In this paper, multiple ESS(Energy Storage System) control strategy for microgrids is presented. Installation of ESS becomes mandatory when microgrids are used to supply high quality power to the loads. The one of main functions of the ESS is to maintain power balance. However ESS has limitation of its capacity and instantaneous injecting power. Power allocation method based on SOC(State Of Charge) of each ESS is proposed. P-Q control is employed as the basic control strategy for the distributed ESSs. By using the proposed method, the coefficients in the conventional P-Q control method are modified. The ESSs with higher SOC inject more active power, while those with lower SOC inject less, leading to more balanced SOC levels among the ESSs. The proposed method is demonstrated by simulation using PSCAD/EMTDC.
최근 전력계통은 에너지저장장치(ESS: Energy Storage System)의 도입이 확산되고 있는데, 신재생에너지 출력완화, 송전혼잡 해소, 주파수조정, 전압변동, 에너지차익거래 등의 목적으로 사용되고 있다. 이렇듯 각 ESS는 각기 다른 목적으로 사용하고 있는데, 현재 전력계통 ESS 운영은 각 목적별 ESS를 독립적으로 사용하고 있어, ESS를 효율적으로 사용하지 못하여 설치비용 대비 경제성이 떨어지고 있는 실정이다. 본 논문은 이러한 ESS의 경제성에 관한 문제점을 해결하고자 Multiple ESS상태에서 배터리 수명 비용을 줄이고, 배터리를 효율적으로 사용할 수 있는 방법을 제안하고자 한다. 사례연구에서는 각기 다른 목적으로 사용되고 있는 ESS를 독립적으로 사용하는 경우와 배터리 수명비용을 바탕으로 전력을 분배한 경우의 비용을 분석해 보았다.
To test the effectiveness of using an energy storage system for frequency regulation, the Energy New Business Laboratory at KEPCO Research Institute installed a 4 MW energy storage system (ESS) demonstration facility at the Jocheon Substation on Jeju Island. And after the successful completion of demonstration operations, a total of 52 MW ESS for frequency regulation was installed in Seo-Anseong (28 MW, governor-free control) and in Shin-Yongin (24 MW, automatic generation control). The control system used in these two sites was based on the control system developed for the 4 MW ESS demonstration facility. KEPCO recently finished the construction of 184 MW ESS for frequency regulation in 8 locations, (e.g. Shin-Gimjae substation, Shin-Gaeryong substation, etc.) and they are currently being tested for automatic operation. KEPCO plans to construct additional ESS facilities (up to a total of about 500 MW for frequency regulation by 2017), thus, various operational tests would first have to be conducted. The high-speed characteristic of ESS can negatively impact the power system in case the 500 MW ESS is not properly operated. At this stage we need to verify how effectively the 500 MW ESS can regulate frequency. In this paper, the effect of using ESS for frequency regulation on the power system of Korea was studied. Simulations were conducted to determine the effect of using a 524 MW ESS for frequency regulation. Models of the power grid and the ESS were developed to verify the performance of the operation system and its control system. When a high capacity power plant is tripped, a 24 MW ESS supplies power automatically and 4 units of 125MW ESS supply power manually. This study only focuses on transient state analysis. It was verified that 500 MW ESS can regulate system frequency faster and more effectively than conventional power plants. Also, it was verified that time-delayed high speed operations of multiple ESS facilities do not negatively impact power system operations. It is recommended that further testing be conducted for a fleet of multiple ESSs with different capacities distributed over multiple substations (e.g. 16, 24, 28, and 48 MW ESS distributed across 20 substations) because each ESS measures frequency individually. The operation of one ESS facility will differ from the other ESSs within the fleet, and may negatively impact the performance of the others. The following are also recommended: (a) studies wherein all ESSs should be operated in automatic mode; (b) studies on the improvement of individual ESS control; and (c) studies on the reapportionment of all ESS energies within the fleet.
