• Title/Summary/Keyword: Multiple Connection

Search Result 467, Processing Time 0.035 seconds

Hydrodynamic interactions and coupled dynamics between a container ship and multiple mobile harbors

  • Kang, H.Y.;Kim, M.H.
    • Ocean Systems Engineering
    • /
    • v.2 no.3
    • /
    • pp.217-228
    • /
    • 2012
  • As the size of container ships continues to increase, not many existing harbors can host the super-container ship due to its increased draft and the corresponding dredging requires huge budget. In addition, the minimization of waiting and loading/offloading time is the most important factor in harbor competitiveness. In this regard, mobile-harbor concept has been developed in Korea to achieve much improved harbor capacity and efficiency. In developing the concept, one of the most important elements is the operability of crane between two or more floating bodies in side-by-side arrangement. The container ship is to be stationed through a hawser connection to an outside-harbor fixed-pile station with the depth allowing its large draft. The mobile harbors with smart cranes are berthed to the sides of its hull for loading/offloading containers and transportation. For successful operation, the relative motions between the two or more floating bodies with hawser/fender connections have to be within allowable range. Therefore, the reliable prediction of the relative motions of the multiple floating bodies with realistic mooring system is essential to find the best hull particulars, hawser/mooring/fender arrangement, and crane/docking-station design. Time-domain multi-hull-mooring coupled dynamic analysis program is used to assess the hydrodynamic interactions among the multiple floating bodies and the global performance of the system. Both collinear and non-collinear wind-wave-current environments are applied to the system. It is found that the non-collinear case can equally be functional in dynamics view compared to the collinear case but undesirable phenomena associated with vessel responses and hawser tensions can also happen at certain conditions, so more care needs to be taken.

Multiple Path Security-Aware Routing Protocol Mechanism for Ad Hoc Network (Ad Hoc 네트워크 라우팅 보안을 위한 다중경로 기반의 MP-SAR 프로토콜)

  • Han, In-Sung;Ryou, Hwang-Bin
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.33 no.5B
    • /
    • pp.260-267
    • /
    • 2008
  • As pervious the SAR(Security Aware Routing)[10] protocol is an secure Ad Hoc network protocol that finds a secure path, it is the security routing protocol that uses the security level of nodes as the routing information. However, the SAR protocol sometimes transfers data through inefficient transmission paths because it always tries to find secure nodes for a safe transmission. Since it is a protocol based on AODV[6], it will cause transmission delay as researching of security routing path. when a node is out of the data transmission range as its battery dying or movement. Although it is possible to connection of nodes because a characteristic of the SAR protocol, the connection is not easy to reconnect when the security level of intermediate node is lower than the level requested by a source node. In this paper, we suggest the MP-SAR based on the SAR to solve the SAR protocol's problem. The MP-SAR seeks multiple secure path for maintenance of data confidentiality using the expanded secure path detection techniques based on the SAR. It can transfer data quickly and reliably by using the shortest efficient path among multiple paths. In the research result, we proved a outstanding performance of MP-SAR than the previous SAR through comparison and analysis.

Analysis of the Optimal Separation Distance between Multiple Thermal Energy Storage (TES) Caverns Based on Probabilistic Analysis (확률론적 해석에 기반한 다중 열저장공동의 적정 이격거리 분석)

  • Park, Dohyun;Kim, Hyunwoo;Park, Jung-Wook;Park, Eui-Seob;Sunwoo, Choon
    • Tunnel and Underground Space
    • /
    • v.24 no.2
    • /
    • pp.155-165
    • /
    • 2014
  • Multiple thermal energy storage (TES) caverns can be used for storing thermal energy on a large scale and for a high-aspect-ratio heat storage design to provide good thermal performance. It may also be necessary to consider the use of multiple caverns with a reduced length when a single, long tunnel-shaped cavern is not suitable for connection to aboveground heat production and injection equipments. When using multiple TES caverns, the separation distance between the caverns is one of the significant factors that should be considered in the design of storage space, and the optimal separation distance should be determined based on a quantitative stability criterion. In this paper, we described a numerical approach for determining the optimal separation distance between multiple caverns for large-scale TES utilization. For reliable stability evaluation of multiple caverns, we employed a probabilistic method which can quantitatively take into account the uncertainty of input parameters by probability distributions, unlike conventional deterministic approaches. The present approach was applied to the design of a conceptual TES model to store hot water for district heating. The probabilistic stability results of this application demonstrated that the approach in our work can be effectively used as a decision-making tool to determine the optimal separation distance between multiple caverns. In addition, the probabilistic results were compared to those obtained through a deterministic analysis, and the comparison results suggested that care should taken in selecting the acceptable level of stability when using deterministic approaches.

