• 제목/요약/키워드: Multistage-based scheduling

검색결과 6건 처리시간 0.017초

세부공정으로 구성된 LCD 모듈 라인의 다중스테이지 메타휴리스틱 스케줄링 알고리즘 연구 (A Multistage Metaheuristic Scheduling Algorithm in LCD Module Lines Composed of Processes)

  • 서정대
    • 대한산업공학회지
    • /
    • 제38권4호
    • /
    • pp.262-275
    • /
    • 2012
  • This paper develops a multistage scheduling algorithm for the module operation of the LCD(Liquid Crystal Display) production systems and tests the efficiency of the proposed algorithm. The module operation is a multistage form composed of multiple sub operations of processes, and each stage is consists of multiple lines with the same kinds of machines. This paper presents a mathematical modeling reflecting the constraints of the LCD module operation and develops a multistage scheduling algorithm based on tabu search metaheuristic approach. For this purpose, an production order is assigned to a line of the sub operations and a sequence of the assigned order is rearranged to draw an efficient schedule. Simulation experiments test performance measures and show the efficiency of the proposed algorithm.

FMS환경에서 다단계 일정계획문제를 위한 적응형혼합유전 알고리즘 접근법 (Adaptive Hybrid Genetic Algorithm Approach to Multistage-based Scheduling Problem in FMS Environment)

  • 윤영수;김관우
    • 지능정보연구
    • /
    • 제13권3호
    • /
    • pp.63-82
    • /
    • 2007
  • 본 논문에서는 유연제조시스템(FMS)에서 다단계스케줄링 문제를 효율적으로 해결하기 위한 적응형 혼합유전 알고리즘(ahGA) 접근법을 제안한다. 제안된 ahGA는 FMS의 해를 개선시키기 위하여 이웃탐색기법을 사용하며, 유전탐색과정에서의 수행도를 향상시키기 위해 유전알고리즘(GA)의 파라메터들을 조정하기 위한 적응형 구조를 사용한다. 수치실험에서는 제안된 ahGA와 기존의 알고리즘들 간의 수행도를 비교하기 위하여 두가지형태의 다단계스케줄링문제를 제시한다. 실험결과는 제안된 ahGA가 기존의 알고리즘들 보나 더 뛰어난 수행도를 보여주고 있다.

  • PDF

종속적(從屬的)인 준비시간을 갖는 다단계공정(多段階工程)에서의 그룹스케듈링 해법(解法) (Multi-Stage Group Scheduling with Dependent Setup Time)

  • 송영우;노인규;김만식
    • 대한산업공학회지
    • /
    • 제11권2호
    • /
    • pp.75-85
    • /
    • 1985
  • The application of GT results in the mass production effect to multi-product, small lot-sized production. Group scheduling, which is operations scheduling based on the GT concept, is analyzed in a multistage manufacturing system. But the research has been limited in independent setup time models. A heuristic algorithm has been developed to minimize the mean flow time when setup times are dependent to sequence of group in multistage. For evaluation of the heuristic algorithm, the solution of heuristic algorithm is compared with that of random scheduling. The result of comparison indicates that the proposed heuristic algorithm provides good solutions with relatively fewer computational effort.

  • PDF

비선형 연속계를 위한 다단계 시간최적 제어기 (Time-Optimal Multistage Controllers for Nonlinear Continuous Processes)

  • 윤중선
    • 한국정밀공학회지
    • /
    • 제12권6호
    • /
    • pp.128-136
    • /
    • 1995
  • The problem addressed in this paper is that of the on-line computational burden of time-optimal control laws for quick, strongly nonlinear systems like revolute robots. It will be demonstrated that a large amount of off-line computation can be substituted for most of the on-line burden in cases of time optimization with constrained inputs if differential point-to- point specifications can be relaxed to cell-to-cell transitions. These cells result from a coarse discretization of likely swaths of state space into a set of nonuniform, contiguous volumes of relatively simple shapes. The cell boundaries approximate stream surfaces of the phase fluid and surfaces of equal transit times. Once the cells have been designed, the bang- bang schedules for the inputs are determined for all likely starting cells and terminating cells. The scheduling process is completed by treating all cells into which the trajectories might unex- pectedly stray as additional starting cells. Then an efficient-to-compute control law can be based on the resulting table of optimal strategies.

  • PDF

On the Minimization of Crosstalk Conflicts in a Destination Based Modified Omega Network

  • Bhardwaj, Ved Prakash;Nitin, Nitin
    • Journal of Information Processing Systems
    • /
    • 제9권2호
    • /
    • pp.301-314
    • /
    • 2013
  • In a parallel processing system, Multi-stage Interconnection Networks (MINs) play a vital role in making the network reliable and cost effective. The MIN is an important piece of architecture for a multiprocessor system, and it has a good impact in the field of communication. Optical Multi-stage Interconnection Networks (OMINs) are the advanced version of MINs. The main problem with OMINs is crosstalk. This paper, presents the (1) Destination Based Modified Omega Network (DBMON) and the (2) Destination Based Scheduling Algorithm (DBSA). DBSA does the scheduling for a source and their corresponding destination address for messages transmission and these scheduled addresses are passed through DBMON. Furthermore, the performance of DBMON is compared with the Crosstalk-Free Modified Omega Network (CFMON). CFMON also minimizes the crosstalk in a minimum number of passes. Results show that DBMON is better than CFMON in terms of the average number of passes and execution time. DBSA can transmit all the messages in only two passes from any source to any destination, through DBMON and without crosstalk. This network is the modified form of the original omega network. Crosstalk minimization is the main objective of the proposed algorithm and proposed network.