Evaluation of Management Performance for Heritage Buildings Case Study: Greco-Roman Museum - Alexandria, Egypt

  • Adel El-Menchawy;Wael Kamel;Amal Mamdouh;Mirna Eskander
    • Architectural research
    • /
    • v.25 no.3
    • /
    • pp.41-51
    • /
    • 2023
  • Building restoration is a complex process with a high level of uncertainty. Restoration professionals can significantly benefit from the well-established discipline of project management to achieve their targets; however, available evidence shows that the use of the project management body of knowledge in restoration projects is far from the desired level. Several historical organisations have since been established with the goal of preserving and governing cultural identity, and numerous studies have supported the need of preserving architectural heritage. Many owners, investors, academics, and developers believe that it would be considerably more expensive to renovate and restore an old building than to create a new one. Although the project management process is generally recognised, the concept of project management for architectural heritage projects differs due to the uniqueness of each project. It differs from many construction projects in terms of the need for research-based practices to define scope, planning, scheduling, supervision,decision-making,and also performance. The Greco-Roman Museum in Alexandria's planning, design, and building phases are being studied with the aim of identifying and analysing the variables that contribute to project delays. Three project management pillars were established as a result of gathering this data from the project's stakeholders: the first pillar addresses time management for the existing phase and how it will be incorporated into the new extension phase; the second pillar addresses performance in relation to project management issues in the delivery of the best quality of a construction project; and the third pillar addresses the scope of the new extension because it will significantly impact the other two pillars. This paper argues that a contemporary perspective which utilizes project management tools and techniques can contribute to the conservation of architectural heritage in line with the conservation principles.

Development of Work Breakdown Structure for Nuclear Power Plant (원자력발전소 Work Breakdown Structure 개발)

  • Cho, Yeong-Heock;Yang, Myung-Duck
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.52-53
    • /
    • 2014
  • The Work Breakdown Structure (WBS) is a primary tool which provides a framework that defines clear scope of all deliverables throughout the project life cycle. Once the WBS is established in projects, it should allow project team members to measure and manage work performances by the WBS; further, it should provide a reference point when any work scope needs to be redefined. Based on the project information in the Progress and Performance Measurement System (PPMS) of UAE's Barakha Nuclear Power Plant (BNPP) projects, an attempt was made to develop a new WBS which provides hierarchical and systematical decomposition of the total work scope of NPP construction projects while avoiding from the preexistence concept in Korean NPP projects that the WBS is a combination of Physical Breakdown Structure (PBS) and Functional Breakdown Structure (FBS). The unique features of the new WBS are as follows: (1) defined the definition of each level of the WBS, (2) subdivided the WBS into 5 hierarchical levels, and (3) adopted globally used general coding structure. The new WBS provides a basic hierarchical structure for the project scope and can be used as a basic tool for schedule control, performance measurement, project status monitoring, and communication among project participants. In addition, by putting the Work Package (WP) under the WBS, the Earned Value Management System (EVMS) per WP can be utilized for the project.

  • PDF

A Landscape Design Proposal for Eunpyeong New Town, Seoul (서울 은평 뉴타운 1지구 조경설계)

  • Kim Soon-Boon;Chin Yang-Gyo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.33 no.2 s.109
    • /
    • pp.111-121
    • /
    • 2005
  • The Seoul Housing Corporation pronounced an alternative design competition and a bidding for Eunpyeong New Town in December of 2004. At first many construction companies were interested in the first New Town Project. But at last a few companies had proposed the alternative design and construction cost. This project needed a conjunction of design ideas and technology know-hows. And the client wanted the brand power of construction company. Ultimately the Corporation hoped that the first New Town Project will end up with high quality successfully. This competition had started with the original construction drawings. Then it needed some alternative ideas and the lowest cost. There were two drawings of non changeable part and changeable part. Non changeable parts are structure like housing unit plan, underground parking lots. Changeable parts are outdoor layout, interior design and building facade. So we tried all ideas of landscape technology and design principles within limited guidelines. The author applied new technology like tilted rooftop greening and sustained container greening on high-rise apartment house. This green technology will be the first trial in Seoul and in the world as well. Daewoo Corporation have accumulated greening technology through the researches by national funding since 2002. Through this New Town Project the green technology will go forward step by step.

