• Title/Summary/Keyword: New Project

Search Result 3,237, Processing Time 0.033 seconds

VISUALIZATION OF HIGHWAY PROJECT BIDS USING TREEMAPS

  • Min Peng;William J. O'Brien;James T. O'Connor
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1036-1041
    • /
    • 2005
  • Treemaps, a space filling visualization technique, displays a massive data set of hierarchical data interactively on a single computer screen by mapping it to a matrix of rectangles. It allows users to visually inspect and manipulate data to find new relationships or discrepancies that are to difficult to find using traditional techniques. This paper applies treemaps to the evaluation of highway project bids, which contain hundreds or thousands of elements arranged in a hierarchical structure. Through a case study, treemaps are shown to be a potentially effective tool for bid evaluation by both contractors and State or Federal highway officials.

  • PDF

CONSTRUCTION COST INDEX FOR APPLYING INDEX ADJUSTMENT RATE IN THE ROAD PROJECT

  • Jin-Young Chun;Sungkwon Woo
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1112-1117
    • /
    • 2005
  • Construction cost index is generally used to estimate the new project cost based on past construction data and to adjust contract cost when the price change of various articles and items of expenditure composing the contract occurs. In Korea, it is mostly used for adjustment of construction contract cost due to fluctuation of prices. However index adjustment rate which is used for adjustment of construction contract cost had some problems in calculating cost index of each expenditure item that could not reflect properly the change of construction cost. For supplementing these problems, the research of developing construction cost index has been executed. Through the precedent research, these problems were partially resolved but still remain. Therefore this research proposes method of making cost index that utilizes representative items of labor, material, and equipment by analyzing bill of quantity of road construction, through analysis and comparison of precedent study. By using this method, it is expected to solve problems which were not reflected in precedent studies.

  • PDF

Case study on the Chinese polluted river and lake restoration under the sponge city construction

  • Liu, Jian;Yuan, Zhan;Liu, Yan;Wu, Lingyi
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.353-361
    • /
    • 2017
  • In order to improve the urban ecological environment, the central government has developed a series of water pollution control policies and measures since April 2015, and required local governments to complete the work of the polluted river and lake restoration within specified period. Moreover, the polluted river and lake restoration has been selected as a key evaluation indicator of achievements of the sponge city construction implemented since April 2015. This paper describes how to apply the sponge city construction technology to rehabilitate the polluted rivers and lakes through the polluted water treatment project in Xinghan New Area, Hanzhong and the polluted Huaguping River restoration project in Pingshan District, Shenzhen. The experience and lessons of the polluted river and lake restoration are summed up. Some measures to solve existing problems are put forward.

  • PDF

ACTION LEARNING TEACHING-LEARNING STRATEGY IN ARCHITECTURAL ENGINEERING DESIGN CLASSES

  • Myunghoun Jang;Hee-Bok Choi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.525-530
    • /
    • 2013
  • The importance of engineering design increases due to the expansion of engineering education certification. But there are not much teaching methods and examples of engineering design to be referred to the college classes. This paper introduces a new teaching and learning method of Action Learning adopted to a engineering design class in the Department of Architectural Engineering, J University in Korea. The class included a team project to find problems of facilities or safety management factors in a building construction site, and to provide the alternatives to solve the problems. The Action Learning helped to improve the learning effect of students and to increase the quality of the project deliverables.

  • PDF

AN EXAMPLE OF REPRESENTING THREE LEVEL'S SCHEDULES WITHIN SCHEDULE HIERARCHY BY BDM TECHNIQUE

  • Seon-Gyoo Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.445-452
    • /
    • 2011
  • The schedule hierarchy in construction project is generally composed of three levels. The highest level is a milestone schedule and represented by Bar Chart format. The middle level is an integrated project schedule (IPS) and represented by CPM (Critical Path Method) format. The lowest level is a detail working schedule and usually represented by Bar Chart. The traditional scheduling techniques such as ADM (Arrow Diagramming Method) or PDM (Precedence Diagramming Method) cannot represent all kinds of schedule within schedule hierarchy as identical schedule format. However, the BDM (Beeline Diagramming Method) technique can represent all kinds of schedule within schedule hierarchy as identical CPM format. This paper describes the basic concept, principle, interpretation methods, and schedule computation methods of the BDM as a new networking technique that can represent all kinds of overlapping relationships between activities, and then presents an example of representing three level's schedules within schedule hierarchy by the BDM technique.

  • PDF

RNA Metabolism in T Lymphocytes

  • Jin Ouk Choi;Jeong Hyeon Ham;Soo Seok Hwang
    • IMMUNE NETWORK
    • /
    • v.22 no.5
    • /
    • pp.39.1-39.18
    • /
    • 2022
  • RNA metabolism plays a central role in regulating of T cell-mediated immunity. RNA processing, modifications, and regulations of RNA decay influence the tight and rapid regulation of gene expression during T cell phase transition. Thymic selection, quiescence maintenance, activation, differentiation, and effector functions of T cells are dependent on selective RNA modulations. Recent technical improvements have unveiled the complex crosstalk between RNAs and T cells. Moreover, resting T cells contain large amounts of untranslated mRNAs, implying that the regulation of RNA metabolism might be a key step in controlling gene expression. Considering the immunological significance of T cells for disease treatment, an understanding of RNA metabolism in T cells could provide new directions in harnessing T cells for therapeutic implications.