Performance Analysis of ISDN AO/DI Scheme with Multiople ON-OFF sources (다중 ON-OFF 소스에 대한 ISDN AO/DI 기능의 성능분석)

    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.24 no.10B
    • /
    • pp.1861-1866
    • /
    • 1999
  • ISDN provides mB+1D channel to users. An AO/D1 scheme means D-channel can be used for a permanent low speed connection. When user needs more bandwidth for high speed transfer, the AO/D1 scheme automatically provide greater capacity in the shape of ISDN B-channels. In this paper, we analyze the performance of the AO/D1 scheme with multiple ON-OFF sources in ISDN. We consider multiple ON-OFF sources connected through mB+1D ISDN link. Without the AO/D1 scheme, the required bandwidth will be the sum of peak bandwidth of all sources. With the implementation of the AO/D1 scheme, the required bandwidth is reduced to what is really needed.

  • PDF

Heat Demand Forecasting for Local District Heating (지역 난방을 위한 열 수요예측)

  • Song, Ki-Burm;Park, Jin-Soo;Kim, Yun-Bae;Jung, Chul-Woo;Park, Chan-Min
    • IE interfaces
    • /
    • v.24 no.4
    • /
    • pp.373-378
    • /
    • 2011
  • High level of accuracy in forecasting heat demand of each district is required for operating and managing the district heating efficiently. Heat demand has a close connection with the demands of the previous days and the temperature, general demand forecasting methods may be used forecast. However, there are some exceptional situations to apply general methods such as the exceptional low demand in weekends or vacation period. We introduce a new method to forecast the heat demand to overcome these situations, using the linearities between the demand and some other factors. Our method uses the temperature and the past 7 days' demands as the factors which determine the future demand. The model consists of daily and hourly models which are multiple linear regression models. Appling these two models to historical data, we confirmed that our method can forecast the heat demand correctly with reasonable errors.

Integer Programming Approach to Line Optimization of Multiple Surface Mounters (정수계획법에 의한 다수 표면실장기의 라인 최적화)

  • Kim Kyung-Min;Park Tae-Hyoung
    • The Journal of the Korea Contents Association
    • /
    • v.6 no.4
    • /
    • pp.46-54
    • /
    • 2006
  • We propose an optimization method for PCB assembly lines including multiple surface mounters. To increase the productivity of PCB assembly line, the component allocation, feeder assignment, and assembly sequence of each surface mounter should be optimized. The optimization Problem is formulated as an integer programming problem. We divide the overall problem into two hierarchical sub-problems: forward-path problem and backward-path problem. The clustering algorithm and branch-and-bound algorithm are applied to solve the forward-path problem. The assignment algorithm and connection algorithm are applied to solve the backward-path problem. Simulation results are presented to verify the usefulness of the proposed method.

  • PDF

Design of Robust Face Recognition System to Pose Variations Based on Pose Estimation : The Comparative Study on the Recognition Performance Using PCA and RBFNNs (포즈 추정 기반 포즈변화에 강인한 얼굴인식 시스템 설계 : PCA와 RBFNNs 패턴분류기를 이용한 인식성능 비교연구)

  • Ko, Jun-Hyun;Kim, Jin-Yul;Oh, Sung-Kwun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.9
    • /
    • pp.1347-1355
    • /
    • 2015
  • In this study, we compare the recognition performance using PCA and RBFNNs for introducing robust face recognition system to pose variations based on pose estimation. proposed face recognition system uses Honda/UCSD database for comparing recognition performance. Honda/UCSD database consists of 20 people, with 5 poses per person for a total of 500 face images. Extracted image consists of 5 poses using Multiple-Space PCA and each pose is performed by using (2D)2PCA for performing pose classification. Linear polynomial function is used as connection weight of RBFNNs Pattern Classifier and parameter coefficient is set by using Particle Swarm Optimization for model optimization. Proposed (2D)2PCA-based face pose classification performs recognition performance with PCA, (2D)2PCA and RBFNNs.