A Study on the Development Profit from the Redevelopment Area of New Town Project by Developing Agencies - In Case of the Gilreum Newtown 2, 4 District in Seoul - (뉴타운사업 내 재개발구역의 주체별 개발이익 비교 분석 - 길음 뉴타운 2, 4구역을 중심으로 -)

  • Kim, Ah-Leum;Koo, Ja-Hoon;Kim, Hyun-Jin
    • Journal of the Korean housing association
    • /
    • v.20 no.5
    • /
    • pp.103-112
    • /
    • 2009
  • This New-Town Project has been proposed to improve the environments of deprived residential areas. This paper investigates the distribution levels of the participating parties' monetary surpluses from New-Town Projects through a case study and tentatively suggests political issues and measures. The methodology followed includes a thorough survey of the precedent theories, including a literature review concerning issues and tasks that have been raised since the development was initiated. A general assessment of the complete project is also provided with a broad perspective of the background settings. Secondly, the case study of Gil-Eum will be the focus for identifying the mechanism for the project's profit distribution levels, then for constructing a set of measuring procedures according to the stages of the project and the participating parties. This set of procedures that has been drawn out from recognizing the system, is applied to the target project and measures the amount of profit gained from each stage of the development. This also aids in collating information about the procedural arguments concerning the financial gains of the operations that have been provided. This project falls under the 'Urban and Residential Environment Improvement Act', and based on the results of each stage, the measurement of the profits of the participating parties is analyzed.

Development of Project Management System for Geothermal Well Construction (지열발전 시추공 구축 프로젝트관리시스템 개발)

  • Kim, Kwang-Yeom;Lee, Seung-Soo
    • New & Renewable Energy
    • /
    • v.8 no.3
    • /
    • pp.38-46
    • /
    • 2012
  • Enhanced Geothermal System (EGS) among geothermal system types enables to produce sustainable energy even in non-volcanic region while conventional geothermal energy has been restricted to obtain only from hot and permeable formation such as in volcanic regions. Successful EGS project in terms of economy, however, can be expected only when the project is managed effectively considering most of influencing factors (e.g., tangible and intangible resources, cost, time, risks, etc.). In particular, well construction is of the utmost importance in geothermal project as it dominantly influences on time and cost in the whole project. Therefore, when it comes to viable geothermal project without abundant experience, managing drilling economically and efficiently is inevitable. In this study, a project management system for well construction in geothermal project based on project control system including work breakdown structure and cost account was developed to predict and assess the performance of drilling and to visualize the progress.

A study on the Analysis of Rural New Town Planning and Guidelines for Improvement Measures of Planning Process -The Case of Jang-seong Rural New Town and Hwa-soon Rural New Town in Chean Nam Provincial Area- (농촌 뉴타운 조성분석 및 개선 방안에 관한 연구 -전남 장성 뉴타운과 화순 뉴타운 계획을 중심으로-)

  • Oh, Byung-Tae;Choi, Chan-Hwan
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.13 no.3
    • /
    • pp.107-115
    • /
    • 2011
  • This study aims to extract improvement measures in rural new town planning by selecting two similar new towns; Jang-seong rural new town and Hwa-soon rural new town in terms of size of town and population. To carry out this study, field survey is implemented and research articles and papers are examined. Based on this study, four major issues are drawned as follows ; Firstly, the location of rural new town is the most important criteria for the new town project to be successful and sustainable village. Site of Jang-seong rural new town which is chosen arbitrarily by local county is located unsuitable area. Secondly, compulsory facilities are dismissed in land use planning because of guidelines of the rural new town are not applied. Thirdly, the size of community centers are too big for 200 households to manage, and it can be a financial burden to inhabitants. Fourthly, rural new town project is building urban districts in rural area rather than constructing rural village, so the method of rural new town planning should be reconsidered. The central government has to supervise the rural new town project throughly by put it in more systematic approach.

The Study on Characteristics and Improvement of Rural New Town Development Project (농어촌뉴타운조성사업의 특성 및 개선방안에 관한 연구)

  • Han, Seok-Jong;Joo, Seok-Joong
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.13 no.2
    • /
    • pp.39-46
    • /
    • 2011
  • The agricultural population, the farming, the agriculture of our country has been decreased more rapidly than those of other countries. Also, the changing speed of the rural village in Korea has shown a similar trend. By considering the urbanization process and migration state caused by the economic growth and the increasing level of relative poverty in comparison with the urban area, it has been necessary to go through the impoverishment and slum-orientation of the rural area. In our country, the rural village became old age. So, the collapse is predicted to a population shortage if such trend is continued in the village society. according to investigate, Many urban peoples have opinion that migrates to a farm village. but those not migrate to rural community. The mainly reason is low life environment. therefore it is need the plan that the urban people migrates to a rural village, and must have the plan to be engaged in the agriculture. lt was the rural-fishing New Town development project that started in 2009 for 30~40 years's urban people. This study is about characteristic and improvement of Rural-Fishing New Town development project.

