• Title/Summary/Keyword: Multi-pole Magnet

Search Result 32, Processing Time 0.017 seconds

A Study on Design of 50kW PMSG for Micro-grid Application (마이크로그리드용 50kW급 PMSG 설계에 관한 연구)

  • Jeong, Moon-Seon;Moon, Chae-Joo;Kim, Hyoung-Gil;Chang, Young-Hak;Park, Tae-Sik
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.9 no.4
    • /
    • pp.527-536
    • /
    • 2014
  • In this paper, the 50kW aerogenerator which is applicable to the microgrid was designed and analyzed by using commercial simulation program Maxwell 2D. Particularly, the suggested PMSG to reduce the cogging torque introduced the offset and skew concept. The suggested optimal value of offset and skew was decided by 2mm and 60 degree of electric angle. The simulation results of the PMSG when load operation condition showed the average harmonic distortion 1.3%, voltage 322.41V, current 94.95A, and iron loss 9.73W, eddy current loss 73.68W, copper loss 3.52kW. The capacity of aerogenerator calculated 61.56kW, and the suggested design process can be applied to higher capacity generator.

Performance of Beam Extractions for the KSTAR Neutral Beam Injector

  • Chang, D.H.;Jeong, S.H.;Kim, T.S.;Lee, K.W.;In, S.R.;Jin, J.T.;Chang, D.S.;Oh, B.H.;Bae, Y.S.;Kim, J.S.;Cho, W.;Park, H.T.;Park, Y.M.;Yang, H.L.
    • Proceedings of the Korean Vacuum Society Conference
    • /
    • 2011.02a
    • /
    • pp.240-240
    • /
    • 2011
  • The first neutral beam injector (NBI-1) has been developed for the Korea Superconducting Tokamak Advanced Research (KSTAR) tokamak. A first long pulse ion source (LPIS-1) has been installed on the NBI-1 for an auxiliary heating and current drive of KSTAR core plasmas. Performance of ion and neutral beam extractions in the LPIS-1 was investigated initially on the KSTAR NBI-1 system, prior to the neutral beam injection into the main plasmas. The ion source consists of a JAEA magnetic bucket plasma generator with multi-pole cusp fields and a set of KAERI prototype-III tetrode accelerators with circular apertures. The inner volume of plasma generator and accelerator column in the LPIS-1 is approximately 123 liters. Final design requirements for the ion source were a 120 kV/ 65 A deuterium beam and a 300 s pulse length. The extraction of ion beams was initiated by the formation of arc plasmas in the LPIS-1, called as an arc-beam extraction method. A stable ion beam extraction of LPIS-1 has been achieved up to an 100 kV/42 A for a 4 s pulse length and an 80 kV/25 A for a 14 s pulse length. Optimum beam perveance of 1.21 microperv has been found at an accelerating voltage of 80 kV. Neutralization efficiency has been measured by using a water flow calorimetry (WFC) method of calorimeter and an operation of bending magnet. The full-energy species of ion beams have been detected by using the diagnostic method of optical multichannel analyzer (OMA). An arc efficiency of the LPIS was 0.6~1.1 A/kW depending on the operating conditions of arc discharge.

  • PDF