• Title/Summary/Keyword: Network Planning

Search Result 1,403, Processing Time 0.151 seconds

Application Method of GIS for Planning of Forest Road Network (임도망의 계획에 있어서 GIS 활용방안)

  • Jeon, Kwon-Seok;Ma, Ho-Seop
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.5 no.3
    • /
    • pp.99-106
    • /
    • 2002
  • The application method of GIS for planning of forest road network can be save the efforts and cost by frequently change of forest road and evaluation the forest road route before construction. The purpose of this study is to suggest the proper method for planning an optimal forest road network in mountains forest using geographic information system(GIS) in the national forest of Mt. Kumsan at Namhae-gun, Gyungsangnam-do. In the forest road network planning by the minimum longitudinal gradient, The total length was 20.41km, and road density was 6.92m/ha. In the forest road network planning by mixed with the minimum longitudinal gradient and the maximization of investment effect, The total length was 21.15km, and road density was higher than that of the minimum longitudinal gradient as 7.17m/ha. The road length overlapped by cost path was more short than 3.52m/ha of the minimum longitudinal gradient as 1.73km. So, it appeared that forest road has an high effectiveness in yarding function. Therefore, it considered that the geographic information system could provide an effective and resonable solutions for planning of optimal forest road network.

  • PDF

Threat Map Generation Scheme based on Neural Network for Robot Path Planning (로봇 전역경로계획을 위한 신경망 기반 위협맵 생성 기법)

  • Kwak, Hwy-Kuen;Kim, Hyung-Jun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.7
    • /
    • pp.4482-4488
    • /
    • 2014
  • This paper proposes the creation scheme of a threat map for robot global path planning. The threat map was generated using neural network theory by analyzing the robot's armament state and the menace information of an enemy or obstacle. In addition, the performance of the suggested method was verified using the compared result of the damage amount and existing robot path data.

A Development of Reverse Supply Chain Simulation Model Considering a Recycling (재활용을 고려한 역공급사슬 시뮬레이션 모델 개발)

  • Lim, Seok-Jin;Park, Byung-Tae
    • Journal of the Korea Safety Management & Science
    • /
    • v.11 no.4
    • /
    • pp.193-199
    • /
    • 2009
  • Recently, an industrial production-distribution planning problem has been widely investigated in Supply Chain Management(SCM). One of the key issues in the current SCM research area is reverse logistics network. This study have developed a simulation model for the reverse logistics network. The simulation model analysis reverse logistics network issues such as inventory policy, manufacturing policy, transportation mode, warehouse assignment, supplier assignment. Computational experiments using commercial simulation tool ARENA show that the real problems. The model can be used to decide an appropriate production-distribution planning problem in the research area.

A Study on the Application of Scheduling & Planning for Nuclear R &D Projects : Cas of LMR Project (원자력연구개발사업의 공정관리 적용 사례 연구)

  • 한도희
    • Journal of Korea Technology Innovation Society
    • /
    • v.2 no.3
    • /
    • pp.118-128
    • /
    • 1999
  • This study attempts to provide an efficient method for managing the Nuclear R&D projects. It should be noted that the technology and experiences to develop a well-balanced plan and mon-itoring for the R&D project are not yet well established when compared with the commercial con-structionand engineering projects. This study recommends that the R&D project manager utilize the scheduling techniques to establish an integral management system taking in to account the un-certainties in the research environment. Based upon the results of a case study for the Liquid Metal Reactor Design Technology Development Project which is led by the KAERI this study also con-firms that it is possible to run the national nuclear R&D projects with the Scheduling & Planning.

  • PDF

A Production Planning Algorithm for a Supply Chain Network Considering Bark-Order and Resource Capacity Using GRASP Method (GRASP 기법을 이용한 주문이월과 자원제약을 고려한 공급사슬 망에서의 생산계획 알고리즘)

  • Shin, Hyun-Joon;Lee, Young-Sup
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.32 no.3
    • /
    • pp.29-39
    • /
    • 2009
  • In an environment of global competition, the success of a manufacturing corporation is directly related to how it plans and executes production in particular as well as to the optimization level of its process in general. This paper proposes a production planning algorithm for the Multi-Level, multi-item Capacitated Lot Sizing Problem (MLCLSP) in supply chain network considering back-order. MLCLSP corresponds to a mixed integer programming (MIP) problem and is NP-hard. Therefore, this paper proposes an effective algorithm, GRHS (GRASP-based Rolling Horizon Search) that solves this problem within reasonable computational time and evaluates its performance under a variety of problem scenarios.

