• Title/Summary/Keyword: New Project

Search Result 3,237, Processing Time 0.033 seconds

A GIS-Based Method for Route-Alignment in Transportation Infrastructure Projects (GIS를 활용한 교통시설사업의 노선선정 방법 연구)

  • 양광식
    • Spatial Information Research
    • /
    • v.8 no.1
    • /
    • pp.117-130
    • /
    • 2000
  • This paper presents a GIS-based method of spatial analysis that can be applied to the line determination in traffic infrastructure project . It is based on the spatial analysis of the sensitivity or suitability of areas relating to the integration of new infrastructure routes, carefully considering the requirement of intervention optimizing . It makes the comparison of alternatives and a final selection of a"best route " easier, offers new possibilities and simplifies and accelerates the whole process of line determination. The developed method for route-alignment is tried out by an example project for road planing in Germany. It point out that during the line determination all aspects can be equivalently and adequately evaluated. So this method is well suited as a new tool within a line determination procedure and can bring enormous advantages in the planning process of traffic infrastructure projects. projects.

  • PDF

Financial Analysis and Validity Study for the Introduction of Liquid Hydrogen in Changwon City (창원시 액화수소 도입에 따른 재무성 분석 및 타당성 검토)

  • KANG, BOO MIN;JEONG, CHANG-HOON;HA, SEUNG WOO;JIN, HONG-DEOK;KIM, HAK-MIN;JEONG, DAE-WOON
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.33 no.4
    • /
    • pp.293-300
    • /
    • 2022
  • The Changwon city which announced 2040 hydrogen policy vision is planning to establish the new hydrogen-centered city. The building of plant which is available to produce the 5 ton/day of liquid hydrogen is promoted as one of the projects in order to achieve the vision. However, the analysis in terms of local economic and environmental aspects is insufficient because this liquid hydrogen plant is the first in Korea. Therefore, in this study, the financial feasibility of the liquid hydrogen plant project was analyzed by reviewing the benefits of liquid hydrogen supply and environmental improvement, and the feasibility of this project has been investigated which is being built based on the hydrogen industrial plan of Changwon city.

Virtual Interactive Construction Education (VICE) using BIM Tools

  • James D. Goedert;Yong K. Cho;Mahadevan Subramaniam;Ling Xiao
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.781-787
    • /
    • 2009
  • Training and process analysis in the construction industry has not taken full advantage of new technologies such as building information modeling(BIM). The purpose of this research is to develop a framework for the virtual interactive construction education system using three dimensional technologies. The modules will simulate the construction process for a facility from start to finish using information drawn from real projects in the built environment. These modules can be used as training tools for new employees where they attempt to optimize time and cost in a virtual environment given a limited number of equipment, time and employee options. They can also be used as a process analysis tool for new construction where a number of situational variables can change leading to exposure of potential risk. These modules would be particularly useful for repetitive construction where the initial project is analyzed for optimization and risk mitigation. This paper describes the framework and shows a residential construction example using a 900 square foot wood frame single family house designed for the United States.

  • PDF

prEN 1991-1-4:2021: the draft Second Generation Eurocode on wind actions on structures - A personal view

  • Francesco Ricciardelli
    • Wind and Structures
    • /
    • v.37 no.2
    • /
    • pp.79-94
    • /
    • 2023
  • This paper traces the drafting of the new EN 1991-1-4 Eurocode 1 - Actions on structures - Part 1-4: General actions - Wind actions within Mandate M/515 of the European Commission to CEN, for the evolution of structural Eurocodes towards their Second Generation. Work of the Project Team started in August 2017 and ended in April 2020, with delivery of a final draft for public enquiry. The revised document contains several modifications with respect to the existing 2005 version, and new sections were added, covering aspect not dealt with in the previous version. It has a renovated structure, with a main text limited in size and containing only fundamental material; all the remaining information, either normative or informative is arranged into thirteen annexes. Common to other Eurocode Parts, general requests from CEN were those of reducing the number of Nationally Determined Parameters and of enhancing the ease of use. More specific requests were those of (a) the drafting of a European design wind map, (b) improving wind models, (c) reviewing force and pressure coefficients, (d) reviewing the procedures for evaluation of the dynamic response, as well as (e) making editorial improvements aimed at a more user friendly document. The author had the privilege to serve as Project Team member for the drafting of the new document, and this paper brings his personal view concerning some general aspects of wind code writing, and some more specific aspects about the particular document.

