• Title/Summary/Keyword: Multi-purpose Dam

Search Result 127, Processing Time 0.026 seconds

One-month lead dam inflow forecast using climate indices based on tele-connection (원격상관 기후지수를 활용한 1개월 선행 댐유입량 예측)

  • Cho, Jaepil;Jung, Il Won;Kim, Chul Gyium;Kim, Tae Guk
    • Journal of Korea Water Resources Association
    • /
    • v.49 no.5
    • /
    • pp.361-372
    • /
    • 2016
  • Reliable long-term dam inflow prediction is necessary for efficient multi-purpose dam operation in changing climate. Since 2000s the teleconnection between global climate indices (e.g., ENSO) and local hydroclimate regimes have been widely recognized throughout the world. To date many hydrologists focus on predicting future hydrologic conditions using lag teleconnection between streamflow and climate indices. This study investigated the utility of teleconneciton for predicting dam inflow with 1-month lead time at Andong dam basin. To this end 40 global climate indices from NOAA were employed to identify potential predictors of dam inflow, areal averaged precipitation, temperature of Andong dam basin. This study compared three different approaches; 1) dam inflow prediction using SWAT model based on teleconneciton-based precipitation and temperature forecast (SWAT-Forecasted), 2) dam inflow prediction using teleconneciton between dam inflow and climate indices (CIR-Forecasted), and 3) dam inflow prediction based on the rank of current observation in the historical dam inflow (Rank-Observed). Our results demonstrated that CIR-Forecasted showed better predictability than the other approaches, except in December. This is because uncertainties attributed to temporal downscaling from monthly to daily for precipitation and temperature forecasts and hydrologic modeling using SWAT can be ignored from dam inflow forecast through CIR-Forecasted approach. This study indicates that 1-month lead dam inflow forecast based on teleconneciton could provide useful information on Andong dam operation.

Dam Inflow Forecasting for Short Term Flood Based on Neural Networks in Nakdong River Basin (신경망을 이용한 낙동강 유역 홍수기 댐유입량 예측)

  • Yoon, Kang-Hoon;Seo, Bong-Cheol;Shin, Hyun-Suk
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.1
    • /
    • pp.67-75
    • /
    • 2004
  • In this study, real-time forecasting model(Neural Dam Inflow Forecasting Model; NDIFM) based on neural network to predict the dam inflow which is occurred by flood runoff is developed and applied to check its availability for the operation of multi-purpose reservoir Developed model Is applied to predict the flood Inflow on dam Nam-Gang in Nak-dong river basin where the rate of flood control dependent on reservoir operation is high. The input data for this model are average rainfall data composed of mean areal rainfall of upstream basin from dam location, observed inflow data, and predicted inflow data. As a result of the simulation for flood inflow forecasting, it is found that NDIFM-I is the best predictive model for real-time operation. In addition, the results of forecasting used on NDIFM-II and NDIFM-III are not bad and these models showed wide range of applicability for real-time forecasting. Consequently, if the quality of observed hydrological data is improved, it is expected that the neural network model which is black-box model can be utilized for real-time flood forecasting rather than conceptual models of which physical parameter is complex.

Hydrological Stability Analysis of the Existing Soyanggang Multipurpose Dam

  • Ko, Seok-Ku;Shin, Yong-Lo
    • Korean Journal of Hydrosciences
    • /
    • v.7
    • /
    • pp.37-49
    • /
    • 1996
  • This study aims at suggesting an alternative to improve flood controling capacity according to the cument design criteria for the existing Soyanggang Multi-purpose Dam which was constructed 20 years ago as the largest dam in Korea. The peak inflow of the adopted probable maximum flood (PMF) at the time of construction was 13,500 $m^3$/s. However, the newly estimated peak inflow of the PMF is 18,000 $m^3$/s which is 1.34 times bigger than the original one. This is considered to be due to the accumulation of the reliable flood and storm event records after construction, and due to the increasing tendency of the local flood peaks according to the influence of world-wide weather change. The new estimation of the probable maximum precipitation (PMP) was based on the hydro-meteorological method suggested by the guideline of the World Meteorological Organization (WMO). The unit hydrograph which was applied for the estimation of PMF was derived through linear programming algorithm by minimizing the sum of absolute deviations of the calculated and recorded flood hydrographs. In order to adopt the newly estimated PMF as a design flood, following four alternatives were compared : (1) allocation of more flood control space by lowering the normal high water level, (2) construction of a new spillway in addition to the existing spillway, (3) construction of a new dam which has relevant flood control storage at the upstream of the Soyanggang dam, (4) raising the existing dam crest. The preliminary evaluation of these alternatives resulted in that the second alternative is most economic and feasible. So as to stably cope with the newly estimated PMF by meeting all the current functions of the multipurpose dam, a detailed study of an additional spillway tunnel has to be followed.