Emergence of New Business Mode in the Chinese Water Market - Hefei Wangxiaoying Wastewater TOT Project -

  • Lee, Seung-Ho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.20-20
    • /
    • 2011
  • The purpose of this research aims to evaluate the emergence of new business mode in the Chinese water market since the mid-2000s - Transfer-Operate-Transfer(TOT) Projects. The study pays special attention to the case of the Hefei Wangxiaoying Wastewater Treatment TOT Project, which was awarded to the consortium of Berlin Water International and its Chinese partner in late 2004. The consortium secured an exclusive operating right for 23 years on the basis of a TOT scheme and would take responsibility of all the profits and losses in the operation of the plant. The total investment for the transfer amounted to RMB 491 million(US$70 million). The price was more than 288% of the original value, RMB 170 million (US$24 million). The project can be regarded as a successful case because of the following three causes. First, the Hefei government followed a series of standardized procedures in the international bidding, which ignited best-performed international players' competition for the project. Second, the project will bring in cutting-edge operation skills and management know-how. Third, the government succeeded in raising public asset values, and thanks to this, the government is able to consider other similar projects not only in the water sector but also other sectors in public utility services. Nevertheless, Berlin Water's point of view, there are several challenges. First, the company took a risk to pay such a large amount of cash to the Hefei government. Although such premium can be recouped in the operation period of 23 years, whether or not the company would be able to recover the initial investment and realize profits is in question due to an uncertainty of socio-political circumstances in China. Second, Berlin Water should expect a steep rise of water tariffs over the contract period in order to get the investment back. Water pricing is still a sensible matter to Chinese authorities, and therefore, it is uncertain if such rise of water tariffs would be possible. Third, the TOT mode leads to creation of a large amount of cash to government officials, which might have caused corruption between those who are involved in TOT deals. Then, the final contract fee would soar, which often results in the burden of normal customers. As discussed, the TOT mode has drawn much attention of foreign investors as a new alternative to enter into the Chinese water market. But it is important to note that foreign investors should be aware of possible risks in water TOT projects, which reflects some features of the Chinese political economy landscape and social norms. The Hefei case indicates that benefits can overshadow risks in TOT projects, which will continue to attract foreign investors that are dedicated to establishing their strongholds in the Chinese water market.

  • PDF

An Exploratory Study on the Project Performance by PMO Capability (PMO 역량에 따른 프로젝트 성과에 관한 연구)

  • Bae, Jae-Kwon;Kim, Jin-Hwa;Kim, Sang-Yeoul
    • Asia pacific journal of information systems
    • /
    • v.18 no.1
    • /
    • pp.53-77
    • /
    • 2008
  • In recent years, although numbers of corporations are bringing in PMO, they seem to be indifferent to PMO performance measurement. This demonstrates that there are also other reasons beside performance measurement of information systems (IS) project being ambiguous by introducing PMO; the lack of acknowledging the concrete function of PMO, and the scarcity of empirical study about the effect of PMO on the project members and project performance. In this sense, this study is aimed at proposing a new research model in which project success factors (i.e., standardization, management advocacy, and staff expertise) affect PMO capability (i.e., knowledge management, resources management, and problem solving competency) positively, leading to project performance (i.e., task outcomes, psychological outcomes, and organizational outcomes) eventually. To empirically test the research model, data are surveyed from PMO department and IS department. To prove the validity of the proposed research model, PLS analysis is applied with valid 132 questionnaires. By employing PLS technique, the measurement reliability and validity of research variables are tested and the path analysis is conducted to do the hypothesis testing. The path analysis results can be organized into 7 ways in large scale. First, standardization of project success factors has a positive association with knowledge management, resources management, and problem solving competency of PMO capabilities. The findings of this result indicate that the multiple or single project management should satisfy standardization in order to operate an effective PMO. Second, management advocacy of project success factors has a positive association with knowledge management, resources management, and problem solving competency. Management advocacy refers to the willingness of management to provide the required resources and authority for project success. There is agreement among researchers regarding the importance of management advocacy for favorable PMO capability. Third, staff expertise of project success factors has a positive association with knowledge management, resources management, and problem solving competency. The findings of this result indicate that the formation of an exceptional consultant or members with a proficient knowledge for staff expertise of project member is the key factor to elevate the PMO capability. Past research suggests that experience and knowledge and the resultant familiarity with the problem faced can be an important determinant of PMO capability. A capable project with appropriate staff expertise means that it enjoys a diversity of abilities and experiences. Fourth, knowledge management competency of PMO capabilities has a positive impact on psychological outcomes but has no direct effect on task outcomes and organizational outcomes. In domestic case of S. Korea, PMO was finally introduced to many other corporations in 2005 though it started bringing in 2000. Therefore, it had neither a significant impact on the task outcomes nor organizational outcomes by lacking the contents and the infrastructure of the knowledge management because the knowledge consolidation and management period of PMO is comparatively shorter by terms than other foreign nations. Fifth, resources management competency of PMO capabilities has a positive association with task outcomes, psychological outcomes, and organizational outcomes. In addition, problem solving competency of PMO capabilities has a positive association with task outcomes, psychological outcomes, and organizational outcomes. Therefore, the findings of this results stress that PMO capabilities has a positive impact on project performance. Sixth, according to the path analysis of the hypothesis, which suggested in this research, problem solving competency is the PMO capability which is the key success factor for task, psychological, and organizational outcomes as an integrated performance model. Further, the analysis reveals that problem solving competency is an important factor for integrated performance model. The finding is in line with past IS research, which affirms that the work of IS projects is essentially a problem solving endeavor. Seventh, in the path analysis of the hypothesis in this research, the path of the management advocacy $\rightarrow$ problem solving competency $\rightarrow$ organizational outcomes appears to be the most important and strongest path. In brief, the finding of this study suggests that project success factors influence PMO capability positively, and project performance as well. From the results, it can be concluded that PMO helped great improve the project success rate and project performance. This study advances research on PMO capability in three important aspects. First, the findings of our study have implications for IS theory and future research. Our study contributes to IS theory by synthesizing concepts from PMO research and project management research with those in IS research. We proposed and tested PMO capability of IS projects and the findings of our investigation provided some preliminary answers to some of the questions raised. Secondly, this thesis does not only help depicting the concept of IT governance but also approaches empirically. It makes a gradual approach to the main content, step by step, in contrary of simple standard, scholastic way of thinking. Finally, we argued that this task-oriented(technical) view is not sufficient to adequately conceptualize IS project performance. Hence, we applied that the research on organization teams, which provides a flip viewpoint to that of project management research in that it gives more weight for psychological outcomes of organizational work groups, can be very helpful in reconceptualizing the IS project performance construct. The limitations of this study are also discussed to provide research directions for future research.

