• Title/Summary/Keyword: Naval ship acquisition

Search Result 45, Processing Time 0.017 seconds

Basic Design System Centered on Product Structure for Improvement of Naval Ship Acquisition Systems (함정 획득시스템 개선을 위한 제품구조 중심의 기본설계시스템)

  • Oh, Dae-Kyun;Min, Young-Ki
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.48 no.3
    • /
    • pp.215-221
    • /
    • 2011
  • To improve the naval ship acquisition process, systems engineering, modeling and simulation, etc. have been introduced, and there has been ongoing research on acquisition systems for effective support of it. However, due to characteristics of the naval ship acquisition process, development process mainly carried out at a shipyard such as basic design, detailed design, construction and test is difficult to integrate with the acquisition systems of IPT(Integrated Project Team). In addition, research aimed to improve this is rather lacking. In this paper, the naval ship product structure concept proposed in previous research was applied to the basic design system at shipyard, and basic research for expanding the coverage of naval ship acquisition systems to the basic design phase is performed. A data structure of modeling system appropriate to the basic design phase was proposed through research findings and the prototype system based on it was implemented.

A Study on Traceability Management Using SWBS for a Naval Ship Acquisition

  • Jeong, Yeonhwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.7 no.2
    • /
    • pp.31-37
    • /
    • 2011
  • Korean Naval Ship acquisition processes are very complicate. There are 4 phases, Feasibility Study, Concept Design, Basic Design, Detail Design and Construction. A number of organizations and support groups exist to acquire naval war ships. Thus, It is very important how to establish traceability about requirements. This work has investigated how to improve traceability about requirements using Shipboard Work Breakdown Structure.

Study on Identifying the Key Factors for the Decision of Necessity for the Performance Improvement of Naval Ship (함정 성능개량 소요판단에 필요한 요소 식별 연구)

  • Kil, Taejun;Kwon, Pangum
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.53 no.4
    • /
    • pp.249-257
    • /
    • 2016
  • The purpose of this study is finding the key factors for navy to determine the necessity of naval ship PIP(Performance Improvement Program) against the altered battle field environment and politics. Recently, leading countries try to cope actively with the changing international circumstances and technology development trend in the commercial industry. In the case of domestic situation, based on the regulation, it is possible to modify the ship configurations by PIP, but there are not enough criteria and references to make a decision of necessity for the PIP program considering the naval ship acquisition planning by navy. It is necessary to acquire the obvious decision criteria for determination of PIP commencement, by the operational, political and security environment around the Korean peninsula. Considering these conditions, this study proposes the factors necessary for naval ship PIP for navy.

Framework for an Advanced Naval Ships Acquisition based on PLM (PLM 기반 함정획득을 위한 프레임워크 개발 방법론)

  • Shin, Jong-Gye;Oh, Dae-Kyun
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.46 no.2
    • /
    • pp.189-202
    • /
    • 2009
  • As naval ships become more complex with the reduced cost and time for their development, modeling and simulation are increasingly used. The US navy has being applied the concept of a simulation-based acquisition(SBA) to their acquisition process. However, there have been few studies on a simulation-based acquisition for naval ships (SBA-NS) in the Korean naval shipbuilding. In this paper, we discuss a framework to establish collaborative environment(CE) for an advanced naval ships acquisition based on PLM. For this, we propose architectures and a naval ship information model for design the framework of the SBA-NS. To design the framework, we develop the methodology that is composed of three major processes that are the requirement analysis process, the SBA-NS architectures design process and the design process of a reference model of a naval ship product information. Applying the methodology, the framework suitable for the Korean Navy context is developed.

Development of a Naval Ship Product Model and Management System (시뮬레이션 기반 함정 개발을 위한 함정 제품모델 및 관리시스템 개발)

  • Oh, Dae-Kyun;Shin, Jong-Gye;Choi, Yang-Ryul;Yeo, Yong-Hwan
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.46 no.1
    • /
    • pp.43-56
    • /
    • 2009
  • The Korean navy has made many efforts to apply the concepts of PLM (Product Lifecycle Management) and M&S to its naval design and production. However, most of the efforts that have being applied to some acquisition processes, focused only on the element technologies without information models and data frameworks. This study discusses an information model of naval ships for advanced naval acquisitions. We introduce a naval ship product model, and it refers to the DPD (Distributed Product Description) concept of SBA (Simulation-Based Acquisition). To realize the product model concept, we design a data architecture and develop a Product Model Management System (PMMS) based on a PDM System. It is validated through the case study of building the product model of the battle ship that the PMMS has the applicability to effectively manage the naval ship acquisition data on the basis of a 3D product model.

