• 제목/요약/키워드: Multiple process plans

검색결과 41건 처리시간 0.025초

네트 모델을 이용한 대체 공정 계획 생성 (Generation of Alternative Process Plan by Net Model)

  • 박지형;박면웅;강민형
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 1994년도 추계학술대회 논문집
    • /
    • pp.743-747
    • /
    • 1994
  • A process planning system that generates alternative process plans offers multiple process plans for a part, thereby provides the flexibility to cope with the changes in shop floor status. In this paper, we introduce the concept of process net as a model for the generation of alternative process plans. We also show the usefulness of process net model by implementing the developed system to generate alternative process plans for rotational parts.

  • PDF

네트 모델을 이용한 대체 공정 계획 생성 (Generation of Alternative Process Plan by Net Model)

  • 박지형;박면웅;강민형
    • 한국정밀공학회지
    • /
    • 제14권1호
    • /
    • pp.168-173
    • /
    • 1997
  • A process planning system that generates alternative process plans offers multiple process plans for a part, thereby provides the flexibility to cope with the changes in shop floor status. In this paper, we intro- duce the concept of process net as a model for the generation of alternative process plans. We also show the usefulness of process net model in generating alternative process plans by implementing the developed sys- tem to construct process net, and devising an algorithm to generate alternative process plans for rotational parts.

  • PDF

폴랴 과정 모델에 대한 단일 및 축차 종속 샘플링 계획법 (Single and Sequential Dependent Sampling Plans for the Polya Process Model)

  • 김원경
    • 대한산업공학회지
    • /
    • 제28권4호
    • /
    • pp.351-359
    • /
    • 2002
  • In this paper, stochastically dependent single and sequential acceptance sampling plans are dealt when the process follows a Polya process model. A Monte-Cairo algorithm is used to find the acceptance and rejection probabilities of a lot. The number of defectives for the test to be accepted and rejected in a probability ratio sequential test can be found by using these probabilities. The formula to measure performance of these sampling plans is developed. Type I and II error probabilities are estimated by simulation. Dependent multiple acceptance sampling plans can be derived by extending the sequential sampling procedure. In numerical examples, single and sequential sampling plans of a Polya dependent process are examined and the characteristics are compared according to the change of the dependency factor.

확률적으로 종속적인 비평형 다단계 샘플링검사법의 설계 및 평가 (Design and Estimation of Multiple Acceptance Sampling Plans for Stochastically Dependent Nonstationary Processes)

  • 김원경
    • 대한산업공학회지
    • /
    • 제25권1호
    • /
    • pp.8-20
    • /
    • 1999
  • In this paper, a design and estimation procedure for the stochastically dependent nonstationary multiple acceptance sampling plans is developed. At first, the rough-cut acceptance and rejection numbers are given as an initial solution from the corresponding sequential sampling plan. A Monte-Carlo algorithm is used to find the acceptance and rejection probabilities of a lot. The conditional probability formula for a sample path is found. The acceptance and rejection probabilities are found when a decision boundary is given. Several decision criteria and the design procedure to select optimal plans are suggested. The formula for measuring performance of these sampling plans is developed. Type I and II error probabilities are also estimated. As a special case, by setting the stage size as 1 in a dependent sampling plan, a sequential sampling plan satisfying type I and II error probabilities is more accurate and a smaller average sample number can be found. In a numerical example, a Polya dependent process is examined. The sampling performances are shown to compare the selection scheme and the effect of the change of the dependency factor.

  • PDF

Evolutionary Algorithm for Process Plan Selection with Multiple Objectives

  • MOON, Chiung;LEE, Younghae;GEN, Mitsuo
    • Industrial Engineering and Management Systems
    • /
    • 제3권2호
    • /
    • pp.116-122
    • /
    • 2004
  • This paper presents a process plan selection model with multiple objectives. The process plans for all parts should be selected under multiple objective environment as follows: (1) minimizing the sum of machine processing and material handling time of all the parts considering realistic shop factors such as production volume, processing time, machine capacity, and capacity of transfer device. (2) balancing the load between machines. A multiple objective mathematical model is proposed and an evolutionary algorithm with the adaptive recombination strategy is developed to solve the model. To illustrate the efficiency of proposed approach, numerical examples are presented. The proposed approach is found to be effective in offering a set of satisfactory Pareto solutions within a satisfactory CPU time in a multiple objective environment.