  • PDF

Mix Design and Physical Properties of Concrete Used in Seongdeok Multi-purpose Dam (성덕 다목적댐 콘크리트의 배합설계 및 역학적 특성)

  • Kim, Jin-Keun;Jang, Bong-Seok;Ha, Jae-Dam;Ryu, Jong-Hyun;Go, Suk-Woo;Kim, Jeong-Soo
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.517-520
    • /
    • 2008
  • Gravity dam use self weight to stand external force like hydraulic pressure. In general, gravity dam concrete is divided into internal and external concrete. Seongdeok dam is gravity dam which is being constructed in Cheongsong-gun, Gyeonsangbuk-do. And upstream cofferdam was constructed to examine the temperature crack due to hydration heat and to decide the height of placement. In this study, we examined the mix design of internal/external concrete and physical properties(compressive strength, adiabatic temperature rise). And we also performed laboratory tests to verify exothermic properties. Lastly, we measured the hydration heat and thermal stress of upstream cofferdam.

  • PDF

Optimal Operation of Single Multi-Purpose Reservoir (단일다목적 저수지의 최적운영)

  • 이순택;이수식
    • Water for future
    • /
    • v.18 no.4
    • /
    • pp.347-359
    • /
    • 1985
  • This study aims at the development of DP-Model for the establishment of monthly optimal operation policy of single multi-puppose reservoir by which the water demand of downstream can be satisfied under the various physical constraints. Series, A. B. C. of inflow are selected out of future monthly inflow data which are simulated form the past monthly average inflow of Andong dam site. the neight possible alternatives in each inflow series are established in order that Andong dam can supply the water demand of Nagdong main stream of 30% to 100%. Nextly, the reservoir rule curves is derived for each alternative by the detailed seguential analysis of stroage, future inflow and water demand based on the reservoir continuite equation. Then, and alternative which can satisfy the objective function of system based on the rule curves in the exteream is determined as an optimal operation policy from the application of developed DP=Model.

  • PDF

Evaluation of hydropower dam water supply capacity (III): development and application of drought operation rule for hydropower dams in Han river (발전용댐 이수능력 평가 연구 (III): 한강수계 발전용댐 가뭄단계별 운영기준 개발 및 효과 분석)

  • Jeong, Gimoon;Kang, Doosun;Kim, Taesoon
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.7
    • /
    • pp.531-543
    • /
    • 2022
  • Integrated water resources management (IWRM) has focused on efficient response to various water related disasters by climate change. In particular, more flexible usage of conventional water resources infrastructures is expected to provide an eco-friendly water management. Multi-purpose dams and water supply dams are well known as water management facilities for securing and supplying water in drought season. Recently, based on the report '2021 multi-purpose use of hydropower dams in Han river', contribution of hydropower dams on water resources management is becoming more significant beyond the traditional role of hydropower generation. In drought conditions, the dams control water supply depending on the pre-defined drought stages. In the case of multi-purpose dams, an operation standard during drought has been already prepared and applied; however, for the hydropower dams, specific standards are not fully prepared yet in South Korea. In this study, a method for calculation of standard water storage and discharge reduction of hydropower dams according to drought stage is newly proposed reflecting the characteristics of hydropower dams. The proposed method was applied to the hydropower dams in Han river, where six hydropower dams are located. A case study of the historical droughts occurred in 2014-2017 demonstrated that the proposed hydropower dam operation rule could improve the water supply stability under severe drought conditions compared to the conventional operations. In the future, the role of hydropower dams for water resources management is expected to become more important, and this study can be widely used for water supply planning such as drought response using hydropower dams.

A System for Estimating Daily Paddy Irrigation Water Requirements in Simulating Daily Streamflow

  • Noh Jae Kyoung
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.46 no.7
    • /
    • pp.71-80
    • /
    • 2004
  • A system for estimating daily paddy irrigation water requirements was developed to simulate daily stream flows that reflect various upstream and downstream return flows from river basin. Evapotranspiration in paddy fields was estimated using the modified Penman equation. Daily irrigation water requirements of paddy fields were calculated by multiplying the paddy area and the daily decrease in ponding depth. The system was constructed almost completely using images, grids, etc. in Visual Basic 6.0. The developed model was verified in the Damyang dam, and was used to estimate daily paddy irrigation water requirements at 12 small watersheds in Geum river basin for 20 years, from 1983 to 2002, covering paddy field areas of $3,332\~26,422$ ha. The results on the runoff analysis on the inflow to the Daecheong multi-purpose dam with various return flows were satisfactory. They were reasonable compared to the scenario where return flows were not considered.

