• Title/Summary/Keyword: National Major Facility

Search Result 285, Processing Time 0.032 seconds

Determination of Seeding Date and Seedling Age in Raising Seedling using Automatic Facility (벼 자동화 육묘시설에서 적정 파종기와 묘대기간의 선정)

  • Jung, Suk-Jo;Sohn, Jae-Keun
    • Current Research on Agriculture and Life Sciences
    • /
    • v.23
    • /
    • pp.1-8
    • /
    • 2005
  • The purpose of this study was carried out to determine the optimum sowing date and days after sowing (DAS) in automatic facility located at Uiseong of Gyeoungbuk province. The seedling height was rapidly increased with a delay of sowing time from April to May. The 10-day old seedlings with suitable plant height (> l0cm) for machine transplanting in the facility were obtained when the seeds sowed after May 20 at Uiseong in Gyeoungbuk province. The dry weight-height ratio of 10-day old seedlings was significantly decreased when the seeds sowed after June 20, and 15-days old seedlings did after May 10. No. of panicles/hill was reduced with increasing of days after seeding. But there were no significant difference among other yield components such as no. of grains/panicle, ratio of ripened grains, and 1,000 grain weight. The highest grain yield, 748kg/10a, was attained from the 10-day old seedlings transplanted at May 27 in comparision with those of 15-day and 20-day old seedlings. The grain yield of 10-day old seedlings transplanted at June 26 was also higher than that of 15-day old seedlings.

  • PDF

Necessity of Strengthening Small-Scale Wastewater Discharge Facilities Management (소규모 폐수배출시설 관리 강화의 필요성)

  • Park, Jae Hong;Rhew, Doug Hee
    • Journal of Korean Society on Water Environment
    • /
    • v.34 no.2
    • /
    • pp.226-233
    • /
    • 2018
  • Small-scale wastewater discharge facilities account for 98% of all workplaces, but in the generation and emission of major pollutants, they account for 27.5 % and 23.5 %, respectively. Since the proportion of the emission load of the small-scale workplace is not large, the national environmental policy has been established mainly around large-scale wastewater discharge facilities. However, in the case of specific hazardous substances in water, the amount of the discharge load of the small-scale wastewater discharge facility was 2.4 times higher than that of the generation load. Certain types of specific hazardous substances in water, which have a higher discharge load than large-scale wastewater discharge facilities, account for 24 ~ 32 %. There are also cases in which the discharge load from a small-scale discharge facility is more than four times higher, depending on the specific kind of water pollutant. As a result of inspections, the violation rate of the small-scale wastewater discharge facility among the total violations by facilities is 93.9 ~ 97.5 %. As a result, the ecotoxicity value of small-scale wastewater discharge facilities was high in most industries, and there was a fluctuation in the measured value. This indicates that the ecological integrity of the water system can be largely influenced by small-scale wastewater discharge facilities. Therefore, it is necessary to expand the environmental management of small-scale wastewater discharge facilities, and in some cases, the effect of the improvement in quality may be more significant than in the management of large-scale wastewater discharge facilities.

Estimation of National Loss Expenses to Insufficient Safety Inspection and Precision Safety Diagnosis (부실 정밀점검 및 정밀안전진단의 국가적 손실비용 추정)

  • Ha, Myung-Ho;Park, Jong-Sup
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.6
    • /
    • pp.246-253
    • /
    • 2010
  • National major facilities have been rigorously investigated using regular safety inspections and precision safety diagnosis since the Special Law for Facilities Safety Management was made in 1995. However, the process of safety inspection and precision safety diagnosis could be doubted due to intervention of facility owner for safety level evaluation, competition to obtain low price order, and low technical skills of inspection companies. Although the management processes for evaluating the inspection companies were used for several years, the process should continue to improve in the safety inspection field. This study analyzed the recent evaluation system and the ratios of insufficient inspection. Estimation of national loss expenses to the insufficient safety inspection was investigated to recognize the necessity for the improvement of facility inspection process and evaluation system.

Dose evaluation of workers according to operating time and outflow rate in a spent resin treatment facility

  • Byun, Jaehoon;Choi, Woo Nyun;Kim, Hee Reyoung
    • Nuclear Engineering and Technology
    • /
    • v.53 no.11
    • /
    • pp.3824-3836
    • /
    • 2021
  • Workers' safety from radiological exposure in a 1 ton/day capacity spent resin treatment facility was evaluated according to the operating times and outflow rate due to process related leakages. The conservative annual dose based on the operating times of the workers exceeded the dose limit by at least 7.38E+01 mSv for close work. The realistic dose range was derived as 1.62E+01 mSv-6.60E+01 mSv. The conservative and realistic annual doses for remote workers were 1.33E+01 mSv and 3.00E+00 mSv respectively, which were less than the dose limit. The MWR was identified as the major contributor to worker exposure within the 1 h period required for removal of radioactive materials. The dose considering both internal and external exposures without APF was derived to be 1.92E+01 mSv for conservative evaluation and 4.00E+00 mSv for realistic evaluation. Furthermore, the dose with APF was derived as 7.27E-01 mSv for conservative evaluation and 1.51E-01 mSv for realistic evaluation. Considering the APF for leakage from all parts, the dose range was derived as 1.25E+00 mSv-2.03E+00 mSv for conservative evaluation and 2.61E-01 mSv-4.23E-01 mSv for realistic evaluation. Hence, it was confirmed that radiological safety was secured in the event of a leakage accident.

