• Title/Summary/Keyword: New Project

Search Result 3,237, Processing Time 0.027 seconds

EVMS Application Process based on Project Management Processes (Project Management Process를 바탕으로 한 EVMS 실무적용 프로세스)

  • Baek Sung-Min;Ahn Byung-Ju;Kim Jae-Jun;Kong Gun-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.59-66
    • /
    • 2002
  • EVMS(Earned Value Management System) came to the proper method for integrated cost-schedule control and Government announced EVMS application plan. After that, many studies related adaptability, activation, model, and process reflecting the characteristics of the domestic construction industry are proceeded in construction sites and schools. This thesis is a study of EVMS process. The purpose of this paper is to analyze the problems of previous researches for EVMS Process and to suggest the EVMS application Process based on Project Management Processes of PMBOK. In this kind of view, this thesis suggests the new direction to study EVMS process. And furthermore, this process is suggested for showing a framework of EVMS in Korean construction project are identified.

Optimal Effort Allocation in Software Development Phase (소프트웨어 개발 단계별 최적의 노력 할당)

  • 박재흥;노명옥;하석운
    • Journal of the Korea Computer Industry Society
    • /
    • v.3 no.3
    • /
    • pp.295-306
    • /
    • 2002
  • Successful project planning relies on a good estimation of the effort required to complete a project, together with the schedule options that may be available. Despite the extensive research done developing new and better models, existing software effort estimation models are present only the total effort and instantaneous effort function for the software life-cycle. Also, Putnam presents constant effort rate in each phase. However, the size of total effort are variable according to the software projects under the influence of its size, complexity and operational environment. As a result, the allocated effort in each phase also differ from project to project. This paper suggests the criteria for effort allocation in planning, specifying, building, testing and implementing phase followed by the project total effort. These criteria are derived from 183 different projects. This result can be considered as a practical guideline in management of project schedule and effort allocation.

  • PDF

An Analysis on the Prospects and Realities of Local Governments' Project Promotions according to the Changes in Financial Policy of Agricultural Infrastructure Improvement Projects (농업기반정비사업의 재정정책변화에 따른 지방자치단체의 사업추진 전망 및 실태 분석)

  • Bae, Seung-Jong;Kim, Dae-Sik;Kim, Soo-Jin;Kim, Seong-Pil
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.61 no.5
    • /
    • pp.49-55
    • /
    • 2019
  • This study attempted to investigate the changes in the perception of local government officials about agricultural infrastructure improvement projects due to the financial policy changes. A total of 141 local government officials were surveyed on the priority, the current status of the agricultural infrastructure improvement projects. Irrigation facilities renovation project and Small drainage improvement project had generally high priority, while Support project of cultivation basis for upland crops in paddy, Large scale land readjustment project, and Upland infrastructure improvement project had low priorities. After the introduction of the block grant system, agricultural infrastructure improvement projects had often been conducted by collecting opinions from local residents. The officials in charge of local governments recognized that the agricultural infrastructure improvement projects were reduced due to lack of financial resources and project potential sites. In response to the changes in the agricultural infrastructure improvement projects, most of the surveys showed that the influence of cities and provinces was strengthened. In addition, respondents most needed to improve the subsidy rate and there were a large number of cases requiring differential support to meet the characteristics of the local government. Therefore, it will be necessary to present a new perspective on the agricultural infrastructure improvement projects and to suggest differentiated projects for each regions.

기계산업 경쟁력향상을 위한 신뢰성평가 추진 방향

  • 김형의
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2000.11a
    • /
    • pp.57-74
    • /
    • 2000
  • This paper examined current problem of reliability assessment project on mechanical components being domestically pursued, and from the point of new view suggested directions to a comprehensive reliability assurance added quality assurance, suitable to realities in our industries.

  • PDF