다중 공정계획을 가지는 정적/동적 유연 개별공정에 대한 의사결정 나무 기반 스케줄링 (Decision Tree based Scheduling for Static and Dynamic Flexible Job Shops with Multiple Process Plans)

  • 유재민;도형호;권용주;신정훈;김형원;남성호;이동호
    • 한국정밀공학회지
    • /
    • 제32권1호
    • /
    • pp.25-37
    • /
    • 2015
  • This paper suggests a decision tree based approach for flexible job shop scheduling with multiple process plans. The problem is to determine the operation/machine pairs and the sequence of the jobs assigned to each machine. Two decision tree based scheduling mechanisms are developed for static and dynamic flexible job shops. In the static case, all jobs are given in advance and the decision tree is used to select a priority dispatching rule to process all the jobs. Also, in the dynamic case, the jobs arrive over time and the decision tree, updated regularly, is used to select a priority rule in real-time according to a rescheduling strategy. The two decision tree based mechanisms were applied to a flexible job shop case with reconfigurable manufacturing cells and a conventional job shop, and the results are reported for various system performance measures.

Job Shop 통합 일정계획을 위한 유전 알고리즘 (A Genetic Algorithm for Integration of Process Planning and Scheduling in a Job Shop)

  • 박병주;최형림;강무홍
    • 한국경영과학회지
    • /
    • 제30권3호
    • /
    • pp.55-65
    • /
    • 2005
  • In recent manufacturing systems, most jobs may have several process plans, such as alternative sequence of operations, alternative machine etc. A few researches have addressed the necessity for the integration of process planning and scheduling function for efficient use of manufacturing resources. But the integration problem is very difficult and complex. Many prior researches considered them separately or sequentially. It introduces overlapping or partial duplications in solution efforts. In this paper, Integration problem of jobs with multiple process plans in a job shop environment Is addressed. In order to achieve an efficient integration between process planning and scheduling by taking advantage of the flexibility that alternative process plans offer, we designed GA(Genetic Algorithm)-based scheduling method. The performance of proposed GA is evaluated through comparing integrated scheduling with separated scheduling in real world company with alternative machines and sequences of operations. Also, a couple of benchmark problems are used to evaluate performance. The integrated scheduling method in this research can be effectively epplied to the real case.

Stochastically Dependent Sequential Acceptance Sampling Plans

  • Kim, Won-Kyung
    • 품질경영학회지
    • /
    • 제25권3호
    • /
    • pp.22-38
    • /
    • 1997
  • In a traditional sequential acceptance sampling plan, it is assumed that the sampled items are independent each other. In this paper, stochastically dependent sequential acceptance sampling plans are dealt when there exists dependency between sampled items. Monte-Calro algorithm is used to find the acceptance and rejection probabilities of a lot. The number of defectives for the test to be accepted and rejected in probability ratio sequential test can be found by using these probabilities. The formula for measures of performance of these sampling plans is developed. Type I and II error probabilities are estimated by simulation. This research can be a, pp.ied to sequential sampling procedures in place of control charts where there is a recognized and necessary dependency during the production processes. Also, dependent multiple acceptance sampling plans can be derived by extending this sequential sampling procedure. As a numerical example, a Markov dependent process model is given, and the characteristics of the sampling plans are examined according to the change of the dependency factor.

  • PDF

학교시설 복합화를 위한 민자사업 방식 개선 방안에 관한 연구 (A Study on the Improvement Plans of Private Sector Investment for the Mixed-Use of School Facilities)

  • 이재국;오병욱
    • 한국디지털건축인테리어학회논문집
    • /
    • 제10권1호
    • /
    • pp.31-38
    • /
    • 2010
  • The use of school should not be limited to student education any longer but be extended for attaining social benefits. For this reason, school should play central roles not only in education but also in childcare, welfare, culture, physical education, etc. In order for school to accommodate various new functions, it is essential to promote the mixed-uses of school facilities, and this process requires the involvement of private capitals for early achievement of social benefits from school facilities. Thus, this study purposed to examine the necessity of the multiple uses of school facilities through the investment of private capitals, to diagnose the adequacy of build-transfer-lease (BTL) applied currently to the multiple uses of school facilities, and to find obstacles to the activation of private sector investment and suggest solutions for the obstacles. In particular, this study aimed at proposing plans to enhance the efficiency of private sector investment and activate private sector investment projects by suggesting how to promote the multiple uses of school facilities in consideration of profitability for private investors.