Applied cases of advanced construction & engineering technology at Tower Palace III Project (타워팰리스 III 현장의 첨단 시공 및 엔지니어링 기술 적용사례)

  • Wang In-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.202-213
    • /
    • 2003
  • Tower Palace III project is the highest residential and commercial high-rise complex building in Korea. In order to construct a high-rise building, advanced construction and engineering technology is required. Therefore, with more developed construction and engineering technology based upon accumulated knowledge, construction speed of 13.4 days per floor including finish work was achieved in this project. To achieve this project successfully, three main advanced construction technology were applied: 1) Construction methods for 3-day cycle of structural work and curtain wall, 2) Tact scheduling method for finish work, 3) Management system of material, labor, work, and information. Also, four main engineering technology were applied: 1) New material such as high -flowing concrete and high strength concrete of 800 kgf/cm2, 2) New method such as a pipe-cooling system of a cool water circulating type, 3) Mechanical system such as smart-fan controlling kitchen-ventilation system, 4) Electrical system such as false car system.

  • PDF

Preliminary Feasibility Study for Commercial DME Plant Project (DME 상용화 플랜트 예비 타당성 조사)

  • Mo, Younggi;Kang, Minseo;Song, Taekyoung;Baek, Youngsoon;Cho, Wonjun
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.25 no.2
    • /
    • pp.173-182
    • /
    • 2014
  • Dimethyl ether (DME) is a new clean fuel as an environmentally-being energy resources. DME has similar characteristics to those of LPG and can be substituted Diesel fuel. KOGAS has investigated and developed new innovative DME synthesis process from synthesis gas with KOGAS's own technologies. KOGAS had finished the construction of 10ton/day DME demonstration plant in 2008, we have established the basic design of commercial plant which can produce 3,000ton/day DME. Specifically, an economic model for a commercial DME project will be presented. It accounts for all the major cost factors that are considered in a commercial scale project as the model input for performing cash flow analysis, after which key economic indicators are produced including the internal rate of return (IRR), net present value (NPV). Sensitivity analysis is performed to identify dominant cost factors to the project economics and quantify their impact. The inputs to the economic analysis will be based on representative cost factors from the commercial-scale design of KOGAS' direct DME process supplemented by literature data. Case study results will be presented based on recent commercialization projects.

Economical & Technological Ripple Effects in Acquiring New Weapon System : Focused on Ground·Sea·Air Weapon System (국방무기체계 연구개발 기반 경제적·기술적 파급효과 : 지상·해상·공중 무기체계를 중심으로)

  • Shin, Sang-Wook;Oh, Cheon-Kyun;Yim, Dong-Soon;Choi, Bong-Wan
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.4
    • /
    • pp.111-122
    • /
    • 2018
  • The private sector is currently reviewing the feasibility of the project or deciding economic policies by analyzing the economic ripple effects. However, the arms acquisition project focuses on the need for the national defense weapons system by analyzing the costs and the effectiveness of the analysis and reviewing the necessity and feasibility of the project. In order to analyze the economic ripple effects, KB (the Bank of Korea) prepares and publishes an analysis table of industrial associations in a given unit. IAAR (the industrial association analysis report) is difficult to apply directly to the defense weapons system. Therefore, research on the economic ripple effects applicable to the defense arms procurement project was needed. In this study, we propose the generic methodology for estimating economical and technical ripple effects resulted in acquiring new weapon systems. Based on the analysis of inter-industrial relations, economical ripple effects are estimated with production inducing effects, value-induced effects, employment-induced effects and export-induced effects. Also, the technological ripple effects are estimated with technological intensity represented by investment cost in research and development. To show the validity of proposed methodology, a case study of acquiring new weapon systems such as GR (guided rocket), destroyer, and helicopter is accomplished. From the case study, it is concluded that these economical & technological ripple effects can be used as a reference to decision making in the course of acquiring major future defense weapons systems.

A Study on the New RFP for the PMO-based Development of Next-Generation MIS (PMO 기반의 차세대 MIS개발을 위한 신RFP 작성 연구)

  • Han, Moonhee;Kim, Yousin;Kim, Dae Ho
    • Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
    • /
    • v.6 no.11
    • /
    • pp.585-594
    • /
    • 2016
  • Information system development projects are increasingly enlarging in size and are becoming more complex in the development environment. The traditional approaches for the development of information system, however, haven't shown the expected performances in the management for them and many researchers have been trying to find a new approach for overcoming this challenges. And one of the new approaches is the PMO and it is introduced to solve the problems of project management and the related organizational, technical, and administrative problems. This study attempted to find the efficient information system establishment plan. In particular, this study wants to research the practicality of PMO and the detailed utilization plans. As a result, this study proposes the structure of project implementation, the requirements, the direction of the basic system design, the scope of system development, and the budgeting for the systems. It is expected to contribute the successful implementation of the project.

Improving the Accuracy of Early Stage Cost Estimation in Apartment Construction Project (공동주택 프로젝트의 초기 공사비 예측정확도 향상에 관한 연구)

  • Lim, So-Yean;Yeo, Sang-Gu;Go, Seong-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.143-147
    • /
    • 2010
  • Due to the diversification and complication of construction projects, controlling risks from the early design-planning phase gives huge impact on success of the construction project. As a part of managing uncertainties it is also important to estimate the project cost several times. Especially, estimating project cost in the early stage gives effects on making a budget for projects. This study estimated the apartment project cost using case-based reasoning(CBR), which is the process of solving new problems based on the past problems. For this, we deduced the apartment cost influence factors which can be gathered in the early stage of project. Based on the factors we established the database for apartment project and calculated the attribute value, attribute similarity and case similarity. Although we retrieve the most similar case from the database, it is very hard to utilize it directly due to the uniqueness of each project. So, Genetic Algorithm(GA) was applied in revising the cost of the retrieved-case. Therefore, the accuracy of the prediction was improved by GA optimization.

