Communication Ocean Meteorological Satellite (COMS) for the hybrid mission of meteorological observation, ocean monitoring, and telecommunication service was launched onto Geostationary Earth Orbit on June 27, 2010 and it is currently under normal operation service on $128.2^{\circ}$ East of the geostationary orbit since April 2011. In order to perform the three missions, the COMS has 3 separate payloads, the meteorological imager (MI), the Geostationary Ocean Color Imager (GOCI), and the Ka-band antenna. The MI and GOCI perform the Earth observation mission of meteorological observation and ocean monitoring, respectively. For this Earth observation mission the COMS requires daily mission commands from the satellite control ground station and daily mission is affected by the satellite control activities. For this reason daily mission planning is required. The Earth observation mission operation of COMS is described in aspects of mission operation characteristics and mission planning for the normal operation services of meteorological observation and ocean monitoring. And the first one-year normal operation results after the In-Orbit-Test (IOT) are investigated through statistical approach to provide the achieved COMS normal operation status for the Earth observation mission.
This study aimed to obtain quantitative data for WWTP operators in phosphorus removal process. This was done by reviewing and comparing phosphorus removal efficiency(%), coagulants dosage(Al/P and $Al_2O_3$(mg/L)), sludge production($kg/m^3$), and operation cost($won/m^3$) of start-up and normal operation data. Phosphorus removal efficiency of all tertiary treatment process was up to 70 ~ 89 % in start-up and normal operation. Average molar ratio(Al/P) was similar as 5 in both operations, but average coagulants dosage (mg/L) of start-up (8.5 mg/L) was higher than normal operation (6.2 mg/L). Average operation cost was higher for start-up ($33.6won/m^3$) than normal operation ($28.4won/m^3$), while electricity cost required for the normal operation ($9.0won/m^3$) was higher by $3.5won/m^3$.
In this study, we determined the failure rate and fire status of electric motors widely used in domestic and industrial devices and analyzed the associated fire risks by identifying the electrical and temperature characteristics of electric motors under the normal and restrained operation modes in industrial sites and laboratories. A 2.2kW motor used for driving a conveyor during the vulcanization process in a rubber product manufacturing plant was employed as the study object and was exposed to a high- temperature environment as this motor is widely used in industrial sites. The current amplitude was 4.45-4.50 A during normal operation and 38.2-41.5 A during restrained operation due to the pinching of products and semi-finished products (i.e., 8.5 times higher than that during normal operation). The leakage current amplitude was 0.33 mA during both operation modes. The temperature of the workplace in summer was 42.38℃, indicating a poor environment for the installed motor. In the laboratory, the current and temperature of the coil inside a 3.7kW motor were measured under the restrained operation mode as performing measurements of the coil inside the motor in industrial sites is challenging. The current amplitude during normal operation was 3.5 A, whereas that during restrained operation for 30 s was 51.7-58.6 A, which is 14.8-16.7 times higher than that of normal operation. Moreover, the temperature of the motor coil increased from 22.9℃ to 101℃. Based on the experimental data, we derived the temperature increase formula according to the restrained operation time by performing a regression analysis and verified the time at which the temperature exceeded the stipulated limit for the insulation grade. The findings presented in this paper can be utilized to establish fire-prevention measures and perform safety management of motors of the same type or with a similar capacity.
Journal of Korean Society of Occupational and Environmental Hygiene
/
v.18
no.1
/
pp.80-90
/
2008
This study was carried out to investigate the correlation of urinary NMF concentration in workers exposed to DMF and concentration of DMF in the workplace. Samples were collected in workers exposed to high dose solvent in the synthetic leather factory by using silicagel tubes for 5-15 minutes, and were analyzed by GC. Geometric mean concentrations of DMF in the workplaces were 4.67 ppm in normal operation and 63.95 ppm in high exposure operation. The concentration of case uppers and machine cleaning process were more than 100 ppm in short time. The correlation of urinary NMF in workers and DMF in workplace was statistically significant in normal operation and high exposure operation. Correlation coefficient are 0.215(p<0.05) and 0.263(p<0.05). The result implied that STEL of DMF should be established in normal operation processes as well as high exposure operation processes.
The changes of serum glutamic oxaloacetic transaminase [SGOT], serum glutamic pyruvic transaminase [SGPT], serum lactic dehydrogenase [LDH] and serum creatine phosphokinase [CPK] were examined during and after the open heart surgery. In the total of 52 patients with heart diseases including 40 cases of congenital heart anomalies and 12 cases of acquired valvular heart diseases who undergone open heart surgery under cardiopulmonary bypass. The results obtained are as follows: 1. The average value of SGOT before surgery was 30.27 [ 18:86 units. The enzyme was reached to the maximum of 139.88 [ 89.43 units on the 1st day after the operation [p< 0.05], the enzyme activity was gradually decreased from the 3rd day after the operation, returned to the normal range on the 7th day after the operation. 2. The average value of SGPT before surgery was 14.36 [ 7.45 units. The enzyme was reached to the maximum of 34.67 [ 27.64 units on the 2nd day after the operation, but it was valueless statistically, the enzyme activity was gradually decreased from the 3rd day after the operation, returned to the normal range on the 5th day after the operation. 3. The average value of LDH before surgery was 263.07 * 86.66 units. The enzyme was reached to the maximum of 662.29 * 303.60 units on the 2nd day after the operation [p < 0.05], the enzyme activity was gradually decreased from the 5th day after the operation, returned to the normal range on the 7th day after the operation. 4. The average value of CPK before surgery was 141.35 * 43.44 units. The enzyme was reached to the maximum of 377.42 [ 222.02 units on the 1st day after the operation [p < 0.05], the enzyme activity was gradually decreased from the 5th day after the operation, returned to the normal range on the 7th day after the operation. 5. In the relationships of the serum enzymes and duration of the extracorporeal circulation, the values on the group over 90 minute of the extracorporeal circulation were increased than on the group below 90 minute of the extracorporeal circulation, but it was valueless statistically.
