The purpose of this study was carried out to determine the optimum sowing date and days after sowing (DAS) in automatic facility located at Uiseong of Gyeoungbuk province. The seedling height was rapidly increased with a delay of sowing time from April to May. The 10-day old seedlings with suitable plant height (> l0cm) for machine transplanting in the facility were obtained when the seeds sowed after May 20 at Uiseong in Gyeoungbuk province. The dry weight-height ratio of 10-day old seedlings was significantly decreased when the seeds sowed after June 20, and 15-days old seedlings did after May 10. No. of panicles/hill was reduced with increasing of days after seeding. But there were no significant difference among other yield components such as no. of grains/panicle, ratio of ripened grains, and 1,000 grain weight. The highest grain yield, 748kg/10a, was attained from the 10-day old seedlings transplanted at May 27 in comparision with those of 15-day and 20-day old seedlings. The grain yield of 10-day old seedlings transplanted at June 26 was also higher than that of 15-day old seedlings.
Small-scale wastewater discharge facilities account for 98% of all workplaces, but in the generation and emission of major pollutants, they account for 27.5 % and 23.5 %, respectively. Since the proportion of the emission load of the small-scale workplace is not large, the national environmental policy has been established mainly around large-scale wastewater discharge facilities. However, in the case of specific hazardous substances in water, the amount of the discharge load of the small-scale wastewater discharge facility was 2.4 times higher than that of the generation load. Certain types of specific hazardous substances in water, which have a higher discharge load than large-scale wastewater discharge facilities, account for 24 ~ 32 %. There are also cases in which the discharge load from a small-scale discharge facility is more than four times higher, depending on the specific kind of water pollutant. As a result of inspections, the violation rate of the small-scale wastewater discharge facility among the total violations by facilities is 93.9 ~ 97.5 %. As a result, the ecotoxicity value of small-scale wastewater discharge facilities was high in most industries, and there was a fluctuation in the measured value. This indicates that the ecological integrity of the water system can be largely influenced by small-scale wastewater discharge facilities. Therefore, it is necessary to expand the environmental management of small-scale wastewater discharge facilities, and in some cases, the effect of the improvement in quality may be more significant than in the management of large-scale wastewater discharge facilities.
Journal of the Korea institute for structural maintenance and inspection
/
v.14
no.6
/
pp.246-253
/
2010
National major facilities have been rigorously investigated using regular safety inspections and precision safety diagnosis since the Special Law for Facilities Safety Management was made in 1995. However, the process of safety inspection and precision safety diagnosis could be doubted due to intervention of facility owner for safety level evaluation, competition to obtain low price order, and low technical skills of inspection companies. Although the management processes for evaluating the inspection companies were used for several years, the process should continue to improve in the safety inspection field. This study analyzed the recent evaluation system and the ratios of insufficient inspection. Estimation of national loss expenses to the insufficient safety inspection was investigated to recognize the necessity for the improvement of facility inspection process and evaluation system.
Workers' safety from radiological exposure in a 1 ton/day capacity spent resin treatment facility was evaluated according to the operating times and outflow rate due to process related leakages. The conservative annual dose based on the operating times of the workers exceeded the dose limit by at least 7.38E+01 mSv for close work. The realistic dose range was derived as 1.62E+01 mSv-6.60E+01 mSv. The conservative and realistic annual doses for remote workers were 1.33E+01 mSv and 3.00E+00 mSv respectively, which were less than the dose limit. The MWR was identified as the major contributor to worker exposure within the 1 h period required for removal of radioactive materials. The dose considering both internal and external exposures without APF was derived to be 1.92E+01 mSv for conservative evaluation and 4.00E+00 mSv for realistic evaluation. Furthermore, the dose with APF was derived as 7.27E-01 mSv for conservative evaluation and 1.51E-01 mSv for realistic evaluation. Considering the APF for leakage from all parts, the dose range was derived as 1.25E+00 mSv-2.03E+00 mSv for conservative evaluation and 2.61E-01 mSv-4.23E-01 mSv for realistic evaluation. Hence, it was confirmed that radiological safety was secured in the event of a leakage accident.
Lee, Jeong Han;Kim, Yong Gon;Lee, Jae Won;Kim, Jong Hoon
Journal of the Korean Society of Safety
/
v.37
no.5
/
pp.33-41
/
2022
As the number of automobile registrations increases yearly, parking spaces that are located in downtown areas are increasing, and mechanical parking facilities are also increasing. Therefore, there is a high risk of accidents when installing and repairing a mechanical parking facility. In the preceding six years (from 2012 to 2018), the statistics that pertain to accidental disasters indicated that a total of 137 disaster victims were generated by the construction sector, 33 accidents occurred, and 10 people died. However, only the safety management items pertaining to accidents that occur during maintenance work and the use of the installed mechanical parking facilities are being studied; furthermore, there is no ongoing research with respect to the risk management that is conducted at the construction site. In 2017, the Korea Occupational Safety and Health Agency (KOSHA) announced the "Guidelines for Safe Installation and Maintenance of Mechanical Parking Equipment"; however, it is a safety guideline that is limited to the installation of basic protective equipment and to facility installation. There is no model for mechanical parking facilities that is indicated in the "Risk Assessment Model by Construction Industry Type", which is issued by the Safety and Health Corporation and is widely utilized for risk assessment in the construction industry; moreover, elevator installation work CODE N0: 22 is the only major example of a disaster. In this study, "risk assessment through a focus group interview" was performed, and data was derived from the "risk assessment of Article 41 (2) of the Industrial Safety and Health Act", which reflects the characteristics of the construction industry based on AHP analysis. The results of this study can be utilized for the risk assessment that is conducted during the construction stage of mechanical parking facilities.
