• Title/Summary/Keyword: NPV Analysis

Search Result 286, Processing Time 0.035 seconds

REAL OPTIONS VALUATION MODEL OF LINE EXPANSION PROBLEM IN THE AMOLED INDUSTRY LINE EXPANSION (리얼옵션을 활용한 AMOLED산업 라인 증설의 옵션가치)

  • Lee, Su-Jeong;Kim, Do-Hun
    • 한국경영정보학회:학술대회논문집
    • /
    • 2008.06a
    • /
    • pp.957-962
    • /
    • 2008
  • We propose a model for the line expansion problem in the AMOLED (Active Matrix Organic Light Emitting Diodes) industry, which now faces market uncertainty: for example, changing customer needs, technological development path, etc. We focus on the optimal investment time and size of the AMOLED production lines. In particular, employed here is the ROV (Real Options Valuation) model to show how to capture the value of line expansion and to determine the optimal investment time. The ROV framework provides a systematic procedure to quantify an expected outcome of a flexible decision which is not possible in the frame of the traditional NPV (Net Present Value) approach. Furthermore, we also use Monte Carlo simulation to measure the uncertainty associated with the line expansion decision; Monte Carlo simulation estimates the volatility of a decision alternative. Lastly, we present a scenario planning to be conducted for what-if analysis of the ROV model.

  • PDF

An Economic Feasibility Analysis of the HAPS Services in Korea

  • Ahn, Jae-Kyung;Kim, Jong-Hwa;Lee, Deok-Joo;Ahn, Do-Seob;Ku, Bon-Jun
    • Satellite Communications and Space Industry
    • /
    • v.13 no.1 s.28
    • /
    • pp.118-124
    • /
    • 2006
  • HAPS(High Altitude Platform Station) which is defined as a station located on an object at an altitude of 20 to 50 km and at a specified, nominal, fixed point relative to the earth is promising technology capable of providing broadband multimedia services. In this study, economical aspects of HAPS service are analyzed by estimating the revenue and costs incurred by the service. To evaluate the profitability of HAPS service, the number of subscribers is estimated and then the net present value (NPV), payback period, and the rate of return on investment (ROI) are calculated under various scenarios

  • PDF

Economic Analyses on the Satellite/WLAN broadband internet Services (위성/무선통신 연동시스템 서비스 경제성 분석)

  • An Jae-Gyeong;Song Mi-Ja
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.05a
    • /
    • pp.1771-1776
    • /
    • 2006
  • 인터넷을 기반으로 하는 IT의 눈부신 발전과 더불어 언제, 어디서나, 시간과 장소에 구애받지 않고 인터넷을 사용할 수 있도록 하는 사회적 요구가 구체화 되고 있다. 이러한 요구에 부응하고자 국내에서는 200km 이상의 빠른 속도로 이동 중에 있더라도 초고속인터넷이나 방송 서비스를 제공할 수 있는 위성/무선통신 연동 초고속인터넷 시스템기술을 개발하고 있다. 본 연구에서는 위와 같이 개발된 연동시스템을 국내 고속철도(KTX)에 적용하여 서비스를 제공할 때, 관련 시설투자에 대한 경제적 타당성을 검토하고자 한다. 경제성 분석을 위해 현재 유럽에서 이미 제공되고 있는 고속철도 인터넷 서비스를 조사하였고, 국내 고속철의 특성을 감안하여 필요시설과 장비의 항목별 비용분석을 수행하였다. 해외 사례와 비행기 등의 다른 운송수단에서 예상되는 수요 및 요금 수준에 근거하여 고속철도 인터넷서비스 매출을 시나리오별로 산정하였으며, 각각에 대한 순현재가와 수익률을 도출하였다. 본 연구의 결과를 토대로 하여 위성/무선통신 연동 시스템 기술 개발에 대한 경제적 타당성을 도출할 수 있으며, 서비스 제공 시 마케팅자료로 활용할 수 있을 것이다.

  • PDF

Technical and Financial evaluation for mineral project (광물자원 프로젝트의 기술성 및 경제성 평가 기법)

  • Cho, Seong-Jun
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2009.05a
    • /
    • pp.101-118
    • /
    • 2009
  • In order to invest in overseas mineral projects, it is necessary to have a ability of technical and financial evaluation. Reserve estimation is the most important for mineral appraisal. Geostatistical evaluation of tonnage and grade promises more accurate reserve estimation than traditional methods such as polygon, inverse distance method and so on even if it has some uncertainty. Selection of a mining method and a mineral processing is also important because capex and opcosts of a mineral project is due to the selection. Mineral project is usually evaluated financially using NPV and IRR which are calculated through DCF(Discount Cash Flow). Uncertainty of a mineral project is analyzed statistically using sensitivity analysis and montecarlo simulation.

  • PDF

Methodology of Valuing Economics of Offshore Wind Power System Using Learning Curve Model (학습곡선모형을 이용한 해상풍력발전의 경제성평가 기법)

  • Park, Min-Hyug;Lee, Jae-Gul;Kim, Jung-Ju
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.11a
    • /
    • pp.353-356
    • /
    • 2007
  • 환경규제 강화와 화석연료에 대한 대안으로 신/재생에너지에 대한 관심이 고조 되고 있다. 그 중 하나인 풍력발전은 각국마다 풍황 조건과 정책에 의해 다양한 시장을 만들어 내고 있다. 본 연구는 해상풍력발전시스템의 투자 전망에 대하여 기존의 재무적 평가기법에 학습곡선효과를 가미하는 방법론을 제시하고자 하였다. NPV 등의 가치 평가기법이 할인된 현금흐름 분석을 하는 것이라면 이에 더하여 현금의 유출에 있어서 학습율을 반영한 원가를 반영하는 것이 제시하고자 하는 연구 방법론의 핵심이다. 해상풍력발전을 투자자 입장에서 모의 해본 결과 국내 풍력발전은 80% 학습율 수준 정도의 혁신적 개선 없이는 투자 타당성을 찾기 어려우며 이러한 현실적인 문제점을 정책적으로 보완해야 할 수 있는 것이 발전가격을 중심으로 하는 정부의 지원제도임을 제시 하였다.

