• Title/Summary/Keyword: New Project

Search Result 3,237, Processing Time 0.034 seconds

An Investigation of the Comparative Rate of Return

  • Park, Young-Hyun
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.11 no.1
    • /
    • pp.12-23
    • /
    • 1986
  • The minimum attractive rate of return (MARR) has been used for many years as a decision criterion in engineering economic analysis. Typically, inflation has been either ignored in such studies or considered by adjusting each of the individual cash flows associated with a project for inflation, frequently a lengthy process. This research investigates a new decision criterion for economic analysis, the comparative rate of return (CRR). The CRR is defined to be the minimum rate of return earned on uninflated cash flows of proposed expenditures is simplified, since the analysis can be performed on the uninflated cash flows. The research presents a derivation of the CRR and investigates its relationships to the MARR, inflation rate project cash flows and project life.

  • PDF

Master Plan for Long-term Transmission System in Myanmar (미얀마 장기 계통계획 수립 결과 및 전망)

  • Hur, Y.;Kim, J.H.;Han, K.N.;Choi, Y.S.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.9-11
    • /
    • 2005
  • kEPCO is now conducting a project called the "Feasibility Study & Basic Designs for the 500kV Transmission System in Myanmar" as its second overseas project following the "Development Study on the rover System Network Analysis in Myanmar" performed from 2001 to 2002. As a part of this project, this paper deals with the analysis process and results of the demand forecasts, master plan for transmission system expansion, and the major factors for the new 500kV transmission facilities.

  • PDF

An Effort Estimation Model for Software Maintenance Project (소프트웨어유지보수 프로젝트의 투입인력 규모예측 모형)

  • 안연식
    • Journal of the Korea Society of Computer and Information
    • /
    • v.4 no.2
    • /
    • pp.61-69
    • /
    • 1999
  • In this study, the productivity factors of software maintenance are categorized into the three areas such as maintainer characteristics, software technical characteristics and maintenance environment characteristics. And the various regression analyses are performed for searching the most significant model by using actual project's data. At conclusion, an linear model including new variables derived from factor analysis to estimate the effort for software maintenance project is suggested.

  • PDF

Study on the ENC Sea Trial Plan (전자해도 실선시험에 관한 연구)

  • 서상현;이희용
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1998.10a
    • /
    • pp.85-95
    • /
    • 1998
  • ECDIS, highlihgted as a new technology for the navigation safety, could replace the paper charts in the bridge and make the more safe navigation possible. For the marines to use the ECDIS, the infrastructrue of the ENC production and distribution, the development of IMO compliant ECDIS, the training program for the ECDIS usage and related matters are thought as the key points to be solved. Also it is necessary for the ECDIS usage and related maters are thought as the key point to be solved. Also it is necessary for the related groups, such as ECDIS manufactures, users, ENC producers, the to be involved in developing the national infrastructure altogether to promote the ECDIS usage. Upon these background, the Korean ENC pilot project was introduced and the comparison study of the SHARED project coordinated by MPA(Maritime Port Authority, Singapore) and the Canadan Pilot project has been done. With such a analysis, the Korean ENC sea trial test plan is presented.

  • PDF

공장공학(工場工學)(P. E)에서의 종합적(綜合的) 품질관리(品質管理) T. Q. C. in Plant-Engineering

  • Yun, Seok-Ho
    • Journal of Korean Society for Quality Management
    • /
    • v.8 no.2
    • /
    • pp.29-37
    • /
    • 1980
  • The purpose of this study is to define the role of a T. Q. C. engineer in the plant engineering activities. A "plant engineering" moves to complete a new project through a series of stages such as: 1. Research & Development stage. 2. Economic evaluation & engineering design stage. 3. Erection & start up stage. 4. Final production & control stage. This suggests that the plant engineering project should be carried out with a wide variety of tasks, as well as a central control. For a successful completion of the project, a T. Q. C. engineer is required, in practice, either as a central activity creator or as a key advisor in each task.