A Methodology for Analyzing on the Correlation of Factors Affecting the Acquisition of Military Weapons Systems : Focused on Factor Analysis of Naval Ship Acquisition Delay Cases (국방무기체계 획득영향요인 상호관계 분석 : 함정획득지연 사례 및 요인 분석을 중심으로)

  • Hwang, Jeong-Oh;Oh, Hyun-Seung;Choi, Bong-Wan;Yim, Dong-Soon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.4
    • /
    • pp.48-58
    • /
    • 2020
  • Naval weapons systems of the Republic of Korea are acquired through the Defense Planning Management System. Recently, acquisition of some naval ships have been delayed, and the causes of the delays have been recognized as inappropriate project management at the Execution Phase. However, we argue that the delay problem in naval ships acquisition should be approached, with due regard for the entire Defense Planning Management System. That is, We should try to investigate from Planning Phase to those of Programming, Budgeting and Execution Phases. Therefore, in this study, we investigated the actual cases of the delay in naval acquisition at all phases of the Defense Planning Management System. Based on the investigation, we tried to identify the naval ship Acquisition Delay Factors and find out the Weights of those factors. As the next step, we calculated the Influence Measures on the naval missions, including the Cost of Naval Capability Gap derived from the delays in acquisition of naval ships. As a final step, we calculated the Acquisition Delay Measures based on the interrelationship between the Acquisition Delay Factors and the Influence Measures. Then we evaluated and analyzed what the results stand for. Finally, we made suggestions for future improvement. The improvement suggestions we made for preventing delay in acquisition of naval ships in this study are as follows. First, we need a shift in perception. It is necessary to measure the Acquisition Delay Factors in acquiring naval ships and manage them from the Planning Phase. Second, resolution must be concerted efforts. All relevant agencies, not just a few, should work together to resolve the problems of acquisition delay. Third, analysis must be based on the accumulation of data. This allows the elaborating of naval ship Acquisition Delay Factors and Delay Measures. If this research method is applied to other military weapons systems in the future, we may be able to not just identify the Acquisition Delay Factors in acquisition of other military weapons systems, but also pursue improvement in those cases.

The Directions and Indicators Derivation for the Efficiency of Naval Ship Acquisition Programs' Performance Evaluation (효과적인 함정사업 성과평가를 위한 발전방향 및 성과평가 지표 도출)

  • Guck Cheol Bang;Sung Chul Shin;Joong Yoon Lee;Peom Park
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.19 no.2
    • /
    • pp.117-125
    • /
    • 2023
  • Systematic performance evaluation of the Defense Acquisition Program is very important, since they are directly related to national security. In this paper, we reviewed various performance evaluation models from a methodological perspective for pragmatic performance evaluation, and the limitations of each model. In order to evaluate the performance of the Defense acquisition program efficiently, especially for the Naval ship Projects and considering their unique characteristics, both various stakeholders' participation, standard indicators for performance measurement, and tailoring them considering the projects' circumstances are necessary. We also propose indicators, contents, and detailed criteria example for the Requirements management. This approach enables a pragmatic and consistent evaluation of defense projects, and through this, meaningful insights could be acquired with accumulate data.

A Study on Efficient Test & Evaluation Methods in Naval Ship Acquisitions (함정사업 시험평가의 효율적 수행방안에 관한 연구)

  • Kim, Jaeyong;Choi, Woensug;Hong, Sukyoon;Chung, Hyungyun;Song, Jeehun;Im, Wooseok;Kwon, Hyunwung
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.19 no.6
    • /
    • pp.703-711
    • /
    • 2016
  • The purposes of this study is to identify the problems arising from current Test & Evaluation process of the naval ship acquisition program and to suggest methods to increase the acquisition efficiency. Considering that the present rule of developmental test &evaluation(DT&E) and operational test & evaluation(OT&E) has caused an inefficiency effect on the acquisition procedures due to the limited practices on it, the DT&E and OT&E procedures through test & evaluation master plan(TEMP) is proposed based on the selective practices of the defense instruction articles. Also, considering characteristics of naval ship acquisitions, efficient procedure systems are derived through case analysis results by comparing each performances of the system. The suggested methods are able to meet the requirements of the changed acquisition environments and also increase efficiency of acquisition systems by adoption of DT&E and OT&E combined test scheme.

Study on Automation for Verification of Naval Ship's Operational Scenarios using Simulation: Focusing on Crew Messroom Case (시뮬레이션을 이용한 함정 운용 시나리오 검증 자동화 연구: 승조원을 고려한 Crew Messroom 운용성 검증을 중심으로)

  • Oh, Dae-Kyun;Lee, Dong-Kun
    • Journal of Ocean Engineering and Technology
    • /
    • v.27 no.1
    • /
    • pp.24-30
    • /
    • 2013
  • The Korea Navy has been making constant efforts to apply M&S (modeling and simulation) to naval ship development, and the generalization of M&S for ship development is a trend. M&S for ship design is used for the V&V (verification and validation) of its design and operation, including design verification and ergonomic design that considers the crew using the Naval Ship Product Model. In addition, many parts of this M&S are repeatedly accomplished regardless of the kinds of ships. This study aims to standardize M&S, which repeatedly applies similar verifications for operation scenarios. A congestion assessment simulation for the major spaces of ships was the subject of the standardization based on the leading research results of various researchers, and a simulation automation solution was suggested. An information model using XML was proposed through the simulation automation concept, and a prototype system based on it was implemented. The usability was shown through a case study that verified the operability performance of the crew messroom.

Design of Technical Information System for Naval Engineering (조함기술정보체계 설계에 관한 연구)

  • 심이섭
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.41 no.2
    • /
    • pp.121-127
    • /
    • 2004
  • The objective of this study is to design the technical information system for naval engineering (named TISNE). As the basic concept of the system, CALS (Continuous Acquisition and Life-cycle Support) and KMS(Knowledge Management System) were considered for the management and sharing of standardized digital information throughout the life-cycle of naval ship. To define the system components and their functionalities, the processes of naval ship design and construction were reviewed. Also web-based system prototype and the graphical user interlaces were designed and implemented.