Improving the Reliability of the National Database for Chemical Hazard Information (국가 화학물질 유해성정보 데이터베이스 구축 과정의 신뢰도 제고 방안에 관한 연구)

  • Lee, Somin;Lee, Minhyeok;Kang, Mijin;Kwon, Soon-Kwang;Ra, Jin-Sung;Park, Beaksoo
    • Journal of Environmental Health Sciences
    • /
    • v.46 no.4
    • /
    • pp.410-422
    • /
    • 2020
  • Objectives: According to the Act on Registration, Evaluation, Etc. of Chemicals, new and existing chemicals must be registered by 2030. In addition, industries need to submit hazard data as an attachment during the registration process. Therefore, we constructed a nationwide chemical database to support small industry by providing hazard data and original sources. During the process, we developed a new standard procedure for minimizing errors and increasing reliability. Methods: We analyzed the categories of errors and the cause of the errors through the verification results of the 2019 project. We present an improved database construction methodology and system. Results: Errors are categorized according to their causative factors into simple, technical, and structural type errors. Simple errors arise simply because of decreased concentration or negligence in following the instructions. Technical errors are caused by a discrepancy between the professional field and the type of data. Structural errors indicate systemic errors such as incomplete forms on the excel database or ambiguity in the guidelines. Lessons from the errors collected in the 2019 project are used to update the procedures for database authorization and technical guidelines. The main update points are as follows; 'supplementation of review process', 'giving regular training to external reviewers', 'giving additional information to authors, like physico-chemical properties of substances, degradability, etc.', 'amendment of excel form', and 'guideline upgrades'. Conclusions: We conducted this study with the aim of improving the accuracy and reliability of the database of hazard information for chemical substances. The new procedures and guidelines are now being used in the 2020 project for construction of a hazard information database for Korea.

Development and Application of the GIS-based Global Cadastral Non-coincidence Surveying Method for the Cadastral Re-survey (지적재조사를 위한 GIS 기반의 광역 지적불부합지 조사 기법의 개발과 적용)

  • Hong Sung Eon;Yi Seong Kyu;Park Soohong
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.23 no.1
    • /
    • pp.19-30
    • /
    • 2005
  • Korean government has constructed a nationwide cadastral map database through the cadastral map computerization project and also produced a variety of spatial data through the NGIS (National Geographic Information Systems) project. Under this circumstance, it is needed to set up the new automatic methodology that effectively solve cadastral non-coincidence problems by using various digital map data instead of expensive field survey methods. This study proposed a new automatic methodology for cadastral non-coincidence surveying and developed a prototype system as a proof of concept. Validation of this proposed method was done with some test areas. Results showed that this methodology could easily detect and assess both regional non-coincidence levels and cadastral map quadrangle non-coincidence levels. We expect that this new methodology can provide many benefits in planning and determining work priority of the forthcoming nationwide cadastral re-surveying project.