• Title/Summary/Keyword: NATM터널

Search Result 242, Processing Time 0.03 seconds

A Case Study on Construction of a Tunnel Excavated in Silty Ground by the NATM (실트질 지반에 굴착된 NATM 터널의 시공사례 연구)

  • 박종호;윤효석;박종인;이원규
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.10a
    • /
    • pp.139-146
    • /
    • 1999
  • Geological and geotechnical surveys, in general, should precede the excavation to ensure the stability of the tunnel md should be followed up according to the various geological condition during the excavation. However actually the standard support patterns which were decided during the design phases used be insisted for the whole excavation phases in spite of the various geological conditions. When $\bigcirc$$\bigcirc$ tunnel was excavated up to 25m long, the severe displacement was generated in the Portal area of $\bigcirc$$\bigcirc$ tunnel and the tunnel face was pally collapsed. Therefore, this paper present the case study on construction associated with the Umbrella Arch Method used in silty ground by the NATM.

  • PDF

Stress-Pore Pressure Coupled Finite Element Modeling of NATM Tunneling (NATM 터널의 응력-간극수압 연계 유한요소모델링)

  • Yoo, Chung-Sik;Kim, Sun-Bin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.189-198
    • /
    • 2006
  • This paper concerns the finite element (FE) modeling approach for NATM tunneling in water bearing ground within the framework of stress-pore pressure coupled analysis. Fundamental interaction mechanism of ground and groundwater lowering was first examined and a number of influencing factors on the results of coupled FE analysis were identified. A parametric study was then conducted on the influencing factors such as soil-water characteristics, location of hydraulic boundary conditions, the way of modeling drainage flow, among others. The results indicate that the soil-water characteristics plays the most important role in the tunneling-induced settlement characteristics. Based on the results, modeling guidelines were suggested for stress-pore prssure coupled finite element modeling of NATM tunneling.

  • PDF

A Study on the Proper Transfer Distance for Minimizing Air Flotation Loss of Backfilling Material of NATM Composite lining Tunnel in the Model Test (충진 모형실험을 통한 NATM Composite 라이닝 터널 뒤채움재의 기포손실 최소화를 위한 적정 이송거리 고찰)

  • Ma, Sang-Joon;Choi, Hee-Sup;Lee, Heung-Soo;Kim, Kyung-Duk
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1555-1558
    • /
    • 2008
  • In this paper, result of whole test, When the Transfer Distance is increasing, Strength of Backfilling Material of NATM Composite lining Tunnel due to increasing Gravity was increased, but that is higher the Air Flotation than increasing Strength. So, That was predicted a drop of Permeability. And Performing the placing Lightweight Foamed Mortar, we think that it's performance in drain material was lost. Therefore We conclude that Proper Transfer Distance that taking Permeability through minimizing of Air Flotation Loss and getting the Need Strength is 50m.

  • PDF

Experimental Study Of Shotcrete Containing Mineral Admixture (광물질 혼화재를 혼입한 숏크리트의 실험적 연구)

  • Kim, S.S.;Jung, H.S.;Park, K.P.;Lee, J.B.;Lee, Y.G.;Jun, H.S.
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.633-636
    • /
    • 2008
  • In order to efficient use of land and development of human, a lot of research on the utilization of underground space is being progress. For the smooth flow of traffic, in the case of mountainous terrain like our country, construction of the tunnel is rapidly increasing. The NATM method is used mainly in the domestic. And also, a lot of research for the NATM is underway, but aspects of the material are lacking. In this study, therefore, it is to evaluate the properties of durability according to mixing ratio and a kind of mineral admixture for the development of shotcrete performance by using the MATM.

  • PDF

A Study on Load Bearing Capacity of Composite Member with Steel Rib and Shotcrete in NATM Tunnel (NATM 터널에서 강지보와 숏크리트 합성부재의 하중지지력에 관한 연구)

  • Moon, Sang Hwa;Shin, Young Wan;Kim, Seung Hwan;Yoo, Han Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5C
    • /
    • pp.221-229
    • /
    • 2012
  • Steel ribs such as H-beam or lattice girder are often reinforced to secure the stability of NATM tunnel when the ground is in the bad condition. When designing, however, steel ribs are not often taken into consideration on the numerical analysis when they are regarded as temporary tunnel supports until shotcrete shows its best performance or if they are, there are various modeling methods. This study shows behavior and loading capacity of steel ribs and shotcrete through the strength test on the bending, pressure and full-scaled. Also, we conducted and analyzed the experiment of composite member consisting of shotcrete and steel ribs under the same condition. Through the result, we can find the fact that shotcrete and steel ribs do not work as one unit because of slipping on the boundary. Also, when numerical analyzing, it was concluded that steel ribs cover all bending moment and shotcrete and steel ribs share with axial force according to the compressive strength.

