Optimal alternative decision technique of accommodation facility in multi-utility tunnel using VE/LCC analysis (VE/LCC 분석을 통한 공동구 수용시설물의 최적 대안 결정 기법)

  • Sim, oung-Jong;Jin, Kyu-Nam;Oh, Won-Joon;Cho, Choong-Yeun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.2
    • /
    • pp.317-329
    • /
    • 2018
  • The study on the existing multi-utility tunnel has examined the general aspects related to the installation of multi-utility tunnel rather than the optimal design and feasibility analysis of accommodation facility in multi-utility tunnel. In the basic planning stage related to the introduction of multi-utility tunnel, it is difficult to determine accommodation facility due to lack of relevant indicators and data. In this paper, VE/LCC analysis method is suggested for the optimal alternative decision of accommodation facilities in multi-utility tunnel. The analysis of the items of individual accommodation facility and the value index for LCC costs were applied to the kind alternatives, and the priorities of each kind were analyzed. In addition, the domestic multi-utility tunnel and analysis result are compared. The result of this study will be helpful to shorten the time and convenience of the user in the process of determining accommodation facility including the first designers when introducing multi-utility tunnel.

A Feasibility Study for the Multi-Utility Tunnel by City Scale (Area) (기존시가지의 규모(면적)에 따른 공동구 설치 타당성에 관한 연구)

  • Oh, Won Joon;Na, Gwi Tae;Cho, Choong yeun;Lee, Min Jae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.6
    • /
    • pp.903-911
    • /
    • 2019
  • The multi-utility tunnel is one of the essential social infrastructures, but it is difficult to establish the multi-utility tunnel due to the scale of the National Land Planning and Utilization Act (2 million square meters). In this paper, we analyze the feasibility of establishing the multi-utility tunnel in the existing city in order to activate the multi-utility tunnel installation. For the feasibility analysis, the scale was classified into four categories based on related laws, and related indicators were selected and evaluated using feasibility and economic analysis. Three kinds/four kinds of suitable multi-utility tunnel for the scale of the existing city were shown, and five kinds of multi-utility tunnel were considered suitable for the new city over 2 million square meters. The results of the overall score evaluation of the tunnel type of the existing city and the open type of the new city of 2 million square meters or more, which is the obligation to install the multi-utility tunnel, do not show much difference and suggest the validity of the installation of the multi-utility tunnel in various scale of the existing city.

Review of the installable area of multi-utility tunnel using feasibility assessment indexes (타당성 평가지표를 활용한 터널식 공동구 설치가능지역 검토)

  • Oh, Won-Joon.;Jin, Kyu-Nam.;Na, Gwi-Tae.;Cho, Choong-Yeun.;Sim, Young-Jong.
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.6
    • /
    • pp.795-810
    • /
    • 2019
  • In this paper, The study was conducted on the method to roughly determine the area and length of the multi-utility tunnel before the planning and design phase of the multi-utility tunnel construction. For this purpose, four feasibility indexes were used: traffic density, population density, disaster prevention index (number of workers), and urbanization rate, which reflect the regional characteristics. The installation criteria were set in consideration of the average value and minimum value of the feasibility indexes for the tunnel type among areas that can be installed in the multi-utility tunnel of Seoul. The analysis area included 200 areas based on 14 zones. The results of the analysis based on the minimum value of feasibility indexes indicated that the tunnel type of multi-utility tunnel is suitable for 39 areas with high traffic volume and population. On the other hand, the 'gun' area, etc., has a wider population than the 'si' and 'gu', suggesting that it is not suitable to install multi-utility tunnel. In addition, it can be seen that the larger the index value centered on the minimum value of each index, the smaller the tunnel type of multi-utility tunnel installation area.