Time-Efficient Event Processing Using Provisioning-to-Signaling Method in Data Transport Systems Requiring Multiple Processors

  • Kim, Bup-Joong;Ryoo, Jeong-dong;Cho, Kyoungrok
    • ETRI Journal
    • /
    • v.39 no.1
    • /
    • pp.41-50
    • /
    • 2017
  • In connection-oriented data transport services, data loss can occur when a service experiences a problem in its end-to-end path. To resolve the problem promptly, the data transport systems providing the service must quickly modify their internal configurations, which are distributed among different locations within each system. The configurations are modified through a series of problem (event) handling procedures, which are carried out by multiple control processors in the system. This paper proposes a provisioning-to-signaling method for inter-control-processor messaging to improve the time efficiency of event processing. This method simplifies the sharing of the runtime event, and minimizes the time variability caused by the amount of event data, which results in a decrease in the latency time and an increase in the time determinacy when processing global events. The proposed method was tested for an event that required 4,000 internal path changes, and was found to lessen the latency time of global event processing by about 50% compared with the time required for general methods to do the same; in addition, it reduced the impact of the event data on the event processing time to about 30%.

Investigation of I-V characteristics and heat generation of multiply connected HTS conductors in parallel

  • Park, H.C.;Kim, S.;Cho, J.;Sohn, M.H.
    • Progress in Superconductivity and Cryogenics
    • /
    • v.14 no.2
    • /
    • pp.20-23
    • /
    • 2012
  • With continuous development of the 2nd generation HTS conductor, the critical current of the conductor is also increasing. However, many applications require more than 2 conductors in parallel to transport large current. Applications such as HTS power cables and some HTS current leads usually need much larger transport current than that provided by a single conductor and they require more than several tens of HTS conductors. In the case of parallel connection of multiple HTS conductors, the current distribution depends on the contact resistance of each conductor at the terminals for DC operation. The non-uniform distribution of the terminal resistances results in a non-uniform distribution of the current. The resultant current non-uniformity affects on the measurement of the I-V curve and the thermal performance of the multiple conductors. This paper describes the I-V curves obtained from multiply connected HTS conductors with different terminal contact resistances to investigate the relationship between the distorted I-V curve and heat generation.

Phase Angle Control in Resonant Inverters with Pulse Phase Modulation

  • Ye, Zhongming;Jain, Praveen;Sen, Paresh
    • Journal of Power Electronics
    • /
    • v.8 no.4
    • /
    • pp.332-344
    • /
    • 2008
  • High frequency AC (HFAC) power distribution systems delivering power through a high frequency AC link with sinusoidal voltage have the advantages of simple structure and high efficiency. In a multiple module system, where multiple resonant inverters are paralleled to the high frequency AC bus through connection inductors, it is necessary for the output voltage phase angles of the inverters be controlled so that the circulating current among the inverters be minimized. However, the phase angle of the resonant inverters output voltage can not be controlled with conventional phase shift modulation or pulse width modulation. The phase angle is a function of both the phase of the gating signals and the impedance of the resonant tank. In this paper, we proposed a pulse phase modulation (PPM) concept for the resonant inverters, so that the phase angle of the output voltage can be regulated. The PPM can be used to minimize the circulating current between the resonant inverters. The mechanisms of the phase angle control and the PPM were explained. The small signal model of a PPM controlled half-bridge resonant inverter was analyzed. The concept was verified in a half bridge resonant inverter with a series-parallel resonant tank. An HFAC power distribution system with two resonant inverters connected in parallel to a 500kHz, 28V AC bus was presented to demonstrate the applicability of the concept in a high frequency power distribution system.