• Title/Summary/Keyword: New Project

Search Result 3,230, Processing Time 0.028 seconds

Improvement of Resident's Participation on Renewable Energy Power Generation Project in Rural Area - Focused on the Rural Solar Power Generation Systems - (농촌지역 신재생에너지 발전사업 주민참여 활성화 연구 - 농촌태양광 시스템을 중심으로 -)

  • Lee, Chul-sung;Kim, Hyuk;Shin, Seung-wook;Park, Mi-lan
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.24 no.4
    • /
    • pp.107-115
    • /
    • 2022
  • This study investigated the status of resident participation in the policy of supplying new and renewable energy in rural areas. According to the survey, most of the rural residents were well aware of the new and renewable energy supply project promoted by the government. However, it was found that participation in the project was difficult mainly for economic and social reasons. In order to activate the participation of rural residents who can't participate in the renewable energy power generation project for economic and social reasons, it is necessary to develop and promote business models and support policies for power generation projects in which village communities participate. Changes in residents' acceptability due to resident education and operation for solar power systems were analyzed. As a result of the survey, it was found that the satisfaction of rural residents was high when new and renewable energy power generation projects were introduced in rural areas. Therefore, it is thought that the government's goal of increasing farm household income and expanding the supply of new and renewable energy in rural area can be successfully achieved by the improvement of resident acceptability and the increase of the participation rate. Lastly, this study presented a plan to improve the resident acceptability of the renewable energy system by using the rural solar project and survey results.

Real Option Analysis on Ship Investment Valuation

  • Kim, Chi-Yeol;Ryoo, Dong-Keun;Kim, Jae-Kwan
    • Journal of Navigation and Port Research
    • /
    • v.33 no.7
    • /
    • pp.469-476
    • /
    • 2009
  • Recent collapse of shipping market right after unprecedent surge clearly demonstrates that shipping industry is extremely risky. Due to the volatile movements of the freight rates, investors tend to ask higher rate of return; higher required return reduces the total net present value of the investment project. For several decades, the Discounted Cash Flow(DCF hereafter) analysis has been the most frequently used valuation technique. However, the main problem of the DCF analysis is its assumption that the discount rate would stay the same during the project life. In other words, it usually does not address the decisions that managers have after a project has been accepted. The purpose of this study is investigate a new valuation method of investment: the Real Option Analysis(ROA hereafter) on ship investment. By replacing the existing valuation methods with the new one, the research will present a new perspective on investment with uncertainty. While uncertainty increases risk of investment and consequently discounts the value of it in the traditional feasibility analysis, in the ROA, a new valuation method which will be addressed in the research, uncertainty means some additional value of flexibility so that the tool can help investors produce more accurate decisions. Contrary to the DCF analysis, the ROA takes managerial flexibilities into account. In reality, capital budgeting and project management is typically dynamic, rather than static in nature. The ROA finds and assesses the values of managerial flexibilities or real options in the investments. The main structures of the research will be as follows: (1) overview of the ship investment project, (2) evaluation of the project by the Net Present Value analysis, (3) evaluation of the same project by the Real Option Analysis, (4) comparision of the two techniques.

A Study on Improvement of the Assessment Criteria for New and Renewable Energy Facilities in the G-SEED (G-SEED의 신·재생에너지시설 평가기준 개선 연구)

  • Kim, Wan-Young;Tae, Choon-Seob;Shin, U-Cheol;Yu, Chang-Kyun
    • Journal of the Korean Solar Energy Society
    • /
    • v.35 no.6
    • /
    • pp.43-50
    • /
    • 2015
  • The G-SEED encourages the installation of new and renewable energy facilities through assessments of the new and renewable energy installation rates. The government also regulates the installation rate of new and renewable energy facilities in the 'Project on new and renewable energy obligation in public installations'. The current criteria concerning the new and renewable energy facilities in the G-SEED are the result of an amendment made in July 2010. As over five years have passed since this amendment, the assessment criteria needs to be reenforced. To improve the current criteria, the calculation results of the installation rate of new and renewable energy facilities in the G-SEED were analyzed and compared to the corresponding calculation results of the 'Project on new and renewable energy obligation in public installations'. And an improved draft for the assessment criteria of the new and renewable energy facilities in the G-SEED was proposed.