Classification of hydropower dam in North-han River based on water storage characteristics (저류특성을 고려한 북한강수계 발전용댐의 유형 구분방안 제시)

  • Choi, Jeongwook;Jeong, Gimoon;Kang, Doosun;Ahn, Jeonghwan;Kim, Taesoon
    • Journal of Korea Water Resources Association
    • /
    • v.54 no.8
    • /
    • pp.567-576
    • /
    • 2021
  • Climate change threatens the security of domestic water resources in South Korea. To overcome the potential water shortage, various approaches are being studied by alterning the operation of dams or by integrated operation of multiple dams and reservoirs. However, most of the related researches were developed and applied for multi-purpose dams, and few studies were conducted for the hydropower dams. The main purpose of the hydropower dam is to generate electric energy; however, the potential water shortage due to prolonged droughts brings the idea to supply water from the hydropower dam in the basin. To that end, it is required to estimate the water supply ability of the hydropower dams. In this study, we proposed a methodology to classify the hydropower dam into a "storage-type" and "run-of-river type" dam. The proposed approach was demonstrated using the hydropower dams located in North-han River basin. The results of this study are expected to contribute for further analysis of the hydropower dams, such as evaluation of water supply capacity and drought mitigation purpose operation of the hydropower dams.

Application of recurrent neural network for inflow prediction into multi-purpose dam basin (다목적댐 유입량 예측을 위한 Recurrent Neural Network 모형의 적용 및 평가)

  • Park, Myung Ky;Yoon, Yung Suk;Lee, Hyun Ho;Kim, Ju Hwan
    • Journal of Korea Water Resources Association
    • /
    • v.51 no.12
    • /
    • pp.1217-1227
    • /
    • 2018
  • This paper aims to evaluate the applicability of dam inflow prediction model using recurrent neural network theory. To achieve this goal, the Artificial Neural Network (ANN) model and the Elman Recurrent Neural Network(RNN) model were applied to hydro-meteorological data sets for the Soyanggang dam and the Chungju dam basin during dam operation period. For the model training, inflow, rainfall, temperature, sunshine duration, wind speed were used as input data and daily inflow of dam for 10 days were used for output data. The verification was carried out through dam inflow prediction between July, 2016 and June, 2018. The results showed that there was no significant difference in prediction performance between ANN model and the Elman RNN model in the Soyanggang dam basin but the prediction results of the Elman RNN model are comparatively superior to those of the ANN model in the Chungju dam basin. Consequently, the Elman RNN prediction performance is expected to be similar to or better than the ANN model. The prediction performance of Elman RNN was notable during the low dam inflow period. The performance of the multiple hidden layer structure of Elman RNN looks more effective in prediction than that of a single hidden layer structure.

A Study of Optimal Operation Policy using Risk Evaluation Criteria(I) (for the Daechung Multi-purpose Reservoir) (위험도 평가기준을 적용한 저수지 최적운영방안 연구(I) (대청댐을 중심으로))

  • Park, Myeong-Gi;Kim, Jae-Han;Jeong, Gwan-Su
    • Journal of Korea Water Resources Association
    • /
    • v.35 no.1
    • /
    • pp.37-49
    • /
    • 2002
  • The application of conventional method for optimizing firm water supply and hydro-electric power generation has some limitation during abnormal or extreme drought periods. Hashimoto et al. (1982) suggested there risk evaluation criteria such as reliability, resilience, and vulnerability. These three criteria have been incorporated into a mixed-integer programming model for evaluating the possible performance of water- supply reservoir (Moy et al., 1986; Srinivasan et al., 1999). However, till now, these kind of researches have been conducted only for water-supply reservoir. Therefore there have been no other study for multi-purpose dam including hydro-electric power generation. This study presents an improved formulation of the previous model for evaluating a multi-purpose reservoir system operation considering water supply and hydro-electric power generation. The modified model was applied to the Daechung multi-purpose reservoir system in the Keum river basin to demonstrate the efficiency of the improved formulation.