Kim, Hyun-Sook;Lee, Byung-Doo;Kim, In-Cheol;Kim, Hyun-Jo;Jung, Ju-Ang;Lee, Sung-Ho
Proceedings of the Korean Radioactive Waste Society Conference
/
2016.05a
/
pp.25-26
/
2016
In this paper, the major changes of the national inspection in respect of the KAERI nuclear facilities were summarized. The frequency of the national inspection was decreased since the amendment of the Notification of the NSSC on the national inspection. But the national inspection broadened its scope and its implementation procedures and criteria were not clear. So, it is necessary to establish and enhance the national inspection system including the implementing guides and criteria. In addition, the internal regulation of the nuclear material accountancy for the nuclear facilities should be approved from the NSSC and observed by the KAERI in accordance with the national law. As the Notification of the NSSC on the national inspection was amended in Sep. 2014, it need to be revised to reflect the detail accountancy procedures and the preparation of the national inspection. So, KAERI will revise it to meet the international and national requirements as well as to implement the safeguards effectively at facility level.
Likelihood analysis was used for the revision of release probability/frequency in chlorine Injection facilities used in chlorine process. Typically these facilities consist of pressure cylinder, vaporizer, pipeline, measuring equipment and safety equipment. This paper described the incident scenarios considered, likelihood analysis procedure and the selection and application of basic events and for failure rates of mechanical components. Human errors were also considered. The major objective of this paper is to estimate the likelihood of each determined incident scenarios. We estimated failure rates of mechanical components based on likelihood analysis procedure. Human errors were also considered. It was estimated to have $5.73{\times}10^{-5}\;Cl_2$ leak per year during the major $Cl_2$ handling process. The probability of failure in scrubber system was $4.11{\times}10^{-2}/demand$.
Direct ECC bypass phenomena that occur in a reactor vessel downcomer with a Direct Vessel Injection (DVI) system during the reflood phase of a Large Break Loss-of-Coolant Accident (LBLOCA) are experimentally investigated using a transparent l/7.5 scaled down test facility of the Upper Plenum Test Facility (UPTF). A series of separate effect tests are peformed in order to investigate the mechanisms of direct ECC bypass and to find out its scaling parameters. Various flow regimes and phasic distribution in downcomer are identified and mapped, and the fraction of direct ECC bypass is measured under a wide range of air and water injection conditions. From the counterpart test of the UPTF Test 21-D, the dimensionless gas velocity ( $j^{*}$$_{g,eff}$) is derived experimentally, which is believed to be a major scaling parameter for the fraction of direct ECC bypass. And it is found out that the direct ECC bypass is greatly affected by the spreading width of ECC water film and the geometric configuration of the downcomer.r.
This study investigated the fate of dissolved organic matter (DOM) in a water reclamation facility (WRF) in Korea. The WRF consists of coagulation, sedimentation, microfiltration, and reverse osmosis (RO) components. The production capacity of WRF is 90,000 m3/day. The reclaimed water is reused as industrial water. We also characterized DOM in raw, processed, and finished waters based on analysis of dissolved organic carbon (DOC), ultraviolet absorbance at 254 nm (UVA254), fluorescence excitation emission matrix (FEEM), and DOC fractions via liquid chromatography-organic carbon detection (LC-OCD). Based on the results of DOC, UVA254, and FEEM analyses, neither the coagulation/sedimentation nor the microfiltration at the WRF effectively removed DOM. The RO process removed more than 94% of DOM. The raw water (i.e., secondary treated effluent obtained from a wastewater treatment plant) exhibited tryptophan-like peaks, which are a promising marker of wastewater, in the FEEM analysis. Coagulation and microfiltration failed to eliminate the wastewater marker, whereas RO completely removed it. The raw water also carried high levels (89.4%) of hydrophilic and low-molecular weight substances, which are difficult to remove via coagulation-sedimentation or microfiltration. Humic substance was a major component of the hydrophilic fractions. Based on the LC-OCD analysis, RO effectively removed the humic and polymeric materials from DOM.
Kim, Sung-Bum;Oh, Gil-Jong;Kim, Kye-Yeun;Jung, Myung-Sook
Journal of the Korea Organic Resources Recycling Association
/
v.14
no.2
/
pp.71-82
/
2006
This study was carried out to assess and analyze the overall problems of the facilities in recycling and treating of foodwaste on the basis of the unit operation facilities. It proposes effective alternatives for the high profitable management that can meet the regulation of the facilities. The study is composed of several parts including a collection of academic reports, field studies regarding the facilities operated by local government and the private sector, the analysis on odor samples from compost facilities and processing facilities for animal feed from foodwaste. Twenty facilities were surveyed on the field to find out the existing problems and to compare between facilities. Several facilities didn't meet the governmental regulation on some processes, especially the stages of input, storage, odor control and the qualities of final products under the unit equipment operation. The analysis on the odors from the phases of input, shredding and fermentation of a compost facility and processing facilities for feed, the odors from shredding equipments were higher in concentration than the others. The Major odors from the composting facility contained hydrogen sulfide ($H_2S$), methyl mercaptan ($CH_3{SH}$), Dimethyl sulfide ($(CH_3)_2S$) and Ammonia ($NH_3$) and the major odors from the animal feed facility contained methyl mercaptan ($CH_3{SH}$), Trimethylamine ($(CH_3)_3N$) and Acetaldehyde ($CH_3CHO$).
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.