Organizational Design for New Product Architecture Development: Comparative Analysis of Sharp and Casio on PDA Development (신규 제품아키텍처 개발을 위한 기업조직의 설계: PDA 개발에 있어 샤프와 카시오의 개발조직 비교 분석)

  • Wi John-H.
    • Journal of Technology Innovation
    • /
    • v.14 no.1
    • /
    • pp.1-30
    • /
    • 2006
  • The purpose of this paper is to analyze the organizational design and management of product development in creating new product architecture by an established firm. For the purpose, the paper put up the organizational design in the process of PDA(Personal Digital Assistant) development of Sharp and Casio which were Japanese major PDA firms in 1990s. PDA is the product born through architectural change from Electronic Organizer. Prior research on the product architecture change and organizational adaptation emphasized that an established firm is difficult to adapt to new product architecture due to the restriction of prior technology or organizational inertia. For overcoming these problems and successful development of new product architecture, organizational design and management in the process of product development becomes essential. In case of Sharp, corporate development project team had been used to overcome the restrictions from architectural knowledge accumulated through previous product. After launching first new PDA by corporate development project team, Sharp created a new division and pushed an evolution of PDA, when new PDA market start to grow up rapidly toward a major market segmentation. As a result, Sharp was able to build up stable PDA project trajectory. However, Casio was late for three years in launching of new PDA architecture because previous division charging of Electronic Organizer tried to develop first new PDA. Casio's PDA development was prohibited by engineers of previous division because new PDA architecture was inferior on user interface and display definition. That is, Casio's first PDA development was restricted by architectural knowledge of previous product.

  • PDF

Diagnosis of the Policy Tasks for the Execution of an Urban Regeneration Project Plan in Gangwon-do (강원도 도시재생사업계획 수립을 위한 정책 과제 진단)

  • Ham, Kwang-Min
    • Journal of Environmental Science International
    • /
    • v.30 no.5
    • /
    • pp.391-397
    • /
    • 2021
  • This study aims to establish the measures required for strengthening the internal stability of and executing the systematic plan for Gangwon-do in relation to the "urban regeneration preliminary project" launched by the Ministry of Land, Infrastructure, and Transport. The results of this study are as follows. The unit project carried out via the Gangwon-do urban regeneration preliminary project presented the tendency for the standardization of the H/W and S/W projects such as the establishment of the community anchor space and the resident competency reinforcement project. Further, rather than focusing on the contents that could objectively measure the effects of the project, it concentrated more on the performance indicators that are required for verifying the execution of unit projects like the establishment of buildings and operating programs. It was found to be insufficient with regard to the practicality of the project, the correlation with the New Deal Project, and the validity of the project contents. To improve these aspects, Gangwon-do would be required to highlight its distinguishability from the other regions and increase its practicality by operating the field-centered urban regeneration educational program, inducing the participation of experts in each of the areas in case there is a need to execute a project plan and discover a project with placeness. It also needs to focus on strengthening its connection with the urban regeneration new deal project by discovering the resident leaders and professional manpower, and establishing the performance indicators needed for systematically monitoring the regional changes in accordance to the urban regeneration preliminary project.

Managing Mega-Project Complexity in Five Dimensions

  • Gransberg, Douglas D.;Jeong, H. David
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.6-9
    • /
    • 2015
  • Traditional project management theory is based on a three-dimensional life cycle approach where the project managerseeks to optimize the dimensions of cost-schedule-technical (quality or design). This paper reports the findings of a case study analysis of two complex mega-projects in Michigan which confirm the findings of previous research and illustrates the use of a framework for five-dimensional project management (5DPM) that is for conceptualizing a complex project's scope of work. The framework elevates the recognition that the project's social/political context and the financial arrangements create complexity adding two new dimensions. This paper also demonstrates a methodology to graphically display a project's complexity to better understand and prioritize the available resources. The result is a "complexity footprint" that may help a complex project manager identify the boundary between controllable and uncontrollable projects impacts. The paper finds that applying 5DPM to the two case study projects has given the project delivery team a tool which is actually adding value to the complex project management process.

