed of many components such as tees, elbows, expanders and straight pipes. The high pressure and high temperature water flows inside piping components. As high speed water flows inside piping, the pipe wall thinning occurs in various reasons such as FAC (Flow Accelerated Corrosion), LDIE (Liquid Droplet Impingement Erosion) and Flashing. To inspect the wall thinning phenomenon and protect the piping from damages, piping components are checked by UT measurement in every overhaul. During every overhaul, approximately 200~300 components (40,000~60,000 UT data) are examined in NPPs. There are some methods from EPRI for evaluating wear rate of components. However, only few studies have been conducted to find out the raw data reliability for the wear rate evaluation. Securing the reliable raw data is the key factor for a reasonable evaluation. This paper suggests the reliability analysis method for the repeatedly measured data for wear rate evaluation.

신규원전 여유도 관리 방안 연구 (A Study on the method of Margin Management for New Nuclear Power Plant)

  • 박유진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.151-152
    • /
    • 2018
  • In the domestic nuclear power industry, concern about safety of nuclear power plants is continuously increased with the Fukushima nuclear power plant accident. In order to enhance the safety of nuclear power plants, it is important to ensure that the power plants are operating with proper margin within the original design bases. Margin management is the process of ensuring that the NPP designer and operator are aware of the physical and operating limits, and potential and probability of failure, for each component in the plant. All components are subject to margin considerations, but the most important components by scope and attention are those related to safety-related systems and NPP safe shutdown.

  • PDF

원전 기기 용접 잔류응력 평가 연구 고찰 (Investigation on the Studies for Welding Residual Stresses in Nuclear Components)

  • 김종성
    • 한국압력기기공학회 논문집
    • /
    • 제12권1호
    • /
    • pp.30-40
    • /
    • 2016
  • The paper investigates the previous studies about welding residual stresses in nuclear components. First, various residual stress measurement methods are reviewed in applicability. Second a finite element welding residual stress analysis technique, which was developed from the viewpoint of FFS (Fitness-For-Service) assessment, is explained. Third, characteristics of the welding residual stresses on J-groove welds and butt welds were presented via investigating the previous studies. Last, engineering formulae for residual stresses in the FFS assessment codes such as R6 and API 579/ASME FFS-1 Code is summarized.

원전 주요기기의 확률론적 평가 기법 (Probabilistic Evaluation Methodology for Nuclear Components)

  • 이준성;곽상록;김영진;박윤원
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2001년도 춘계학술대회논문집A
    • /
    • pp.459-464
    • /
    • 2001
  • For major nuclear power plant components periodic inspections and integrity assessments are needed for the safety. But many flaws are undetectable due to sampling inspection. Probabilistic integrity assessment is applied to take into consideration of uncertainty and variance of input parameters arise due to material properties, applied load and undetectable flaws. This paper describes a Probabilistic Fracture Mechanics(PFM) analysis based on Monte Carlo(MC) algorithms. Taking important parameters as probabilistic variables such as fracture toughness, crack growth rate and flaw shape, failure probability of major nuclear power plant components is archived as a results of MC simulation. For the verification of these analysis, a comparison study of the PFM analysis using other commercial code, mathematical method is carried out and a good agreement was observed between those results.

  • PDF

월성 원자력 발전소 1호기의 디지탈 제어컴퓨터 부품들의 최적교체주기에 관한연구 (A Study on the Optimal Replacement Periods of Digital Control Computer's Components of Wolsung Nuclear Power Plant Unit 1)

  • Mok, Jin-Il;Seong, Poong-Hyun
    • Nuclear Engineering and Technology
    • /
    • 제25권3호
    • /
    • pp.430-436
    • /
    • 1993
  • 원자력 발전소의 제어계측 장비의 노후화 때문에, 원자력 발전소에서는 제어계측 장비의 고장으로 인한 발전소 불시정지가 가끔 일어난다. 원자력 발전소의 불시정지는 커다란 경제적 손실과 발전소의 신뢰도를 떨어뜨리고 대중적인 인식을 좋지 않게 한다. 그러므로 불필요한 불시정지를 방지하기 위해서 제어계측 부품의 노후화를 고려한 부품교체를 해주는 것이 필요하다. 이 논문은 월성 원자력 발전소의 제어 컴퓨터 부품의 최적교체주기에 대해 연구했다. 우리는 먼저 월성 디지탈 제어 컴퓨터 부품의 최적교체주기에 대한 수학적 모델을 유도했고, 해석적으로 최적교체주기를 계산했다. 우리는 그결과를 현재 월성 원자력 발전소에서 쓰이는 방법과 비교했다. 월성에서 사용되는 방법은 수학적 분석 방법이 아닌 경험적 지식을 토대로 한것이다. 결과적으로 해석적으로 얻어진 최적 교체주기와 월성에서 사용되는 교체주기와는 약간의 차이를 보이고 있다.