Productivity Improvement by Application of Simulation based Tunneling Operation Planning Model - focused on NATM - (시뮬레이션 기반 터널공사계획모델 개발을 통한 생산성 향상 연구 - NATM 공법을 대상으로 -)

  • Lee, Si-Wook;Woo, Sung-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.127-136
    • /
    • 2008
  • The initial step in the construction process, estimating appropriate construction time and expense is the most important factor that would influence the result of the construction. In order to enhance productivity and efficiency, there is a need to analyze and manage rationally. The purpose of this project is to make a simulation model for all subway tunnel construction based on the NATM method, also give an support equipment that would make available to plan and analyze the construction. The development of simulation model is based on a real case construction analysis process and also on the reference data. It reflects restrictive elements, make it possible to modify the conditions, and not only adapt to our project's construction but other projects as well. The model developed by this project will be able to reasonably predict the construction completion time and support the process of decision making during the planning. Therefore we can expect the productivity and efficiency of the whole construction projects.

A study of tunnel concrete lining design using the ground-lining interaction model with the interface element (계면요소를 이용한 지반-라이닝 상호작용 모델에 의한 터널 콘크리트 라이닝 연구)

  • Huh, Do-hak;Moon, Hyun-Koo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.6
    • /
    • pp.575-586
    • /
    • 2015
  • In NATM tunnel, the Ground-Lining Interaction model(GLI model) had been proposed a one of the numerical analysis as the ground load estimation method of the concrete lining. But this model was not applied with the interface mechanism between the ground and the support member or concrete lining. Therefor in this study, it is implemented as a model for closer than actual states that the interface element applied to the existing GLI model. And the modified GLI formula is proposed with the ground load estimation that is from the numerical results for each ground and rock cover conditions. Based on the numerical results, the ground load acting on concrete lining is reduced to ave. 88~106% in case of IV ground condition and ave. 47~57% in case of weathered soil condition comparing with the existing GLI model. It can be anticipated that the results obtained from this study can be applied to an estimation of the ground load on the concrete lining modeled like as real states, consistent and economical design.

터널의 라이닝 기계 설비

  • 김성구
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.5 no.4
    • /
    • pp.6-17
    • /
    • 2003
  • 라이닝과 굴착작업은 통상적으로 병행작업이 되며, 라이닝은 시공속도가 빠르기 때문에 공기는 주로 굴착 속도에 지배된다. 그러나 소단면/원형단면 터널에서는 작업 공간확보문제 등 제반조건에 따라 굴착과 라이닝 작업이 분리되어 라이닝 공정이 전체 공기에 커다란 영향을 끼치는 경우도 있다. 라이닝 콘크리트의 타설시기는 계측에 의해 원지반의 변위가 수렴된 것을 확인한 후 하는 것이 원칙이다. 따라서 NATM 에서는 전단면 라이닝이 일반적이다. 본 고에서는 라이닝 설비로서 사용되는 타설설비, 운반설비, 형틀설비의 총 3편으로 나누어 라이닝 기계에 대하여 설명하도록 한다.

  • PDF

Convergence-confinement method of a tunnel with the consideration of seepage forces (침투력을 고려한 터널의 내공변위 제어 미케니즘)

  • Lee, In-Mo;Yoo, Seung-Youl;Nam, Seok-Woo;Shin, Young-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.3
    • /
    • pp.187-195
    • /
    • 2005
  • When a tunnel is excavated below groundwater table, the groundwater flow occurs towards the tunnel resulting in the seepage pressure. In this paper, the effect of groundwater flows on the behavior of shotcrete lining installed between ground-liner interfaces was studied considering permeability ratio between the ground and the shotcrete into account. Three-dimensional coupled finite element analysis was performed for this assessment. Seepage forces will seriously affect the shotcrete behavior since arching phenomena do not occur in seepage forces. A parametric study was conducted on the various tunnelling situations including interfacial properties between ground and shotcrete lining, the shape of tunnel cross-section and the thickness of liner, etc. Moreover, the convergence-confinement method (CCM) of a NATM tunnel considering seepage forces was proposed. The result showed that the more water tight is the shotcrete, the smaller is the convergence and the larger is the internal pressure. Therefore, the watertight fiber-reinforced shotcrete is found to be even more advantageous when used in under water tunnel.

  • PDF

Numerical analysis on the general requirement of permanently unsupported tunnels (영구 무지보 터널의 일반적인 조건에 관한 수치해석적 연구)

  • Yoon, Ji-Sun;Ryu, Ju-Yeol
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.5 no.2
    • /
    • pp.209-216
    • /
    • 2003
  • The present with in this country, rock bolt installation, shotcrete, and concrete lining in construction order has become accepted as a general tunnelling method in NATM. On the other hand Unlined tunnelling method, which was developed by many countries near Scandinavian Peninsula with hard rocks comparatively, has recently been introduced all over the world, and numerous studies about that have been being devoted to domestic tunnels. Unlined tunnelling method has been developed on the basis of the permanently unsupported openings, and general 7 requirements for them were suggested by Nick Barton. There are no case record about these conditions for Q-system in this country. Therefore, input parameters for Q-system under these conditions were applied to general road tunnel cross-section and numerical analyses for each condition were executed with UDEC-BB, Distinct Element Method.

  • PDF