• Title/Summary/Keyword: Moving Vehicle Method

Search Result 405, Processing Time 0.022 seconds

Applicability of Composite Polyurea Method Considering the Required Performance in Underground Parking Lot Upper Slab (공동주택 지하주차장 상부슬래브의 요구성능을 고려한 복합형 폴리우레아 공법의 적용성 검토)

  • Lee, Jung-Hun;Choi, Eun-Kyu;Song, Je-Young;Kim, Soo-Yeon;Oh, Sang-Keun
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.7 no.3
    • /
    • pp.243-254
    • /
    • 2019
  • In this study, problems of the waterproofing methods in which water leakage occurs in the upper slab of the underground parking lot of apartment houses and the requirements considering the characteristics of the upper slab, and selected the appropriate performance(proposal) for the composite polyurea process are reviewed. As a result of the study, it is necessary to review performance such as responsiveness to upper slab of the multi-unit underground parking lot that is comprised of (1) crack and behavior responsiveness, (2) surface integrity, (3) vertical watertight stability, (4) pressure layer construction, (5) impact and pressure response and (6) vehicle moving load. As a result of evaluating 5 items corresponding to the requirements for the soft and hard complex polyurea, all of them were found to meet the conditions, and each materials were improved by compounding the materials that had problems when applying a single-ply method, thereby clarifying the advantages and disadvantages of the material property. However, in order to apply to the actual site, additional evaluation on site applicability such as mock-up evaluation should be conducted, and subsequent studies on the applicability of the market through review of economic feasibility and maintenance is required.

Minimization Method of Data Collection Delay Time for Bus Information System (버스정보 수집지연시간 최소화 방안 연구)

  • Lim, Seung-Kook;Kim, Young-Chan;Ha, Tae-Jun;Lee, Jong-Chul
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.7 no.6
    • /
    • pp.81-91
    • /
    • 2008
  • In this study, data collection delay time generated in bus information system is analysed and improvement on system reliability by minimizing the delay time is suggested. To minimize the data collection delay time (call setup time), factors on data collection phase are analyzed. Each connecting time that it occurs from wireless communication during data collection phase, is selected as a main effective variable and a model for selecting an optimum communication point to minimize the effect of data delay time by each connecting time is suggested. In this model, minimization of the point between the time carrying out wireless communication and vehicle moving time, is calculated and the difference between the bus arrival time and information delivered time to the passenger is reduced. The test results for the proposed model in BIS using a CDMA (Code Division Multiple Access) communication show that delay time in real system operation has been improved. The minimum data collection delay time based on optimal communication position leads to the better reliability for Bus Information System. This study can be applied to the selection of optimal communication position and detection position instead of empirical methods.

  • PDF

Local Behavior of Structural Details for Orthotropic Steel Deck Bridge with Longitudinal Rib of Open Section and Retrofitting Method of Fatigue Cracks (개단면리브를 갖는 강바닥판 교량의 국부거동 분석 및 피로균열 보강방안)

  • Lee, Sung Jin;Kyung, Kab Soo;Lee, Hee Hyun;Jeon, Jun Chang
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.17 no.2
    • /
    • pp.33-44
    • /
    • 2013
  • Although many studies have been performed for the structural details of orthotropic steel deck, most of them were focused on the trough rib of standard type, but not for orthotropic steel deck with longitudinal rib of open section used at beginning of the deck. In order to investigate the cause of fatigue crack for orthotropic steel deck bridge serviced 31 years with longitudinal rib of open section, in this study, the behavior characteristics of target structural details were analyzed based on measurement data under real traffic condition. Also the typical loading truck passing the target bridges was estimated with the structural analysis detailed, and the stresses and deformation patterns of target structural details were analyzed by performing the detailed structural analysis. Based upon the analysis, retrofitting methods of the fatigue crack were suggested and its validation was examined. From this study, it was clarified that fatigue crack of longitudinal rib with open section were affected with the stress increment by shear deformation in the rib and the occurrence of alternative stress due to moving vehicle. In addition, it was known that it is important to perform fatigue design reflected the local behavior of the structural details.

