The 6th International Conference on Construction Engineering and Project Management
/
pp.252-254
/
2015
Building Information Modeling (BIM) encourages effective information share and utilization among project participants during entire life cycle of facility. This paper presents a method that keeps track of the historical quality records involved in construction operations and facilitates using BIM. The method is coded into BIM based Quality Record Traceability (BIM-QRT) System that makes use of historical records obtained from database administrating construction operations. This study is of value to practitioners because the method makes clear the project participants' responsibility relative to the quality of each and every element of the facility. The main objective of this research is to develop an accurate, fully automated method for construction Quality Record Tracking by using a BIM along with construction operations data obtained by information technology. Test cases verify the usability and validity of the methods implemented in the system.
The 5th International Conference on Construction Engineering and Project Management
/
pp.509-512
/
2013
An inappropriate space zoning plan causes the unnecessary transportation of construction material and equipment among work areas and increases the disorder of work space. Space zoning is an essential operation management technique which contributes to reduce the process and/or operation idle-time. This paper introduces a method that computes the idle-times between construction operations (or processes) by using Web-CYCLONE. It allows computing with idle-times that affect the construction productivity. Using the idle time between operations and between processes, it computes the optimal number of zones and finds the optimal combination of zones that minimize the idle times. The method contributes to minimize the idle times relative to the operation schedule using complete enumeration. This paper presents the system prototype in detail. A case study is presented to demonstrate the system and verifies the validity of the model. It allows a project manager to establish space zoning plan that effectively segregates a project into optimal number of construction zones and to assign the constrained resources (e.g., laborer, equipment).
The 3th International Conference on Construction Engineering and Project Management
/
pp.949-955
/
2009
Managing knowledge effectively is a critical factor for the competitive power of a company. There are efforts to use knowledge as an important resource in many industrial areas and likewise the interest in knowledge management is growing in the construction industry. Nevertheless, there are limitations in the current capture and reuse of knowledge in the construction industry owing to the unique characteristics of the knowledge created during the processes of projects. The knowledge produced during the processes of construction projects is project-oriented, experiential and context specific and due to these characteristics the reuse of knowledge is difficult. In this research, we focus on capturing and identifying the characteristics of construction knowledge and propose a method to apply these characteristics in developing an ontology based construction knowledge retrieval system to improve construction knowledge retrieval and enhance knowledge reuse.
Seon-Gyoo Kim;Chan-Jeong Park ;Moon-Serk Yang;Jin-Bong Kim ;Hyung-John Shin
국제학술발표논문집
/
The 1th International Conference on Construction Engineering and Project Management
/
pp.341-346
/
2005
After the IMF shock, some major construction companies in Korea have been motivated to avoid and mitigate various risk factors which could be critical and catastrophic events to corporate revenue and organization internally or externally. It means that they are trying to introduce and set up a risk management plan and system suitable to their organization and culture. L construction co. ltd. is one of major construction companies that have been searching methodologies or technologies to manage various risk factors surrounding corporate marketing and project operation. This paper presents an unique approach to develop a model of risk management plan and system suitable to L construction itself focused on the construction phase.
The planning phase of construction project success or failure of the enterprise decision the 1st dangerous duration which occurs very there is a possibility of making with the phase which is important, of construction project in life cycle most many risk. But the risk management from planning phase well does not become accomplished is the actual condition from existing construction project. Consequently, it classifies the risk event from project initial planning phase of construction project from this study which probably is substantial risk event the possibility of accomplishing from a planning phase successfully in order to be.
Journal of Construction Engineering and Project Management
/
제3권1호
/
pp.10-13
/
2013
Determining on a particular construction method is typically decided in the initial phases of a project. However, changing conditions during actual construction may require a different method or technology to be employed. Providing an option for project managers to change construction provides flexibility that can increase value to the overall project. This research provides the ability to modify construction methods as a real option, which allows its value to be modeled. The research also formalizes a way to integrate a binomial lattice model with the Earned Value Method's S-curve. The integrated model provides a decision support tool that planners can use to determine whether to exercise the option depending on the status metrics provided by EVM.
