• 제목/요약/키워드: New Nuclear Power Plant

검색결과 351건 처리시간 0.028초

Innovative Nuclear Power Plant Building Arrangement in Consideration of Decommissioning

  • Choi, Won-Jun;Roh, Myung-Sub;Kim, Chang-Lak
    • Nuclear Engineering and Technology
    • /
    • 제49권3호
    • /
    • pp.525-533
    • /
    • 2017
  • A new concept termed the Innovative Nuclear Power Plant Building Arrangement (INBA) strategy is a new nuclear power plant building arrangement method which encompasses upfront consideration of more efficient decommissioning. Although existing decommissioning strategies such as immediate dismantling and differed dismantling has the advantage of either early site restoration or radioactive decommissioning waste reduction, the INBA strategy has the advantages of both strategies. In this research paper, the concept and the implementation method of the INBA strategy will be described. Two primary benefits will be further described: (1) early site restoration; and (2) radioactive waste reduction. Several other potential benefits will also be identified. For the estimation of economic benefit, the INBA strategy, with two primary benefits, will be compared with the immediate dismantling strategy. The effect of a short life cycle nuclear power plant in combination with the INBA strategy will be reviewed. Finally, some of the major impediments to the realization of this strategy will be discussed.

신규원전의 설계특성 기반 정비효과성감시 프로그램 개발 (Development of Maintenance Effectiveness Monitoring Program based on Design Characteristics for New Nuclear Power Plant)

  • 염동운;현진우;송태영
    • 한국압력기기공학회 논문집
    • /
    • 제8권1호
    • /
    • pp.25-32
    • /
    • 2012
  • Korea Hydro & Nuclear Power Co. (KHNP) has developed and implemented the maintenance effectiveness monitoring (MR) programs for the operating nuclear power plants. The MR program is developed by reflecting design characteristics of the operating nuclear power plants to monitor the plant performance for improving the safety and reliability. Recently, KHNP has built a new nuclear power plant, and developed the MR program to establish the advanced maintenance system by reflecting unique design characteristics based on the OPR1000 standard model. So, the MR program developed in this study has another characteristics in comparison with the OPR1000 standard model, and we will verify the suitability of the MR program through evaluating initial performance of the plant. The safety and reliability of the new plant will be improved by developing and implementing the MR program.

Neutron dose rate analysis of the new CONSTOR® storage cask for the RBMK-1500 spent nuclear fuel

  • Narkunas, Ernestas;Smaizys, Arturas;Poskas, Povilas;Naumov, Valerij;Ekaterinichev, Dmitrij
    • Nuclear Engineering and Technology
    • /
    • 제53권6호
    • /
    • pp.1869-1877
    • /
    • 2021
  • This paper presents the neutron dose rate analysis of the new CONSTOR® RBMK-1500/M2 storage cask intended for the spent nuclear fuel storage at Ignalina Nuclear Power Plant in Lithuania. These casks are designed to be stored in a new "closed" type interim storage facility, with the capacity to store up to 202 CONSTOR® RBMK-1500/M2 casks. In 2016 y, the "hot trials" of this new facility were conducted and 10 CONSTOR® RBMK-1500/M2 casks loaded with the spent nuclear fuel were transported to the dedicated storage places in this facility. During "hot trials", the dose rate measurements of the CONSTOR® RBMK-1500/M2 casks were performed as the dose rate is one of the critical parameter to control and it must be below design (and safety) criteria. Therefore, having the actual data of the spent nuclear fuel characteristics, the neutron dose rate modeling of the CONSTOR® RBMK-1500/M2 cask loaded with this particular fuel was also performed. Neutron dose rate modeling was performed using MCNP 5 computer code with very detailed geometrical representation of the cask and the fuel. The obtained modeling results were compared with the measurement results and it was revealed, that modeling results are generally in good agreement with the measurements.

The Cognitive and Economic Value of a Nuclear Power Plant in Korea

  • Lim, Gil-Hwan;Jung, Woo-Jin;Kim, Tae-Hwan;Lee, Sang-Yong Tom
    • Nuclear Engineering and Technology
    • /
    • 제49권3호
    • /
    • pp.609-620
    • /
    • 2017
  • We studied the value of a nuclear power plant by considering Koreans' willingness to pay (WTP) for neutralizing the various problems caused by building and operating a new plant. For this, we used a conjoint analysis and ordered logistic regression. We then compared the WTP estimates between various segment groups. The results revealed that each household was willing to pay an additional 99,677 Korean Won (KRW)/mo on average to resolve the negative impacts from a nuclear plant. Therefore, the yearly cognitive and economic value of a nuclear plant in Korea was about 19 trillion KRW. Through a segment analysis, we found that the more educated, younger, and poorer groups gave higher cognitive values than the less educated, older, and richer groups, respectively. Also, people who lived far from a plant gave higher values than people living near a plant, and people with more knowledge about or interest in nuclear energy gave higher values than people with less knowledge or interest. People who felt that nuclear energy is necessary gave higher values to nuclear energy than those who did not. Our results can be used as bases to set targets for promoting nuclear energy and pursuing a national project of building a nuclear power plant.