  • PDF

Effects on the Housing Market by Supplying "New Stay" Apartments: Focused on the Two Areas, Michuhol-Gu, Incheon and Gwonseon-Gu, Suwon (뉴스테이 공급에 따른 주택시장 반응과 효과: 인천 미추홀구와 수원 권선구 지역에 관한 연구)

  • Koh, Young Chon;Shin, Jong Hwa
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.5
    • /
    • pp.433-442
    • /
    • 2021
  • This study analyzed the housing market before and after the New Stay movement which was introduced in 2015. In this study, the territories having a New Stay Project and non-involved territories were analyzed based on the apartment price changes according to supply for 12 months before and after the movement date. This study used the difference-in-differences statistical technique. A comparison was carried out in Michuhol-gu, Incheon between Dowha-dong where a New Stay Project was executed, and Sungeui-dong where no project was executed, based on the movement date. It was seen that the price level in the former territory was higher than the latter demonstrating that the introduction of the New Stay Project in Dowha-dong lowered the apartment prices nearby (Sungeui-dong). A comparison in Gwonseon-gu, Suwon between Omogcheon-dong where a New Stay Project was executed and Gosaek-dong where there was no such project, based on the movement date showed that the introduction of the New Stay Project in Omogcheon-dong seemed to lower or stabilize the apartment prices nearby (Gosaek-dong). These results imply that the apartment prices in nearby areas can be stabilized if the supply volume of company-type rental houses is increased.

신규제품 아키텍처 개발을 위한 기업조직의 설계 -PDA 개발에 있어 샤프와 카시오의 개발조직 비교 분석-

  • Wi, Jeong-Hyeon
    • Proceedings of the Technology Innovation Conference
    • /
    • 2005.06a
    • /
    • pp.44-68
    • /
    • 2005
  • The purpose of this paper is to analyze the organizational design and management of product development in creating new product architecture by an established firm. For the purpose, the paper put up the organizational design in the process of PDA(Personal Digital Assistant) development of Sharp and Casio which were Japanese major PDA firms in 1990s. PDA is the product born through architectural change from Electronic Organizer. Prior research on the product architecture change and organizational adaptation emphasized that an established firm is difficult to adapt to new product architecture due to the restriction of prior technology or organizational inertia. For overcoming these problems and successful development of new product architecture, organizational design and management in the process of product development becomes essential. In case of Sharp, corporate development project team had been used to overcome the restrictions from architectural knowledge accumulated through previous product. After launching first new PDA by corporate development project team, Sharp created a new division and pushed an evolution of PDA, when new PDA market start to grow up rapidly toward a major market segmentation. As a result, Sharp was able to build up stable PDA project trajectory. However, Casio was late for three years in launching of new PDA architecture because previous division charging of Electronic Organizer tried to develop first new PDA. Casio's PDA development was prohibited by engineers of previous division because new PDA architecture was inferior on user interface and display definition. That is, Casio's first PDA development was restricted by architectural knowledge of previous product.

  • PDF

Project Delivery Systems and Project Performance;An Evaluation Model for Public Construction Projects (공공건설사업의 발주방식 선정 및 성과평가 모델)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.41-47
    • /
    • 2007
  • The selection of the reasonable project delivery system (PDS) is crucial for a successful performance of a project, which means to achieve project objectives. Furthermore, the project performance has been tightly related to the selection of PDS appropriate to pertinent project characteristics. In this context, the ministry of finance and economy of Korea launched two new project delivery systems called "Best Value Contract (Design-Bid-Build)" and "Bridging Contract (Design-Build)" in October of 2007 by revising enforcement ordinances of "Act on Contracts to Which the State is a Party". For efficient operation of the new project delivery systems, this paper suggested a PDS selection model which supports decision making of the reasonable PDS for a pertinent project by assessing characteristics of the public construction projects, both quantitatively and qualitatively. In addition, a PDS performance evaluation model was proposed in order to get feedback on the result of the PDS selection and the operation for the succeeding project. The standard models suggested in this paper might be used as a tool to support the decision making of the public organizations.

  • PDF

An Analysis on the Project of Creating a Village by Utilizing Assets in a Rural Area - Focused on the Project for a New Cultural Space Creation- (농촌지역 유.무형 자산을 활용한 마을 가꾸기 사업의 추진현황 분석 - 신문화공간조성사업을 중심으로-)

  • Jeon, Yeong-Mi
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2011.04a
    • /
    • pp.197-202
    • /
    • 2011
  • The purpose of this study was to investigate the current situation of physical and intangible assets, and to analyze the use of planning in a new cultural space creation project areas. For this study, literature survey, filed survey and participant observation methods were used for data collection. The results were as follows. 1) The project's characteristics had a variety of space utilization's scope. It was to emphasize the organizations and participants in the human side. 2) There are the pumping stations, mokgammak, mills, barbershops, marketplaces etc in physical assets, and it was worth the historic or agricultural facility. 3) The using plans of three kinds in hardware facilities, software programs, human ware(human abilities)are linked to each other organically. 4) The problems in the project's process include the administrative and institutional factors rather than planning matters.

  • PDF