The 1th International Conference on Construction Engineering and Project Management
/
pp.515-519
/
2005
Most information within a construction project roots in drawings and contract documents. Although several methodologies, such as A/E/C and 4D, have employed such a peculiarity to integrate project information, they failed to integrate information in terms of efficiency and consistency. In this research, a MD (Multi-Dimensional) CAD model is developed to improve the process of integrating information for construction projects. This research describes the processes of creating MD CAD objects and embedding information required throughout the project life cycle within MD CAD building components. In addition, a case study is presented to show the efficiency and effectiveness of using MDIIS (Multi-Dimensional Information Integration System) to integrate information for construction projects.
Kim, Hyeon Seung;Shin, Jong Myeong;Park, Sang Mi;Kang, Leen Seok
국제학술발표논문집
/
The 6th International Conference on Construction Engineering and Project Management
/
pp.344-348
/
2015
The image data of the web camera is used to identify the construction status of the site in a remote office and it can be used for safety management. This study develops a construction schedule simulation system based on the active nD object linked with real image data of web camera from the construction site. The progress control method by 4D object uses a method that the progress of each activity is represented with different colors by progress status. Since this method is still based on a virtual reality object, it is less realistic description for practical engineers. Therefore, in order to take advantage of BIM more realistic, the real image of actual construction status and 4D object of planned schedule in a data date should be compared in a screen simultaneously. Those methodologies and developed system are verified in a case project where a web camera is installed for the verification of the system.
건설프로젝트의 성공은 프로젝트 관리자로서의 발주자의 참여가 중요하다. 그 이유는 일반적으로 프로젝트의 성공을 공기단축, 비용절감 등으로 측정하지만, 기존 성공을 측정하는 방법으로는 발주자의 역할을 고려하지 않고 있기 때문이다. 따라서 본 연구는 프로젝트 관리자로서 발주자를 위한 사업수행평가서를 개발하기 위해 통해 총 9개의 프로젝트 CSF와 27개의 sub-CSF를 도출하였다. 도출된 CSFs의 중요도를 평가하기 위해 AHP 기법을 활용하였으며, 기존 존재하던 PDRI 방법을 활용한 사업수행평가서를 개발하였다. 사업수행평가서를 활용하면 각 CSFs에 대한 초기 목표값을 설정하고 프로젝트 완료 후 평가 결과의 비교를 통해 프로젝트를 효과적으로 관리하고 평가할 수 있다. 평가결과를 실무적으로 활용하기 위한 솔루션 맵을 제시하고 활용 가능한 솔루션 툴을 제안한다. 추후 연구에는 실질적인 검증을 위해 다양한 프로젝트 사례를 추가할 뿐만 아니라 평가를 통해 현장에 적용 가능한 솔루션 툴을 지속적으로 개발해야한다.
The 6th International Conference on Construction Engineering and Project Management
/
pp.463-467
/
2015
Mega-shock means a sporadic event such as the earning shock, which occurred by sudden market changes, and it can cause serious problems of profit loss of international construction projects. Therefore, the early response and prevention by analyzing and predicting the Mega-shock is critical for successful project delivery. This research is preliminary study to develop a prediction model that supports market condition analysis and Mega-shock forecasting. To avoid disadvantages of classic statistical approaches that assume the market factors are linear and independent and thus have limitations to explain complex interrelationship among a range of international market factors, the research team explored the Fractal Theory that can explain self-similarity and recursiveness of construction market changes. The research first found out correlation of the major market factors by statistically analyzing time-series data. The research then conducted a base of the Fractal analysis to distinguish features of fractal from data. The outcome will have potential to contribute to building up a foundation of the early shock warning system for the strategic international project management.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.