A Study of Establishing the Plan of Lodging for the Workers of Gaesung Industrial Complex (개성공단 근로자 기숙사 건립 계획 연구)

  • Choi, Sang-Hee;Kim, Doo-Hwan;Kim, Sang-Yeon;Choi, Eun-Hee
    • Land and Housing Review
    • /
    • v.6 no.2
    • /
    • pp.67-77
    • /
    • 2015
  • Now that it is the current situation that the smooth supply and demand are necessary for 2nd phase of beginning construction and stable development of Gaesung Industrial Complex, this study was willing to offer the planning criteria and model to establish the lodging for the workers in Gaesung Industrial Complex based on the agreement that both South and North Korea agreed in 2007. Regarding the plan, its standard and the alternative were reviewed considering welfare of workers, economic efficiency, technical validity, possibility of agreement and long-term development. The exclusive area per capita was calculated through Labor Standards Act of Korea and status survey of lodging for the workers provided to border line area between China and North Korea and the economic alternative based on one room for 6 persons with the public restroom was compared with that of development type based on one room for 4 persons with indoor restroom. Especially regarding the proposed site, the area with the optimized position was set by considering gradient, accessibility and convenience of development out of the area of Dongchang-ri where was agreed already and the priority of the proposed site that can keep the existing building site and provide was offered. The necessary period for whole construction was set as approximately 36 months. Regarding construction method, RC Rahmen method was selected as the optimized alternative considering the workmanship of manpower of North Korea and conditions of supply and demand of materials and cluster-type vehicle allocation plan based on 4~6 units considering the efficiency of supplying service facilities and convenient facilities along the simultaneous accommodation of 15,000 people was offered. It was analyzed that total business expenses of approximately 80~100 billion Korean Won would required though there were the difference for each alternative in the charged rental way that the development business owner develops by lending the inter-Korea Cooperation Fund and withdraws the rent by the benefit principle. The possibility of withdrawing the rent was analyzed assuming that the period of withdrawing the investment is 30 years. Especially for the operation management after moving, the establishment of the committee of operating the lodging for the workers of Gaesung Industrial Complex (tentative name) was offered with the dualized governance that the constructor takes charge of operational management, collecting fees and management of infrastructure and human resource management is delegated to North Korea.

Fundamental Study on Establishing the Subgrade Compaction Control Criteria of DCPT with Laboratory Test and In-situ Tests (실내 및 현장실험를 통한 DCPT의 노상토 다짐관리기준 정립에 관한 기초연구)

  • Choi, Jun-Seong
    • International Journal of Highway Engineering
    • /
    • v.10 no.4
    • /
    • pp.103-116
    • /
    • 2008
  • In this study, in-situ testing method, Dynamic Cone Penetration Test(DCPT) was presented to establish a new compaction control criteria with using mechanical property like elastic modulus instead of unit weight for field compaction control. Soil chamber tests and in-situ tests were carried out to confirm DCPT tests can predict the designed elastic modulus after field compaction, and correlation analysis among the DCPT, CBR and resilient modulus of sub grade were performed. Also, DCPT test spacing criteria in the construction site was proposed from the literature review. In the result of laboratory tests, Livneh's equation was the best in correlation between PR of DCPT and CBR, George and Pradesh's equation was the best in the predicted resilient modulus. In the resilient modulus using FWD, Gudishala's equation estimates little larger than predicted resilient modulus and Chen's equation estimates little smaller. And KICT's equation estimates the modulus smaller than predicted resilient modulus. But using the results of laboratory resilient modulus tests considering the deviatoric and confining stress from the moving vehicle, the KICT's equation was the best. In the results of In-situ DCPT tests, the variation of PR can occur according to size distribution of penetrate points. So DCPT test spacing was proposed to reduce the difference of PR. Also it was shows that average PR was different according to subgrade materials although the subgrade was satisfied the degree of compaction. Especially large sized materials show smaller PR, and it is also found that field water contents have influence a lot of degree of compaction but a little on the average PR of the DCPT tests.

  • PDF