  • PDF

A International Comparative Study on the Bidding System & Policy for the Public IT Project (공공 IT 프로젝트 수발주 제도와 정책의 국제간 비고)

  • Noh, Kyoo-Sung
    • Journal of Digital Convergence
    • /
    • v.6 no.1
    • /
    • pp.11-19
    • /
    • 2008
  • The Bidding System of the public IT project in Korea is fallen behind, because of the ordering habitual practice based old system, overcompetition based sealed bid and subcontract practice. To innovate this old-fashioned practice for public IT project bidding, this paper wants to generate a proper improvement direction of the public IT project contract law and the related policy through the literature review about the ordering and receiving system in Korea, the practical survey about bidding marketplace in Korea, and competition between bidding system and/or policy of major countries: USA, UK, France and Japan. As a result of practical survey, many problems of the current public IT project bidding system came out and improvement ideas toward future situation turned up. These outputs implicate that the current law and system related public IT project demands better improvement work for the future ubiquitous Korea. Therefore, this paper, to solve these problems about bidding systems and practice, propose the new public IT project contract law and the related policy, reflecting these improvement ideas by the practical survey and the literature review, and benchmarking points from bidding system of other countries.

  • PDF

A Study on Earned Value Management System (EVMS) For Project Using ERP System (ERP 시스템을 이용한 프로젝트 EVMS에 관한 연구)

  • Park, Je-Won;Lee, Chang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.4
    • /
    • pp.145-151
    • /
    • 2010
  • It seems that a primary concern of the project-based company, which provides a large scale product or service over long term period, is to run a successful project through systematic project process control and control costs. One of the typical project control methods is Earned Value Management System(EVMS) which analyses the precess through performance measurement. Even though the EVMS is a highly efficient tool in the managerial aspect, it cannot easily determine the Planned Value(PV), Actual Cost(AC), or Earned Value(EV) due to the indistinct criteria and extensive data. The accurate calculation of AC in particular, is the basic of project management, but most companies record direct personnel expenses or direct expenses only. Since they calculate indirect expenses based on the estimated ratio, it limits the systematic project management that reflects changes in profit and loss of a company. This study introduces a EVMS for project management and its actual case based on EVMS and ERP system which some additional modules are installed for performance measurement. It is expected that this new method enables a company to save time and effort, and also to improve transparency by specifying expense items in detail and to switch quarterly settlement to monthly by reducing the time of calculation.

A Case Study on Villagers' Participation and Project Achievement in Rural Development - Focusing on Saemaul Undong Project in Myanmar - (농촌지역개발의 주민참여와 사업성과에 관한 사례 연구 - 미얀마 농촌공동체 개발사업을 중심으로 -)

  • Lee, Seung-won;Shim, Sung-hee
    • Journal of Korean Society of Rural Planning
    • /
    • v.26 no.3
    • /
    • pp.79-89
    • /
    • 2020
  • Since the Republic of Korea had been registered as the 24th member of OECD DAC in 2009, recent trend of Korea's ODA has showed drastic increase including agriculture and rural development sector. Particularly, various rural development projects have been implemented adopting development experience and methodology of Saemaul Undong (SMU, New Village Movement). This study implemented statistical analysis between villagers' participation and achievement of rural community development project, based on practical data out of 'Saemaul Undong Project in Myanmar', to suggest meaningful implication in terms of participatory rural development. It emphasized the importance and necessity of villagers' participation in rural development through regression analysis that proved positive correlation between villagers' participation and rural development project. It proves that income-generation part has significantly greater influence than capacity-building and living environment part in terms of rural community development project: Based on the analysis, comparing impact of each independent variable, income generation has 1.88 and 1.68 times greater impact than capacity-building and living environment respectively. The result, on the other side, rather raise the importance of careful consideration for project design and implementation to harmonize those three parts altogether especially rural development for developing countries: capacity-building and living environment parts suggests essential foundation to make income generation successful that enables to secure project achievement and sustainability.

UTILITY-BASED PERFORMANCE MEASUREMENT SYSTEM (UBPMS) FOR COMPARISON OF CONSTRUCTION PROJECTS

  • Ki-Hyun Kim;Hee-Sung Cha;Ju-Yeoun Han;Il-Han Yu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1509-1514
    • /
    • 2009
  • CII BM&M(Benchmarking & Metrics) in USA and DTI(Department of Trade and Industry) in UK have built up systems that enable performance measuring and made the results of performance measurement comparable between projects to utilize them as benchmarking tools. By comparing the results of performance measurement, it is possible to grasp the success level of project management and to establish the direction of management. However, construction projects are much diversified and even those projects with the same work type have different attributes. Therefore, simply comparing the results of project performance measurement without considering the characteristics of projects is not justifiable and affects the reliability of the benchmarking results. Therefore, to solve this problem, this study presents a methodology that makes it possible to compare the individual construction projects considering various characteristics. The benefits and importance of project characteristics to overall project performance will be quantitatively expressed and they will be reflected on the results of performance management. By maximally converting multiple projects with different characteristics into the same projects through a new methodology to convert different projects into the same level utilizing such utility-bases and comparing the performances of those projects, project performance results can be utilized in project management as a tool for more accurate decision making and as a robust benchmarking tool.

  • PDF