TREE FORM CLASSIFICATION OF OWNER PAYMENT BEHAVIOUR

  • Hanh Tran;David G. Carmichael;Maria C. A. Balatbat
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.526-533
    • /
    • 2011
  • Contracting is said to be a high-risk business, and a common cause of business failure is related to cash management. A contractor's financial viability depends heavily on how actual payments from an owner deviate from those defined in the contract. The paper presents a method for contractors to evaluate the punctuality and fullness of owner payments based on historical behaviour. It does this by classifying owners according to their late and incomplete payment practices. A payment profile of an owner, in the form of aging claims submitted by the contractor, is used as a basis for the method's development. Regression trees are constructed based on three predictor variables, namely, the average time to payment following a claim, the total amount ending up being paid within a certain period and the level of variability in claim response times. The Tree package in the publicly available R program is used for building the trees. The analysis is particularly useful for contractors at the pre-tendering stage, when contractors predict the likely payment scenario in an upcoming project. Based on the method, the contractor can decide whether to tender or not tender, or adjust its financial preparations accordingly. The paper is a contribution in risk management applied to claim and dispute resolution practice. It is argued that by contractors having a better understanding of owner payment behaviour, fewer disputes and contractor business failures will occur.

  • PDF

A Study on the Application of Suitable Urban Regeneration Project Types Reflecting the Spatial Characteristics of Urban Declining Areas (도시 쇠퇴지역 공간 특성을 반영한 적합 도시재생 사업유형 적용방안 연구)

  • CHO, Don-Cherl;SHIN, Dong-Bin
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.24 no.4
    • /
    • pp.148-163
    • /
    • 2021
  • The diversification of the New Deal urban regeneration projects, that started in 2017 in accordance with the "Special Act on Urban Regeneration Activation and Support", generated the increased demand for the accuracy of data-driven diagnosis and project type forecast. Thus, this research was conducted to develop an application model able to identify the most appropriate New Deal project type for "eup", "myeon" and "dong" across the country. Data for application model development were collected through Statistical geographic information service(SGIS) and the 'Urban Regeneration Comprehensive Information Open System' of the Urban Regeneration Information System, and data for the analysis model was constructed through data pre-processing. Four models were derived and simulations were performed through polynomial regression analysis and multinomial logistic regression analysis for the application of the appropriate New Deal project type. I verified the applicability and validity of the four models by the comparative analysis of spatial distribution of the previously selected New Deal projects by targeting the sites located in Seoul by each model and the result showed that the DI-54 model had the highest concordance rate.

Holistic, Collaborative, Ecological, and Coevolutionary Characteristics of Service Design Process

  • Lee, Dong-Seok
    • Journal of the Ergonomics Society of Korea
    • /
    • v.31 no.1
    • /
    • pp.7-13
    • /
    • 2012
  • Objective: This paper discussed the characteristics of service design process by comparing with product design process. Background: Service design has different design outcomes, project participants, and design constraints than product design. Method: The comparison took two perspectives: one was shorter-term, design process of a service, and the other was longer-term, process of service development. Results: It was discussed that service design process is similar in overall, but has four differences. First, the role of design is required earlier and longer in the process, which means service designers need to participate from the begging of the project to service operation. Thus service designers are required to have holistic viewpoint of the project. Second, service design requires many design expertise thus collaboration needs to be well defined and managed throughout the process. Third, since service provider has limited resources, regulations, and market competition, some service features cannot be provided. Service designers are required to know both customers' needs and functional constraints. Last, service design is highly coupled with service operation. Designing and providing service happens at the same time and evolves over time. Conclusion: Consequently it was asserted that the role of designers in service design is essential for success. In specific, the role of service design architect, who manages design process and design outcomes, is a new and important role in service design project.