Risk Assessment of Mechanical Parking Facility during Construction based on AHP Analysis (AHP 분석을 이용한 기계식 주차설비 건설 중 위험성 평가방안 연구)

  • Lee, Jeong Han;Kim, Yong Gon;Lee, Jae Won;Kim, Jong Hoon
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.5
    • /
    • pp.33-41
    • /
    • 2022
  • As the number of automobile registrations increases yearly, parking spaces that are located in downtown areas are increasing, and mechanical parking facilities are also increasing. Therefore, there is a high risk of accidents when installing and repairing a mechanical parking facility. In the preceding six years (from 2012 to 2018), the statistics that pertain to accidental disasters indicated that a total of 137 disaster victims were generated by the construction sector, 33 accidents occurred, and 10 people died. However, only the safety management items pertaining to accidents that occur during maintenance work and the use of the installed mechanical parking facilities are being studied; furthermore, there is no ongoing research with respect to the risk management that is conducted at the construction site. In 2017, the Korea Occupational Safety and Health Agency (KOSHA) announced the "Guidelines for Safe Installation and Maintenance of Mechanical Parking Equipment"; however, it is a safety guideline that is limited to the installation of basic protective equipment and to facility installation. There is no model for mechanical parking facilities that is indicated in the "Risk Assessment Model by Construction Industry Type", which is issued by the Safety and Health Corporation and is widely utilized for risk assessment in the construction industry; moreover, elevator installation work CODE N0: 22 is the only major example of a disaster. In this study, "risk assessment through a focus group interview" was performed, and data was derived from the "risk assessment of Article 41 (2) of the Industrial Safety and Health Act", which reflects the characteristics of the construction industry based on AHP analysis. The results of this study can be utilized for the risk assessment that is conducted during the construction stage of mechanical parking facilities.

The National Inspection at KAERI

  • Kim, Hyun-Sook;Lee, Byung-Doo;Kim, In-Cheol;Kim, Hyun-Jo;Jung, Ju-Ang;Lee, Sung-Ho
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2016.05a
    • /
    • pp.25-26
    • /
    • 2016
  • In this paper, the major changes of the national inspection in respect of the KAERI nuclear facilities were summarized. The frequency of the national inspection was decreased since the amendment of the Notification of the NSSC on the national inspection. But the national inspection broadened its scope and its implementation procedures and criteria were not clear. So, it is necessary to establish and enhance the national inspection system including the implementing guides and criteria. In addition, the internal regulation of the nuclear material accountancy for the nuclear facilities should be approved from the NSSC and observed by the KAERI in accordance with the national law. As the Notification of the NSSC on the national inspection was amended in Sep. 2014, it need to be revised to reflect the detail accountancy procedures and the preparation of the national inspection. So, KAERI will revise it to meet the international and national requirements as well as to implement the safeguards effectively at facility level.

  • PDF

Likelihood Estimation of Release Incidents in Chlorine$(Cl_2)$ Facility (염소$(Cl_2)$시설에 대한 누출가능성 예측)

  • Lee, Jae-Jun;Kim, Tae-Su;Lee, Dae-Hee;Yoo, Byung-Tae;Baek, Jong-Bae;Ko, Jae-Wook;An, Hyung-Hwan
    • 한국가스학회:학술대회논문집
    • /
    • 2007.04a
    • /
    • pp.180-185
    • /
    • 2007
  • Likelihood analysis was used for the revision of release probability/frequency in chlorine Injection facilities used in chlorine process. Typically these facilities consist of pressure cylinder, vaporizer, pipeline, measuring equipment and safety equipment. This paper described the incident scenarios considered, likelihood analysis procedure and the selection and application of basic events and for failure rates of mechanical components. Human errors were also considered. The major objective of this paper is to estimate the likelihood of each determined incident scenarios. We estimated failure rates of mechanical components based on likelihood analysis procedure. Human errors were also considered. It was estimated to have $5.73{\times}10^{-5}\;Cl_2$ leak per year during the major $Cl_2$ handling process. The probability of failure in scrubber system was $4.11{\times}10^{-2}/demand$.