Issues of New Technological Trends in Nuclear Power Plant (NPPs) for Standardized Breakdown Structure

  • Gebremichael, Dagem D.;Lee, Yunsub;Jung, Youngsoo
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.353-358
    • /
    • 2020
  • Recent efforts to develop a common standard for nuclear power plants (NPPs) with the aim of creating (1) a digital environment for a better understanding of NPPs life-cycle management aspect and (2) engineering data interoperability by using existing standards among different unspecified project participants (e.g., owners/operators, engineers, contractors, equipment suppliers) during plants' life cycle process (EPC, O&M, and decommissioning). In order to meet this goal, there is a need for formulating a standardized high-level physical breakdown structure (PBS) for NPPs project management office (PMO). However, high-level PBS must be comprehensive enough and able to represent the different types of plants and the new trends of technologies in the industry. This has triggered the need for addressing the issues of the recent operational NPPs and future technologies' ramification for evaluating the changes in the NPPs physical components in terms of structure, system, and component (SSC) configuration. In this context, this ongoing study examines the recent conventional NPPs and technological trends in the development of future NPPs facilities. New reactor models regarding the overlap of variant issues of nuclear technology were explored. Finally, issues on PBS for project management are explored by the examination of the configuration of NPPs primary system. The primary systems' configuration of different reactor models is assessed in order to clarify the need for analyzing the new trends in nuclear technology and to formulate a common high-level PBS. Findings and implications are discussed for further studies.

  • PDF

A Study on the Current Status and Improvement of BIM in the Government Owner Perspective - Focus on the KEPCO Na-Ju Head Office Project - (공공시설 발주자 관점에서의 BIM 적용 현황 및 개선방안 연구 - 한국전력공사 나주 신사옥 건립공사 사례를 중심으로 -)

  • Sim, Gu-Sik;Kim, Sung-Man;Ahn, Jae-Hong
    • Journal of KIBIM
    • /
    • v.3 no.2
    • /
    • pp.19-27
    • /
    • 2013
  • The application of the BIM for the KEPCO' new headquarters in Naju involved alternative approaches and accompanied many trials-and-errors as the project adopted new targets and purposes that were not used in Korea before. In particular, for a large BIM-based project, clearly defining the BIM-including the objective, scope and the outcome-is critical for a project owner. For a successful implementation, project owners should improve the utilization of the BIM. Against this background, this research examines the case of the BIM application for the KEPCO' new headquarters in Naju, identifies its effects and problems, and proposes how to improve application of the BIM for public projects. The improvement in the BIM application can be divided into several stages: project order, design development, construction, and post-construction maintenance. In the initial stage, it is important to fully discuss the project planning among participants, and clarify the goal, scope, expected outcomes and role of the BIM. In the design stage, the level of detail (LOD) for the 3D model should be defined in consideration of information use in the stages of estimation and construction. In the construction stage, the scope of project that is managed based on the processing and use of the BIM data should be clearly given and understood. After construction is complete, measures should be sought to use the BIM for maintenance, and corresponding requirements and outcomes should be provided. The analysis is expected to provide basic data for successful implementation of BIM-based public projects, by assisting project owners and involved parties in enhancing work in different stages of a project.

Development of a Framework for Estimating the Benefits of IT Projects : Focusing on Preliminary Feasibility Study (정보화 사업의 편익 추정 프레임워크 개발 : 정보화부문 예비타당성조사를 중심으로)

  • Lee, Chunghun
    • Journal of Information Technology Services
    • /
    • v.17 no.3
    • /
    • pp.101-115
    • /
    • 2018
  • In order to promote the IT business efficiently, the Preliminary Feasibility Study has been conducted since 2004. It is to verify the feasibility of a large-scale IT project in advance and to determine whether to reflect the budget. It is more difficult to analyze the benefits of the IT project than other projects, because the IT project is carried out by combining tangible and intangible assets and human resources. For this reason, the Standard Guideline for Preliminary Feasibility Study in the IT field suggests a framework to support in estimating the benefits of the IT project. However, it includes the following problems : 1) level discrepancy among the benefit categories, 2) lack of types of benefit items, 3) no consideration of benefit inducing factors. So the framework is facing a low utilization. This study develops a new framework through a three-step research process. The new framework can be used not only for preliminary feasibility studies but also for estimating the benefits of general IT projects.