Development of evaluation model for optimum design of multi-utility tunnel in urban area (도심지 공동구 최적 설계를 위한 평가 모델 개발)

  • Sim, Young-Jong;Jin, Kyu-Nam;Oh, Won-Joon;Cho, Choong-Yeun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.3
    • /
    • pp.437-447
    • /
    • 2017
  • In current, there has not been the evaluation model for the optimum design of the multi-utility tunnel by considering urban type and size, the function of surrounding road and feasibility analyses with respect to construction method, and arrangement of accommodation facilities inside multi-utility tunnel. Thus, in this study, we developed the evaluation model for the optimum design of the multi-utility tunnel before and after the decision of the multi-utility tunnel installation. In this paper, we have selected the Deming cycle which is used in various fields among several decision methods for optimizing the design. For the purpose of reflecting the various factors in the design of the multi-utility tunnel, 11 higher indicators were set up to lead to more detailed approaches. In addition, based on the "Plan-Do-Check-Action (PDCA)" circulation method, we can realize the installation of the multi-utility tunnel and design more efficiently through the first phase for conception and the second phase for optimization, and develop the program for the evaluation model accordingly.

Analysis of importance by category for quantitative economic evaluation of multi-utility tunnel (공동구의 정량적 경제성 평가를 위한 항목별 중요도 분석)

  • Cho, Choong-yeun;Sim, Young-Jong;Kim, Hun-kyom;Lee, Pil-yoon;Lee, Min-jae
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.1
    • /
    • pp.119-130
    • /
    • 2018
  • The VE/LCC study on the existing multi-utility tunnel examined the economical feasibility of the collective area through the cost-benefit analysis of the ten major routes of Seoul for the benefit (7 items) and the cost (5 items) through quantitative methods. In this paper, we analyzed the economic efficiency of 61 sectors by adding 3 items (reduced traffic accident, reduced vehicle noise, social-economic loss). The reduced traffic accident item is an improvement of the traffic accident cost that can be saved by the implementation of the project, and the reduced vehicle noise item is an indicator of the amount of noise change caused by the implement of the business. Finally, the social-economic loss items represent the impact on the local economy due to the construction of the multi-utility tunnel. The amounts of the additional items were compared and items added in the open type and tunnel type multi-utility tunnel were analyzed for each analysis. Result on the analysis, it analyzed the items applied to the basic and detail models in the economic evaluation of the multi-utility tunnel design, and makes it possible to evaluate the economic efficiency more efficiently. The economic evaluation of the basic and detailed models including the items presented in this study will be often used in the design of the multi-utility tunnel design.

Decision technique for accommodation facilities of multi-utility tunnel in basic planning phase (기본 계획 단계에서의 공동구 수용시설물 결정 기법)

  • Oh, Won-Joon;Jin, Kyu-Nam;Kang, Yeong-Ku;Cho, Choong-Yeun;Sim, Young-Jong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.1
    • /
    • pp.79-92
    • /
    • 2019
  • In this paper, we propose a method to determine whether to install the accommodation facility of the multi-utility tunnel more effectively in the basic planning phase, and to set up an evaluation system to determine the configuration and kind of accommodation facility. For the configuration of the accommodation facility, 98 alternatives were analyzed for 7 accommodation facility. For the evaluation system of the accommodation facility, index related to feasibility and economic in basic planning phase were selected. The evaluation system classified as spatial, effective, and cost evaluation was presented reflecting the selected index, and AHP analysis was performed for weight setting. The results of this study will be helpful for users including designers to shorten the time and increase the efficiency in the process of determining accommodation facility of the multi-utility tunnel in basic planning phase.

A Study on the Correction Factors of Soil Non-linearity Considering Korean Regional Conditions for Seismic Deformation Method Applied to Multi-Utility Tunnels (공동구의 응답변위법 해석 시 국내 특성을 반영한 지반 비선형 보정계수 연구)

  • Choi, Jeong Ho;Yun, Jong Seok;Choo, Yun Wook;Youn, Jun Ung
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.25 no.1
    • /
    • pp.11-20
    • /
    • 2021
  • The seismic deformation method is conventionally used as a seismic design for a multi-utility tunnel in Korea. In the seismic deformation method, the soil ground's natural period is one of the most critical factors for calculating the ground displacement using cosine functions. Correction factors for the natural period and shear wave velocity have been used to consider the non-linearity of dynamic soil properties. However, the correction factors have been issued because the correction factors have not been sufficiently studied to consider Korea's regional conditions. This paper aims to evaluate the natural periods for the seismic deformation method considering Korea's ground conditions. Ground response analysis was performed using seven real earthquake records on twelve sites with different soil conditions where actual multi-utility tunnels are installed. As a result, natural periods of the sites were analyzed and new correction factors were proposed according to seismic performance and Korea's regional conditions.