  • PDF

Air-Water Test on the Direct ECC Bypass During LBLOCA Reflood Phase with DVI : UPTF Test 21-D Counterpart Test

  • Yun, Byong-Jo;Kwon, Tae-Soon;Song, Chul-Hwa;Euh, Dong-Jin;Park, Jong-Kyun;Cho, Hyoung-Kyu;Park, Goon-Cherl
    • Nuclear Engineering and Technology
    • /
    • v.33 no.3
    • /
    • pp.315-326
    • /
    • 2001
  • Direct ECC bypass phenomena that occur in a reactor vessel downcomer with a Direct Vessel Injection (DVI) system during the reflood phase of a Large Break Loss-of-Coolant Accident (LBLOCA) are experimentally investigated using a transparent l/7.5 scaled down test facility of the Upper Plenum Test Facility (UPTF). A series of separate effect tests are peformed in order to investigate the mechanisms of direct ECC bypass and to find out its scaling parameters. Various flow regimes and phasic distribution in downcomer are identified and mapped, and the fraction of direct ECC bypass is measured under a wide range of air and water injection conditions. From the counterpart test of the UPTF Test 21-D, the dimensionless gas velocity ( $j^{*}$$_{g,eff}$) is derived experimentally, which is believed to be a major scaling parameter for the fraction of direct ECC bypass. And it is found out that the direct ECC bypass is greatly affected by the spreading width of ECC water film and the geometric configuration of the downcomer.r.

  • PDF

Fate and Characteristics of Dissolved Organic Matters in a Water Reclamation Facility, Korea (하수처리수 재이용시설의 공정별 용존유기물질 거동 및 특성)

  • Kwon, Eun-Kwang;Lee, Wontae
    • Journal of Korean Society on Water Environment
    • /
    • v.37 no.5
    • /
    • pp.355-362
    • /
    • 2021
  • This study investigated the fate of dissolved organic matter (DOM) in a water reclamation facility (WRF) in Korea. The WRF consists of coagulation, sedimentation, microfiltration, and reverse osmosis (RO) components. The production capacity of WRF is 90,000 m3/day. The reclaimed water is reused as industrial water. We also characterized DOM in raw, processed, and finished waters based on analysis of dissolved organic carbon (DOC), ultraviolet absorbance at 254 nm (UVA254), fluorescence excitation emission matrix (FEEM), and DOC fractions via liquid chromatography-organic carbon detection (LC-OCD). Based on the results of DOC, UVA254, and FEEM analyses, neither the coagulation/sedimentation nor the microfiltration at the WRF effectively removed DOM. The RO process removed more than 94% of DOM. The raw water (i.e., secondary treated effluent obtained from a wastewater treatment plant) exhibited tryptophan-like peaks, which are a promising marker of wastewater, in the FEEM analysis. Coagulation and microfiltration failed to eliminate the wastewater marker, whereas RO completely removed it. The raw water also carried high levels (89.4%) of hydrophilic and low-molecular weight substances, which are difficult to remove via coagulation-sedimentation or microfiltration. Humic substance was a major component of the hydrophilic fractions. Based on the LC-OCD analysis, RO effectively removed the humic and polymeric materials from DOM.

Odor control of Foodwaste Treatment Facilities (음식물류폐기물처리시설의 악취관리대책에 관한 연구)

  • Kim, Sung-Bum;Oh, Gil-Jong;Kim, Kye-Yeun;Jung, Myung-Sook
    • Journal of the Korea Organic Resources Recycling Association
    • /
    • v.14 no.2
    • /
    • pp.71-82
    • /
    • 2006
  • This study was carried out to assess and analyze the overall problems of the facilities in recycling and treating of foodwaste on the basis of the unit operation facilities. It proposes effective alternatives for the high profitable management that can meet the regulation of the facilities. The study is composed of several parts including a collection of academic reports, field studies regarding the facilities operated by local government and the private sector, the analysis on odor samples from compost facilities and processing facilities for animal feed from foodwaste. Twenty facilities were surveyed on the field to find out the existing problems and to compare between facilities. Several facilities didn't meet the governmental regulation on some processes, especially the stages of input, storage, odor control and the qualities of final products under the unit equipment operation. The analysis on the odors from the phases of input, shredding and fermentation of a compost facility and processing facilities for feed, the odors from shredding equipments were higher in concentration than the others. The Major odors from the composting facility contained hydrogen sulfide ($H_2S$), methyl mercaptan ($CH_3{SH}$), Dimethyl sulfide ($(CH_3)_2S$) and Ammonia ($NH_3$) and the major odors from the animal feed facility contained methyl mercaptan ($CH_3{SH}$), Trimethylamine ($(CH_3)_3N$) and Acetaldehyde ($CH_3CHO$).

  • PDF