This paper is about the relations between the electric multiple unit and ESS(Energy Storage system, here after) applying bi-direction Buck-Boost Converter. ESS may be possible to suppress the line voltage drops and the power loading fluctuations and to save the regeneration power lapses. This paper confirm for simulation that ESS reusing regenerative power generated during braking in train. Also, presents the influence of regenerative power variation of train and catenary acceptability for energy saving obtained by applying the ESS to Daejeon Metro line 1.
Kang, Dong Oh;Choi, Sue In;Oh, Jee Youn;Sim, Jae Kyeom;Choi, Jong Hyun;Choo, Ji Yung;Hwang, Jin Wook;Lee, Seung Heon;Lee, Ju-Han;Lee, Ki Yeol;Shin, Chol;Kim, Je Hyeong
Tuberculosis and Respiratory Diseases
/
v.76
no.3
/
pp.131-135
/
2014
Low-grade endometrial stromal sarcoma (ESS) is an uncommon gynecologic malignancy of mesodermal origin. Pulmonary metastasis of low-grade ESS can occur years and decades after the treatment of the primary disease. Low-grade ESS is frequently mistaken as benign uterine neoplasm like uterine leiomyoma, which can potentially lead to a misdiagnosis. We present a case of a 42-year-old woman with low-grade ESS, that initially presented as an incidental lung mass with multiple pulmonary nodules, seven years after an uterine myomectomy. A $6.9{\times}5.8cm-sized$ intrapelvic mass suspected of uterine origin was discovered while searching for potential extrathoracic primary origin. A pelviscopy and simultaneous thoracoscopic lung biopsy were conducted for pathologic diagnosis. Finally, the diagnosis was confirmed as low-grade ESS with lung metastasis based on the histopathologic examination with immunohistochemical stain, which was showed positive for CD10 and hormone receptor markers (estrogen and progesterone receptors) in both pelvic and lung specimens.
Jong-Cheol Kim;Chun-Sung Kim;Yong-Un Park;Seong-Mi Park;Sung-Jun Park
Journal of the Korean Society of Industry Convergence
/
v.26
no.6_3
/
pp.1269-1278
/
2023
This paper presents an operational technique that can secure the stability of DC-Grid centering on MG operated based on ESS in multiple MG where three DC-based microgrid(MG) are interconnected. MG1(PV 600kWp, ESS 1.5MWh) has an 830Vdc grid voltage, MG2(PV 300kWp, ESS 1.1MWh) and MG3(PV 100kWp, ESS 500kWh) are DC-based MG with a 750Vdc grid voltage, and MG1 and MG2, 3 are linked by separate DC/DC converters (BTB). In order to keep different grid voltages stable, the power transmission capacity between MG1 and two MG(MG2, MG3) connected with an independent BTB converter was adjusted to secure the overall stability of the system, and this was verified by confirming that the surplus capacity of ESS was maintained in actual operation.
This paper presents a comprehensive scheme for assessing the importance of multiple microgrids (MGs) network that includes distributed energy resources (DERs), renewable energy systems (RESs), and energy storage system (ESS) facilities. Due to the uncertainty of severe weather, large-scale cascading failures are inevitable in energy networks. making the assessment of the structural vulnerability of the energy network an attractive research theme. This attention has led to the identification of the importance of measuring energy nodes. In multiple MG networks, the energy nodes are regarded as one MG. This paper presents a modified PageRank algorithm to assess the importance of MGs that include multiple DERs and ESS. With the importance rank order list of the multiple MG networks, the core MG (or node) of power production and consumption can be identified. Identifying such an MG is useful in preventing cascading failures by distributing the concentration on the core node, while increasing the effective link connection of the energy flow and energy trade. This scheme can be applied to identify the most profitable MG in the energy trade market so that the deployment operation of the MG connection can be decided to increase the effectiveness of energy usages. By identifying the important MG nodes in the network, it can help improve the resilience and robustness of the power grid system against large-scale cascading failures and other unexpected events. The proposed algorithm can point out which MG node is important in the MGs power grid network and thus, it could prevent the cascading failure by distributing the important MG node's role to other MG nodes.