A Study on the Ground Movement around Tunnel Reinforced by Umbralla Arch Method (Umbrella Arch 공법에 의한 터널 천단부 보강시 주변 지반의 거동에 관한 연구)

  • 배규진;김창용;문홍득;훙성완
    • Tunnel and Underground Space
    • /
    • v.7 no.4
    • /
    • pp.299-309
    • /
    • 1997
  • Soil and rock improvement and reinforcement techniques are applied to achieve safe tunnel excavation in difficult geological conditions. The Umbrella Arch Method(UAM), one of the auxiliary techniques, is used to reduce ground permeability and improve stabtility of the tunnel by inserting a series of steel pipes into ground around the crown inclined to the longitudinal axis of the tunnel. Additionally, multi-step grouting is added through the steel pipes. UAM combines the advantages of a modern forepoling system with the grouting injection method. This technique has been applied in subway, road and utility tunneling sites for the last few years in Korea. This paper presents the results of analysis of the case studies on ground movements associated with UAM used in the Seoul Subway line 5 constructon site. Improvement of tunnel stability and decrease of ground settlement expected with pipe insertion are also discussed. Finally, the method to minimize ground settlements caused by NATM tunnelling are suggested.

  • PDF

Decision Making Methodology on Ventilation System for Road Tunnels Based on Multi-Attribute Utility Theory (다속성 효용이론을 활용한 터널환기방식 선정)

  • Lee, Hye-Jin;Kang, Sang-Hyeok;Park, Won-Young;Seo, Jong-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.106-115
    • /
    • 2007
  • The size and length of road tunnels have been gradually expanded as industry developed. Consequently, the risk has been increased. The decision making process for ventilation system for road tunnels involves a large amount of information on economic feasibility, construction methods, and safety etc. In situation where systematically structured decision making process is unavailable, almost decisions about ventilation systems are made based on engineers' private knowledge and experiences. Procedure and criteria to choose the best optimized ventilation system among many alternatives are proposed, breaking away from the economic dependency-oriented decision making. This paper presents a Multi-Attribute Utility Theory and AHP based function with which planners can calculate overall utility of each alternative. It is anticipated that the effective use of the proposed methodology for decision making on ventilation systems ould be able to reduce the likelihood of the occurrence of potential safety risks as well as increase the overall ventilation performance.

A study on the normal project duration development for the construction of multi-utility tunnel in the existing city (기존시가지의 공동구 건설을 위한 표준공기 산정에 대한 연구)

  • Lee, Seong-Won;Lee, Pil-Yoon;Byun, Yo-Seph;Cho, Choong-Yeun;Lee, Min-jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.677-685
    • /
    • 2018
  • In construction, schedule management is the basic but important step, for the effective schedule management, the preparation of the reasonable schedule table should be prioritized. In the design stage, the optimal construction period can be selected through comparison of various conditions and construction methods considering weather conditions and site characteristics. But, At the planning phase, it is difficult to select the effective method and calculate the proper construction period by the basic data(D/B) analysis. In this paper, the construction method considering characteristics of each type and conditions of existing city was selected. For the reasonable duration calculation, we analyzed the unit schedule for RC method for open type and Shield TBM method for tunnel type. The normal project duration of construction assuming of 1,200m of extension and every 200m of ventilation was prepared by integrating each unit schedule. It was analyzed that it took 893 days for the open type and 616 days for the tunnel type. The results of this study will help to make type selection and normal project duration more easily in the planning phase. If it is linked to the design stage, it will be easy to estimate the process and construction cost.