A Study on the PLM for Construction Industry (건설산업에서의 PLM 설계에 관한 연구)

  • Noh, Sang-Do;Kim, Gun-Yeon;Lee, Sang-Seok;Kim, Jong-Hwan;Jung, Seung-Ho;Lee, Kwang-Myong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.253-258
    • /
    • 2008
  • PLM(Product Lifecycle Management) is one of innovative manufacturing paradigms which leverages e-business technologies to allow a company's product content to be developed and integrated with all company business process through the extended enterprise. In these days, most construction companies also make an effort to enhance their systems for creating, sharing and managing information to improve business efficiency through entire lifecycle of project execution. Because of different needs, business process and diverse engineering activities such as design, structural analysis, installing simulation, documents and data managements, a new paradigm for construction companies is needed to manage and share the entire workflow, and information in total project lifecycle. In this paper, we conducted user requirement and business process analysis of the construction to design architecture of C-PLM(Construction Project Lifecycle management) and implement a prototype of C-PLM systems based on commercial PDM system.

  • PDF

Assessment of Requirements for Successful Mobile Project Management Information Systems

  • Lee, Ung-Kyun;Jeong, Hyung Seok David;Woldesenbet, Asregedew
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.1
    • /
    • pp.45-53
    • /
    • 2014
  • The objective of this study is to assess the requirements of tablet PC-based PMIS applications designed for use on construction sites to determine whether these new programs can play a significant role in increasing the efficiency of a project. In this research, the current market conditions of PMIS running on a tablet PC were analyzed. In addition, two industry surveys were conducted. A research team interviewed some industry experts and identified fourteen useful and desirable functions that can be incorporated into tablet PC-based applications and project management tools. Through a questionnaire survey, the most effective functions for the tablet PC-based PMIS were identified. The three top-rated functions among those suggested were Contact Information for Job-Related Personnel; Receive and Respond to Submittals, RFIs, and Notices; and Problem Solving for Design and Engineering Issues. The results of this research are expected to provide helpful information for mobile application developers and members of other interested groups in the construction industry.

MONITORING OF MOUNTAINOUS AREAS USING SIMULATED IMAGES TO KOMPSAT-II

  • Chang Eun-Mi;Shin Soo-Hyun
    • Proceedings of the KSRS Conference
    • /
    • 2005.10a
    • /
    • pp.653-655
    • /
    • 2005
  • More than 70 percent of terrestrial territory of Korea is mountainous areas where degradation becomes serious year by year due to illegal tombs, expanding golf courses and stone mine development. We elaborate the potential usage of high resolution image for the monitoring of the phenomena. We made the classification of tombs and the statistical radiometric characteristics of graves were identified from this project. The graves could be classified to 4 groups from the field survey. As compared with grouping data after clustering and discriminant analysis, the two results coincided with each other. Object-oriented classification algorithm for feature extraction was theoretically researched in this project. And we did a pilot project, which was performed with mixed methods. That is, the conventional methods such as unsupervised and supervised classification were mixed up with the new method for feature extraction, object-oriented classification method. This methodology showed about $60\%$ classification accuracy for extracting tombs from satellite imagery. The extraction of tombs' geographical coordinates and graves themselves from satellite image was performed in this project. The stone mines and golf courses are extracted by NDVI and GVI. The accuracy of classification was around 89 percent. The location accuracy showed extraction of tombs from one-meter resolution image is cheaper and quicker way than GPS method. Finally we interviewed local government officers and made analyses on the current situation of mountainous area management and potential usage of KOMPSAT-II images. Based on the requirement analysis, we developed software, which is to management and monitoring system for mountainous area for local government.

  • PDF