The Transactions of The Korean Institute of Electrical Engineers
/
v.66
no.6
/
pp.885-891
/
2017
The energy storage system(ESS) is a core component for exchanging the power system structure of the unidirectional power flow into a bidirectional structure. Its important role has been increasing because it has multiple functions such as output stabilization of new renewable energy, demand management, frequency regulation, etc. However, the performance evaluation technology of ESS in korea is lower than one of advanced countries and the recognition of standardization is also lack compared to advanced countries. Furthermore, in order to more accurately and reliably validate the performance of the ESS in advanced countries, it has been required to perform not only performance testing by H/W devices but also performance verification by S/W tool. Therefore, in order to verify the performance testing of ESS by S/W tool, this paper proposes the modeling method of performance testing devices for MW scaled ESS by using the PSCAD/EMTDC S/W, based on real testing devices in domestic institute. From the simulation results of proposed modeling method, it is confirmed that the proposed modeling method is a useful tool for performance validation of ESS.
The Journal of Korean Institute of Communications and Information Sciences
/
v.28
no.12C
/
pp.1217-1224
/
2003
In this paper, we propose an edge side-lobe suppressor (ESS) for the uplink of OFDMA systems, which mitigates the interference introduced by different frequency offsets between a desired user and the other users. We evaluate the proposed ESS scheme by measuring average signal to interference ratio (SIR) and average bit error rate (BER). The simulation results confirm that the proposed ESS scheme improves system performance by approximately 5∼10 dB SIR as compared to conventional OFDMA systems. Because the additional operations for the proposed scheme can be performed by a real-valued look-up table, the implementation of the ESS hardly requires increasing transmitter and receiver complexity.
Kim, Young-Hoon;Kang, Ho;Dho, Yun-Sik;Hwang, Kihwan;Joo, Jin-Deok;Kim, Yong Hwy
Journal of Korean Neurosurgical Society
/
v.64
no.4
/
pp.619-630
/
2021
Objective : The skull base reconstruction step, which prevents cerebrospinal fluid (CSF) leakage, is one of the most challenging steps in endoscopic skull base surgery (ESS). The purpose of this study was to assess the outcomes and complications of a reconstruction technique for immediate CSF leakage repair using multiple onlay grafts following ESS. Methods : A total of 230 consecutive patients who underwent skull base reconstruction using multiple onlay grafts with fibrin sealant patch (FSP), hydroxyapatite cement (HAC), and pedicled nasoseptal flap (PNF) for high-flow CSF leakage following ESS at three institutions were enrolled. We retrospectively reviewed the medical and radiological records to analyze the preoperative features and postoperative results. Results : The diagnoses included craniopharyngioma (46.8%), meningioma (34.0%), pituitary adenoma (5.3%), chordoma (1.6%), Rathke's cleft cyst (1.1%) and others (n=21, 11.2%). The trans-planum/tuberculum approach (94.3%) was the most commonly adapted surgical method, followed by the trans-sellar and transclival approaches. The third ventricle was opened in 78 patients (41.5%). Lumbar CSF drainage was not performed postoperatively in any of the patients. Postoperative CSF leakage occurred in four patients (1.7%) due to technical mistakes and were repaired with the same technique. However, postoperative meningitis occurred in 13.5% (n=31) of the patients, but no microorganisms were identified. The median latency to the diagnosis of meningitis was 8 days (range, 2-38). CSF leakage was the unique risk factor for postoperative meningitis (p<0.001). Conclusion : The use of multiple onlay grafts with FSP, HAC, and PNF is a reliable reconstruction technique that provides immediate and complete CSF leakage repair and mucosal grafting on the skull base without the need to harvest autologous tissue or perform postoperative CSF diversion. However, postoperative meningitis should be monitored carefully.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.