Transmission Network Expansion Planning Using Reliability and Economic Assessment

  • Kim, Wook-Won;Son, Hyun-Il;Kim, Jin-O
    • Journal of Electrical Engineering and Technology
    • /
    • v.10 no.3
    • /
    • pp.895-904
    • /
    • 2015
  • This paper presents a probabilistic approach of reliability evaluation and economic assessment for solving transmission network expansion planning problems. Three methods are proposed for TNEP, which are reorganizing the existing power system focused on the buses of interest, selecting candidates using modified system operating state method with healthy, marginal and at-risk states, and finally choosing the optimal alternative using cost-optimization method. TNEP candidates can be selected based on the state reliability such as sufficient and insufficient indices, as proposed in this paper. The process of economic assessment involves the costs of construction, maintenance and operation, congestion, and outage. The case studies are carried out with modified IEEE-24 bus system and Jeju island power system expansion plan in Korea, to verify the proposed methodology.

Planning of Streamflow Data Collection Network by Regionalized Regression Model (지역화회귀모형을 이용한 유량관측망의 계측)

  • 조국광;권순국
    • Water for future
    • /
    • v.23 no.1
    • /
    • pp.109-118
    • /
    • 1990
  • In this study, the effectiveness of existing streamflow data collection networks in the Han and the Nakdong River Basin is evaluated for various gaging plans of 5, 10, 15 and 20years planning horizons by the nonlinear integer programming method, and also a technique for adjustment and planning of the existing network is provided for the purpose of increasing the efficiency of the network in terms of ecomony. The objective function is minimization of the average sampling mean square error of regional regression model with regression parameters estimated by generalized least squares method.

  • PDF

A Study on the Urban climate Mitigation Effects with Ecological Landscape Planning with reference to Namyang-Ju Walsanli Master-plan (환경생태계획의 도시기후 변화 대응 가능성 연구 -남양주 월산리 마스터플랜을 중심으로)

  • Moon, Soo Young;Kim, Hyun Soo;Lee, Kwang Bok
    • KIEAE Journal
    • /
    • v.10 no.6
    • /
    • pp.11-19
    • /
    • 2010
  • To meet with the nation's policy of Green Growth, local governments are rushing to propose an ecological urban development plan. And although various studies stress on the need of ecological planning to harmonize development with preservation, we have come to a point in which a quantitative evaluation of how much ecological planning contributes to the environmental load is needed. Through the increasing tendency of making plans based on the development of IT technology, capability of gathering environmental data and scientific instrument, studies on ecological planning's effect towards environmental load has recently begun. This study aims to perform a quantitative evaluation on how ecological planning mitigate urban heat island in the region of Namyang-ju Wallsanli. Three theories were used to mitigate urban heat island ; White network, Green network and Blue network. As a result, the atmosphere temperature was reduced the whole site $1.1^{\circ}C$ and partly $7^{\circ}C$ and the mean radiant temperature was reduced the whole site $1.1^{\circ}C$ and partly $8.7^{\circ}C$ on the modified ecological landscape plan in summer. The PMV index is 0~1 in ecologically modified landscape plan otherwise almost 3 in landscape plan. This study has its limits on the fact that results may differ from the actual plan as the study was performed based on the land use plan and building plan. However, what is important is that it shows a quantitative result of the effect that ecological planning has on surrounding environment and reducing environmental load.

Integrated power system planning considering generation & network planning (발전설비계획과 계통계획을 연계한 통합설비계획에 관한 연구)

  • Han, Seok-Man;Chung, Koo-Hyung;Kim, Bal-Ho H.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.760-762
    • /
    • 2005
  • The introduction of competition in the electricity market requires a new paradigm in the capacity planning. This paper presents a methodology on a generation expansion planning incorporating the transmission expansion planning in the government view point. The proposed idea is exercised on a case study.

  • PDF

Rapid Self-Configuration and Optimization of Mobile Communication Network Base Station using Artificial Intelligent and SON Technology (인공지능과 자율운용 기술을 이용한 긴급형 이동통신 기지국 자율설정 및 최적화)

  • Kim, Jaejeong;Lee, Heejun;Ji, Seunghwan
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.26 no.9
    • /
    • pp.1357-1366
    • /
    • 2022
  • It is important to quickly and accurately build a disaster network or tactical mobile communication network adapting to the field. In configuring the traditional wireless communication systems, the parameters of the base station are set through cell planning. However, for cell planning, information on the environment must be established in advance. If parameters which are not appropriate for the field are used, because they are not reflected in cell planning, additional optimization must be carried out to solve problems and improve performance after network construction. In this paper, we present a rapid mobile communication network construction and optimization method using artificial intelligence and SON technologies in mobile communication base stations. After automatically setting the base station parameters using the CNN model that classifies the terrain with path loss prediction through the DNN model from the location of the base station and the measurement information, the path loss model enables continuous overage/capacity optimization.