Development of earthquake instrumentation for shutdown and restart criteria of the nuclear power plant using multivariable decision-making process

  • Hasan, Md M.;Mayaka, Joyce K.;Jung, Jae C.
    • Nuclear Engineering and Technology
    • /
    • 제50권6호
    • /
    • pp.860-868
    • /
    • 2018
  • This article presents a new design of earthquake instrumentation that is suitable for quick decision-making after the seismic event at the nuclear power plant (NPP). The main objective of this work is to ensure more availability of the NPP by expediting walk-down period when the seismic wave is incident. In general, the decision-making to restart the NPP after the seismic event requires more than 1 month if an earthquake exceeds operating basis earthquake level. It affects to the plant availability significantly. Unnecessary shutdown can be skipped through quick assessments of operating basis earthquake, safe shutdown earthquake events, and damage status to structure, system, and components. Multidecision parameters such as cumulative absolute velocity, peak ground acceleration, Modified Mercalli Intensity Scale, floor response spectrum, and cumulative fatigue are discussed. The implementation scope on the field-programmable gate array platform of this work is limited to cumulative absolute velocity, peak ground acceleration, and Modified Mercalli Intensity. It can ensure better availability of the plant through integrated decision-making process by automatic assessment of NPP structure, system, and components.

실시간 삼중수소 검출을 위한 단위 양성자 교환 막 전기분해 기초연구 (Fundamental Study of Unit Proton Exchange Membrane Electrolysis for Realtime Detection of Tritium)

  • 채종민;유상석
    • 한국수소및신에너지학회논문집
    • /
    • 제29권2호
    • /
    • pp.226-234
    • /
    • 2018
  • Even though the nuclear power plants has many advantages, safety issues of nuclear power plants are crucial factors of reliable operation. A tritium detector is a useful sensor to analyze amount of exposed radiation from the nuclear power plants. Currently, concentration of underwater tritium is measured precisely but it takes very long time. Since electrolysis is extracted hydrogen from the coolant of nuclear power plant, it can motivate to develop new type of real-time sensor. In this study, Proton Exchange Membrane (PEM) electrolyzer is studied for candidate as preprocessor of real-time tritium detector. Characteristics of the unit PEM electrolyzer were experimentally investigated. A simulation model is developed to understand physical behavior of unit PEM electrolyzer under dynamic operation.

Effects of the move towards Gen IV reactors in capacity expansion planning by total generation cost and environmental impact optimization

  • Bamshad, Ali;Safarzadeh, Omid
    • Nuclear Engineering and Technology
    • /
    • 제53권4호
    • /
    • pp.1369-1377
    • /
    • 2021
  • Nowadays, it is necessary to accelerate the construction of new power plant in face of rising energy demand in such a way that the electricity will be generated at the lowest cost while reducing emissions caused by that generation. The expansion planning is one of the most important issues in electricity management. Nuclear energy comes forward with the low-carbon technology and increasing competitiveness to expand the share of generated energy by introducing Gen IV reactors. In this paper, the generation expansion planning of these new Gen reactors is investigated using the WASP software. Iran power grid is selected as a case of study. We present a comparison of the twenty-one year perspective on the future with the development of (1) traditional thermal power plants and Gen II reactors, (2) Gen III + reactors with traditional thermal power plants, (3) Gen IV reactors and traditional thermal power plants, (4) Gen III + reactors and the new generation of the thermal power plant, (5) the new generation of thermal power plants and the Gen IV reactors. The results show that the Gen IV reactors have the most developing among other types of power plants leading to reduce the operating costs and emissions. The obtained results show that the use of new Gen of combined cycle power plant and Gen IV reactors make the emissions and cost to be reduced to 16% and 72% of Gen II NPPs and traditional thermal power plants, respectively.

원자력 발전소의 해수전해설비 폐수소를 활용한 PEM 연료전지 발전 시스템에 관한 연구 (A study on the power plant system combined with PEM fuel cell and the wasted hydrogen from the sea water electrolyzer of nuclear power plants)

  • 최종원;이주형;차석원;김민수
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2010년도 춘계학술대회 초록집
    • /
    • pp.124.2-124.2
    • /
    • 2010
  • Generally, a coolant of the nuclear power plant is manufactured by electrolyzing the sea water near the plant for making the sodium hypochlorite(NaOCl), which is used for sterilizing the bacteria and the shellfishes sticking to the drains or the pumps at the outlet of the cooling system due to $8-10^{\circ}C$ warmer temperature than the inlet sea water. During manufacturing the sodium hypochlorite, the hydrogen with the high purity is also produced at the anode side of the electrolyzer. This paper describes a novel power plant system combined with the polymer electrolyte membrane(PEM) fuel cell, the wasted hydrogen from the sea water electrolyzer and the wasted heat of the nuclear power plant. The present status over the exhausted hydrogen at twenty nuclear power plants in Korea was investigated in this study, from which an available power generation is estimated. Furthermore, the economic feasibility of the PEM fuel cell power plant is also evaluated by a current regulations over the power production and exchange using a renewable energy shown in Korea Power Exchange(KRX).

  • PDF

Uncertainties impact on the major FOMs for severe accidents in CANDU 6 nuclear power plant

  • R.M. Nistor-Vlad;D. Dupleac;G.L. Pavel
    • Nuclear Engineering and Technology
    • /
    • 제55권7호
    • /
    • pp.2670-2677
    • /
    • 2023
  • In the nuclear safety studies, a new trend refers to the evaluation of uncertainties as a mandatory component of best-estimate safety analysis which is a modern and technically consistent approach being known as BEPU (Best Estimate Plus Uncertainty). The major objectives of this study consist in performing a study of uncertainties/sensitivities of the major analysis results for a generic CANDU 6 Nuclear Power Plant during Station Blackout (SBO) progression to understand and characterize the sources of uncertainties and their effects on the key figure-of-merits (FOMs) predictions in severe accidents (SA). The FOMs of interest are hydrogen mass generation and event timings such as the first fuel channel failure time, beginning of the core disassembly time, core collapse time and calandria vessel failure time. The outcomes of the study, will allow an improvement of capabilities and expertise to perform uncertainty and sensitivity analysis with severe accident codes for CANDU 6 Nuclear Power Plant.