  • PDF

The Feasibility Analysis of 9.9 MW Biomass Cogeneration System (9.9MW급 바이오매스 열병합발전 타당성 연구)

  • Choi, Jaiyoung;Shul, Yonggun
    • New & Renewable Energy
    • /
    • v.10 no.2
    • /
    • pp.40-47
    • /
    • 2014
  • This study is intended to analyze the appropriate scope for 9.9MW biomass cogeneration, feasibility and sensitivity according to changing market situation. In the study, the heat load is classified into three types to predict heat sales and find out the appropriate scope of thermal business that is operated in CHP 34.42 Gcal/h, PLBwg 70 Gcal/h of cogeneration. the feasibility is estimated based on internal rate of return (IRR) and net present value(NPV). the sensitivity is analyzed in terms of biomass fuel cost, unit price of heating cost, investment cost, SMP unit price and REC unit price.

A Model on Economy Evaluation Regarding to Cash Flow Pattern (현금흐름 패턴을 고려한 경제성 평가모델)

  • Kang, Sung-Soo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.31 no.4
    • /
    • pp.177-187
    • /
    • 2008
  • It is very important to select optimal investment alternative. The common method of economic evaluation is to compare of NPV, FW, AE by MARR, or the rate of return for the cash flow of alternatives. This method is undergoing by assumption that cash flow can be always evaluated by MARR, but the cash flow is not always increased or discounted like MARR. So this paper suggests a model on an economic analysis and evaluation regarding to various cash pattern, that is helpful for the person in the field to use easily.

Try to Use a New Valuation Approach: Application of the Real Options Pricing Method to an Aerospace Project (항공우주 거대산업 프로젝트의 가치평가에 대한 소고 - 실물옵션 가치평가법의 적용을 중심으로)

  • 최수미
    • Proceedings of the Korea Technology Innovation Society Conference
    • /
    • 2002.05b
    • /
    • pp.181-198
    • /
    • 2002
  • This article describes a methodology for evaluating huge aerospace R&D investments using the real options pricing method. Option pricing has been proposed as a useful approach for modeling investment in R&D. Two important features of R&D investments are that an R&D project takes time to complete and that the outcome of R&D investments is highly uncertain. This makes the analysis of R&D investments difficult. Traditional tools for project evaluation, like IRR or the NPV, are inadequate for coping with the high uncertainty. Hence, In this article I propose a log-transformed binomal lattice method, and it will show that option pricing might be an adequate framework for evaluating such types of aerospace investments.

  • PDF

Small stream Flood safety Economic Analysis with Consideration of Investment Efficiency (투자 효율을 고려한 소하천 치수 경제성 분석)

  • Lee, Seong hyun;Jun, Kye Won;Jung, Jung Tae;Kim, Do Hoon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2017.05a
    • /
    • pp.169-169
    • /
    • 2017
  • 수자원의 관리적인 측면에서 하천에서 발생하는 재해로부터 자유롭기 위해 치수는 매우 중요하다. 특히 치수사업은 투자를 통해 주어진 제원을 알맞게 분배하고 사업의 타당성과 우선순위를 정하는 객관적인 기준이 필요하다. 이를 위해 본 연구에서는 소하천 치수사업을 진행함에 있어 투자효율을 고려하여 치수 경제성 분석을 방법을 제시하고 연구를 수행하였다. 대상지역은 강원도 고성군에 위치한 홍수범람지구 7개 소하천으로 선정하였다. 치수사업에 따른 직접 편익을 계산하기 위해 홍수빈도와 피해액의 관계를 결정하였으며 이를 토대로 유량규모별 피해액을 산정하고 치수시설의 완성 및 유지관리에 필요한 비용을 산정하여 총 사업비를 구체화 시켰다. 경제성 평가기준인 총비용과 그 투자에 대한 총 편익을 비교하기위해 순현가(NPV), 편익/비용비(B/C), 내부수익율(IRR)의 세 가지 기법을 이용하였으며 동일치수사업에 대해서는 B/C비기준에 의한 평가로 경제성 평가를 실시하였다. 그 결과, 연구 구간의 계획 규모를 50년으로 선정하였다.

  • PDF

Fishermen's Perception and Economic Feasibility of Inland Waters Ranching Project : Focusing on the Branches of Geum River (내수면목장화사업의 어업인 인식도 및 경제효과 : 금강 지천을 중심으로)

  • Hwang, Jin-Wook
    • The Journal of Fisheries Business Administration
    • /
    • v.53 no.2
    • /
    • pp.1-20
    • /
    • 2022
  • This study is aimed to analyze fishermen's perception and the economic feasibility of inland waters ranching project on the branches of Geum River. Analysis of fishermen's perception on the branches of Geum River showed that fishermen had an affirmative response on the inland freshwater ranching project related issues such as fisheries resources enhancement, necessity of project, economic achievement as so on. The model of inland waters ranching project on the branches of Geum River is designed to fisheries resources enhancement, habitat compositiom, ecology tours, use and management of resources. The results of the economic feasibility of inland waters ranching project on the branches of Geum River were internal rate of return (IRR) was 18.43%, a benefit-cost ratio was shown to be 1.54, net present value (NPV) was 4,929 thousand won, which indicates the economic feasibility of inland waters ranching project.