Communication Ocean Meteorological Satellite (COMS) has the hybrid mission of meteorological observation, ocean monitoring, and telecommunication service. The COMS is located at $128.2^{\circ}$ East longitude on the geostationary orbit and currently under normal operation service since April 2011. For the sake of the executions of the meteorological and the ocean mission as well as the satellite control and management, the satellite mission planning is daily performed. The satellite mission plans are sent to the satellite by the real-time operation and the satellite executes the missions as per the mission plans. In this paper the mission planning for COMS normal operation is discussed in terms of the ground station configuration and the characteristics of daily, weekly, monthly, and seasonal mission planning activities. The successful mission planning is also confirmed with the first one-year normal operation results.
Journal of the Korean Society for Aviation and Aeronautics
/
v.29
no.2
/
pp.111-116
/
2021
Normal Operation Safety Survey (NOSS) is a safety management tool used by air traffic control organizations to measure data related to threats and errors to proactively prevent accidents before they occur. NOSS was developed to be applied to the air traffic control field according to the concept of Line Operation Safety Audit (LOSA) conducted by airlines to reduce human errors in the cockpits. Safety management based on data is crucial for the prevention of control-related accidents, and the competency of observers for this is important for the successful implementation of NOSS. Based on LOSA implementation experiences and expert interviews, this paper introduces the international NOSS methods and discusses the key factors required for effective observation and the implementation methods and implications of NOSS observer training.
Activities of serum glutamic pyruvic transaminase [SGPT], serum glutamic oxaloacetic transaminase [SGOT] and serum lactic dehydrogenase [LDH] were determined during and after surgery In a total of 18 patients with heart diseases Including 8 cases of congenital heart anomaly and 10 cases of acquired valvular diseases who undergone open heart surgery under cardiopulmonary bypass. The results obtained are as follows: 1]The average value of the activity of SGPT before the surgery was $27.94{\pm}12.24$ units. The value was increased following the operation and reached to the maximum value of $43.83{\pm}37.02$ units 2 days after the operation, which was slightly deviated from the normal range. The enzyme activity returned to the normal range of $32.82{\pm}23.61$ units 4 days after the operation. 2]The average value of the activity of SGOT before the surgery was observed to be $30.5{\pm}11.29$ units. The value increased during the operation and reached to the maximum value of $95.56{\pm}43.38$ units. 2 days after the operation, the enzyme activity was gradually decreased thereafter and returned to the normal range 6 days after the operation. 3]The average value of the activity of serum LDH before the surgery was found to be $258.0{\pm}88.96$ units. The value was increased during the operation and reached to the maximum value of $930.55{\pm} 258.23$ units 2 days after the operation. The enzyme activity was gradually decreased thereafter and returned to normal range 7 days after the operation. 4]It was observed that the longer the time required for the extracorporeal circulation in the open heart surgery became, the greater the changed in activity of SGOT, SGPT and serum LDH were found.
Trains in LRT(Light Railway Transit) system usually have shorter car length than metro's because of their smaller passensers demand. Therefore it is very likely that the load condition of LRT system in abnormal operation, in case of which trains are in close proximity by system broke or train rescue works, could be worse rather than in normal operation, in spite of rare probability of abnormal operation. In this study, the target reliability indexes of several abnormal operations are estimated in accordance with the occurrence probabilities of each abnormal operation case and the reliability index of normal operation presented by the specification. From the indexes, load factors for the abnormal operation cases are estimated and the safety evaluation is performed for Yong-in LRT project.
KIEE International Transactions on Power Engineering
/
v.12A
no.1
/
pp.31-35
/
2002
This paper presents a new operation scheme of UPFC to minimize both generation costs and active power losses in a normal operation state of power system. In a normal operation, cost minimization is a matter of primary concern among operating objectives. This paper considers two kinds of costs, generation costs and transmission losses. The total generation cost of active powers can be minimized by optimal power flow, and active power losses in the transmission system can be also minimized by power flow control of UPFC incorporated with minimization of generation costs. In order to determine amounts of active power reference of each UPFC required for the cost minimization, an iterative optimization algorithm based on the power flow calculation using the decoupled UPFC model is proposed. For verification of the proposed method, intensive studies have been performed on a 3-unit 6-bus system equipped with a UPFC.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.