  • PDF

Consolidation and Design of Naturally Favorable Irrigation Canals (용수로의 자연친화적 정비 및 설계)

  • Kim, Sun-Joo;Yang, Yong-Seok;An, Min-Woo
    • Journal of Korean Society of Rural Planning
    • /
    • v.8 no.2 s.16
    • /
    • pp.50-56
    • /
    • 2002
  • In 1980s, studies on the river environment and the management techniques to maintain the quality of water achieved actively. From the beginning of 1990s, the concept considering the river ecology and conservation in urban area have been introduced in Korea. Recently, some environment friendly projects on the rivers have been executed and some are under way. Many small rivers in rural areas have been maintained considering landscape and partly ecology. However until the pilot project named Songsam drainage channel project started in 1998, there were no studies and projects on the irrigation and drainage channels considering environment friendly maintenance. Korea Agricultural and Rural Infrastructure Corporation (KARICO) is going to introduce environment friendly and naturally favorable maintenance technique when the new projects to reform the irrigation and drainage channels are planned. Irrigation channel in O-dong project site in Yeomsan-myeon, Younggwang-gun was designed considering environment friendly consolidation and maintenance.

부품개발의 상태진단규칙의 도출

  • 김점복;권철신;조근태
    • Proceedings of the Technology Innovation Conference
    • /
    • 2000.06a
    • /
    • pp.65-83
    • /
    • 2000
  • In this study, we propose an expert system aided model necessary for extracting the rules, which can diagnose the success level of new product development project. For this purpose, first, we design a classification model to analyze the characteristics of $\ulcorner$parts development projects$\lrcorner$. Second, in order to select success factors, we explore literatures and interview with project managers working at large sized companies of electronic parts. And we conduct the enquete survey and statistical analysis to extract key success factors. Third, in order to decide the level of project success, we use the concept of 'Recearchitivity' as a framework of judgement criteria. Fourth, in order to extract diagnosis rules, we use expert system development tool.

  • PDF

The Comparison of BOLERO project and TradeCard syetem as Settlement Method in International Trade (국제전자상거래시대(國際電子商去來時代)를 대비(對備)한 BOLERO Project와 TradeCard System)

  • Ahn, Byung-Soo
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.13
    • /
    • pp.933-977
    • /
    • 2000
  • BOLERO project and TradeCard System are attracted public attention as new settlement method that is able to substitute for documentary letter of credit. BOLERO is the business processes and methods, together with the digital information system, which are provided by Bolero International for communicating Messages and Documents and facilitating business transactions. TradeCard aim to make international business-to-business e-Commerce easy, fast, inexpensive and secure while innovating current documentary compliance and financial settlement mechanisms. The main purpose of this paper is to search the possibility of paperless trade. Since, this paper examine the international legal feasibility of these systems and compare the strength and weakness.

  • PDF

Rapid System Design/Validation Method through Scenario Based Role Playing Game -for Package Based System Implementation- (시나리오 역학 게임을 통한 신속 시스템 설계/검증방법 -패키지 응용시스템을 대상으로-)

  • 예동경;이용재;강두호;최열현
    • CDE review
    • /
    • v.4 no.2
    • /
    • pp.30-35
    • /
    • 1998
  • Recently, many enterprises wish to preoccupy competitive positions in the market by motivating themselves towards CALS(Commerce At Light Speed) and try hard to achieve system implementation with the use of new concept-based backbone systems such as ERP(Enterprise Resource Planning) or PDM(Product Data Management). However, unfortunately there is an inevitable discrepancy during implementation period between package vendors and customers due to lack of clear methodology and misunderstanding about system. In some cases, consensus on partially verified system design invokes customers'continuous change demands and often it tends to result in unnecessary project delays. PDM application system implementation project of the company L has been studied here to solve these sorts of problems. The major yields of this work are achievement of a willing approval from customers and rapid system design under a time-limited and conceptually defined project scope and finally, through fully verified system design, we were able to reach successful system implementation.

  • PDF

Improvement of the System in Railroad Station-areas Development (철도역세권개발(鐵道驛勢圈開發) 제도(制度)의 문제점(問題點)과 개선방안(改善方案))

  • Park, Heung-Soon;Ju, Yong-Jun;Park, Hyeon-Ju
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1279-1307
    • /
    • 2009
  • The development of station districts is mainly categorized into 4 types. The first one is the composite development of the railroad station-areas. The second is the re-development of the direct station districts. The third is the rearrangement of the indirect station districts. And the fourth is the development of the new station districts for newly constructed railroad routes. Among these, this study aims to focus on the problems and methods of improvement in the development of the railroad station-areas, since there is not much problem with the implementation of the city development project, housing site development project or city rearrangement project for the direct or indirect station districts.

  • PDF