  • PDF

원자력발전소 전기기기의 보수, 교체 방법론 (Repair and Replacement Methodology for Electrical Equipment Used in Nuclear Power Plants)

  • 박철희;박완규;이만복;김춘삼
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2018년도 전력전자학술대회
    • /
    • pp.177-179
    • /
    • 2018
  • After Fukushima nuclear accident at 2011, nuclear industrial has been focused on operation and maintenance phase, not design and construction phase. Continued good operating performance of nuclear power plants has been the best critical issue to nuclear utilities. Replacement for complete components as well as parts of components is being procured because nuclear utilities must maintain safety and reliability of operating nuclear power plants. However, many suppliers and manufacturers are giving up a nuclear quality assurance program under reduction in new construction of nuclear power plants. It is able to be increased difficulty in procuring spare parts to support operations and maintenance of nuclear power plants. Over 20% of nuclear power plant equipment in some countries is obsolete. Owing to obsolescence of nuclear safety-related items and/or withdrawing a nuclear quality assurance program of suppliers and manufactures, some replacement item and part might be procured to the item not covered by appendix B to USNRC 10 CFR Part 50. Under various methods of the nuclear repair and replacement methodology, utilities are supposed to establish a typical program for a repair and replacement of an electrical equipment and its parts in conjunction with a nuclear quality assurance. Concerning this typical program, this study suggests the repair and replacement methodology of electrical equipments used in nuclear power plants by procurement of a power supply, based on nuclear regulations, codes, standards, guidelines, specific and general technical information, etc..

  • PDF

IMPROVEMENT OF CUPID CODE FOR SIMULATING FILMWISE STEAM CONDENSATION IN THE PRESENCE OF NONCONDENSABLE GASES

  • LEE, JEHEE;PARK, GOON-CHERL;CHO, HYOUNG KYU
    • Nuclear Engineering and Technology
    • /
    • 제47권5호
    • /
    • pp.567-578
    • /
    • 2015
  • In a nuclear reactor containment, wall condensation forms with noncondensable gases and their accumulation near the condensate film leads to a significant reduction in heat transfer. In the framework of nuclear reactor safety, the film condensation in the presence of noncondensable gases is of high relevance with regards to safety concerns as it is closely associated with peak pressure predictions for containment integrity and the performance of components installed for containment cooling in accident conditions. In the present study, CUPID code, which has been developed by KAERI for the analysis of transient two-phase flows in nuclear reactor components, is improved for simulating film condensation in the presence of noncondensable gases. In order to evaluate the condensate heat transfer accurately in a large system using the two-fluid model, a mass diffusion model, a liquid film model, and a wall film condensation model were implemented into CUPID. For the condensation simulation, a wall function approach with a heat/mass transfer analogy was applied in order to save computational time without considerable refinement for the boundary layer. This paper presents the implemented wall film condensation model, and then introduces the simulation result using the improved CUPID for a conceptual condensation problem in a large system.

Preparation of the Applicable Regulatory Guideline on Mixed Waste in Korea Based on the Analysis of US Laws and Regulations

  • Sim, Eun-Jin;Lee, Sun-Kee;Kim, Chang-Lak;Kim, Tae-Man
    • 방사성폐기물학회지
    • /
    • 제19권1호
    • /
    • pp.141-160
    • /
    • 2021
  • Unit 1 of the Kori Nuclear Power Plant (NPP) and Unit 1 of the Wolsong NPP are being prepared for decommissioning; their decommissioning is expected to generate large amounts of intermediate-level, low-level, and very low level Waste. Mixed waste containing both radioactive and hazardous substances is expected to be produced. Nevertheless, laws and regulations, such as the Korean Nuclear Safety Act and Waste Management Act, do not define clear regulatory guidelines for mixed waste. However, the United States has strictly enforced regulations on mixed waste, focusing on the human health and environmental effects of its hazardous components. The U.S. Nuclear Regulatory Commission and the U.S. Department of Energy regulate the radioactive components of mixed waste under the Atomic Energy Act. The U.S. Environmental Protection Agency regulates the hazardous waste component of mixed waste under the Resource Conservation and Recovery Act. In this study, the laws, regulations, and authorities pertaining to mixed waste in the United States are reviewed. Through comparison and analysis with waste management laws and regulations in Korea, a treatment direction for mixed waste is suggested. Such a treatment for mixed waste will increase the efficiency of managing mixed waste when decommissioning NPPs in the near future.

A spent nuclear fuel source term calculation code BESNA with a new modified predictor-corrector scheme

  • Duy Long Ta ;Ser Gi Hong ;Dae Sik Yook
    • Nuclear Engineering and Technology
    • /
    • 제54권12호
    • /
    • pp.4722-4730
    • /
    • 2022
  • This paper introduces a new point depletion-based source term calculation code named BESNA (Bateman Equation Solver for Nuclear Applications), which is aimed to estimate nuclide inventories and source terms from spent nuclear fuels. The BESNA code employs a new modified CE/CM (Constant Extrapolation - Constant Midpoint) predictor-corrector scheme in depletion calculations for improving computational efficiency. In this modified CE/CM scheme, the decay components leading to the large norm of the depletion matrix are excluded in the corrector, and hence the corrector calculation involves only the reaction components, which can be efficiently solved with the Talyor Expansion Method (TEM). The numerical test shows that the new scheme substantially reduces computing time without loss of accuracy in comparison with the conventional scheme using CRAM (Chebyshev Rational Approximation Method), especially when the substep calculations are applied. The depletion calculation and source term estimation capability of BESNA are verified and validated through several problems, where results from BESNA are compared with those calculated by other codes as well as measured data. The analysis results show the computational efficiency of the new modified scheme and the reliability of BESNA in both isotopic predictions and source term estimations.