• Title/Summary/Keyword: Multi-tasking system

Search Result 72, Processing Time 0.016 seconds

Parallel solution of linear systems on the CRAY-2 using multi/micro tasking library (CRAY-2에서 멀티/마이크로 태스킹 라이브러리를 이용한 선형시스템의 병렬해법)

  • Ma, Sang-Back
    • The Transactions of the Korea Information Processing Society
    • /
    • v.4 no.11
    • /
    • pp.2711-2720
    • /
    • 1997
  • Multitasking and microtasking on the CRAY machine provides still another way to improve computational power. Since CRAY-2 has 4 processors we can achieve speedup up to 4 properly designed algorithms. In this paper we present two parallelizations of linear system solution in the CRAY-2 with multitasking and microtasking library. One is the LU decomposition on the dense matrices and the other is the iterative solution of large sparse linear systems with the preconditioner proposed by Radicati di Brozolo. In the first case we realized a speedup of 1.3 with 2 processors for a matrix of dimension 600 with the multitasking and in the second case a speedup of around 3 with 4 processors for a matrix of dimension 600 with the multitasking and in the second case a speedup of around 3 with 4 processors for a matrix of dimension 8192 with the microtasking. In the first case the speedup is limited because of the nonuniform vector lenghts. In the second case the ILU(0) preconditioner with Radicati's technique seem to realize a reasonable high speedup with 4 processors.

  • PDF

Critical Chain Project Management as a New Paradigm for Reducing the Project Delivery Time (프로젝트 일정 단축을 위한 새로운 경영 패러다임 Critical Chain Project Management(CCPM))

  • Jang, Seong-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.68-74
    • /
    • 2007
  • Critical Chain Project Management(CCPM) is a new project management system paradigm which maintains the advantages of PERT/CPM and improves the shortcomings of it. In CCPM the task durations are determined as 50% time estimates, ie average time discarding the their contingency. CCPM determines the critical chain the constraint of a projects considering the logical precedence relationship and resource conflict resolution. Project buffer is located at the end of critical chain to absorb the variations of critical chain. The size of project buffer is usually calculated as the half of the sum of critical chain length. Also feeding buffer is inserted after each non-critical chain which feeding into the critical chain to prevent the time delay of critical chain from uncertainties of non-critical chains. Resource buffer can be utilized to improve the availability of resources of critical chain. Buffer management is a project execution and control mechanism. Buffers are classified into 3 zones. They are OK zone, Watch and Plan zone and Expediting zone. If the project status is within Watch and Plan zone, contingency plan is established. And if it changes into Expediting zone, the preplanned contingency plan are executed to recover the time delay. In CCPM the workers are asked to work with relay runner work mechanism that they work fast if possible and report their completion to project manager for the succeeding task to start as soon as possible. The task durations are not considered as the promised time schedule. The multi-tasking is prohibited.

  • PDF