• Title/Summary/Keyword: Monitoring management plan

Search Result 362, Processing Time 1.626 seconds

A web-based Obesity Management system using Body variations (신체 변화량을 이용한 웹 기반 비만관리 시스템)

  • Kang, Hee-Beom;Lee, Jong-Won;Jang, Jae-Myung;Kim, Kyung-Hwan;Jung, Hoe-Kyung
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2016.05a
    • /
    • pp.722-724
    • /
    • 2016
  • Today, The development of a system to manage and monitor obesity has emerged thus as obesity increases. However, most of the monitoring system will only serve to show information of the user only has to calculate the height and weight, Since there is a problem that the user is a low efficiency when the design plan for the movement. In this paper, Express a numerical value of the BMI of the user in a graph and BMR divided into grades users were easy to understand for himself. In addition to design an exercise plan by showing Kcal he has used a number of days of consumption exercise machines used to study the efficient web-based monitoring system.

  • PDF

A Study on the Framework of International Cooperation Business in HRD KOREA (국제협력사업의 체계적인 추진방향에 관한 연구)

  • Son, Bae-Won;Park, Jae-Hyun
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.1
    • /
    • pp.189-198
    • /
    • 2010
  • This study is aimed at proposing the framework of international cooperation business in HRD KOREA. To achieve this goal I collected all of data that were used in process of international cooperation business in HRD KOREA and interviewed some people to get information from the people concerned. After that I analyzed data involved in using SWOT technique and proposed the framework of international cooperation business in HRD KOREA. The conclusions are as these. First, alliances must be vitalized between businesses besides between organizations. For example 'Developing of voluntary comeback program for foreigner' and 'Establishment of HRD KOREA Center' can be proposed as action plans for this strategy. Second, glocalization must be pushed ahead. For example 'Business career monitoring system for PMC' can be proposed as action plan. Third, building of preemptive base must be done. For example 'Standing of international HRD forum' can be proposed as action plan. Fourth, reinforcement of organizational competency must be done. For example 'The program for internationalization' can be proposed as action plan. Fifth, SBU(Strategic Business Unit) must be pushed ahead. For example 'Customer diversification portfolio' can be proposed as action plan.

A Review of Large-Scale Hydropower Project in Public Sector of Pakistan

  • Umair, Muhammad;Choudhary, Muhammad Abbas;Jahanzaib, Mirza
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.4
    • /
    • pp.47-59
    • /
    • 2014
  • Client organization inadequate project planning before awarding the contract and insufficient monitoring and control system among the parties involved create severe problems. Ultimately, large-scale projects go beyond the expected cost and time control limits. This paper discusses the major issues involved with a large-scale Hydropower Project in Pakistan Public Sector environment. The latest approved Baseline Plan of project was reviewed and analyzed using Variance Analysis and Trend Analysis techniques in Primavera project management software to assess the efforts made of the parties involved. It was found that Project is 202% Cost overrun and 25% time delays from original contract award. After analysis of baseline plan and quantification of various variance issues in impacted activities, the questionnaire survey was conducted to identify the impact of causative factors. There were almost 17 most significant causative factors identified among 60 identified factors and responsibilities are assigned accordingly. At the end recommendations are made for strategic decisions as lessons learned during project evaluation.

The Management Plan for the Ecological Waterfront Space of Muan Changpo Lake (무안 창포호의 자연생태친수공간 조성을 위한 관리방안 기초 연구)

  • Seo, Jung-Young
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.22 no.3
    • /
    • pp.15-30
    • /
    • 2019
  • Changpo Lake was created as a part of a land reclamation for refugee self-helping projects. It shows characteristics of a fresh water lake, and still retains the early appearance of reclamation that surrounding regions have not been developed into farm lands. Shallow wetland has formed around the lake, which provides great conditions for diverse lives, and surrounding earthiness is favorable for growth of vegetation and restoration of the ecosystem. However, as facilities of the Muan International Airport nearby Changpo Lake are expanding and barns are being constructed, artificialness is gradually increasing. Particularly, since pollution sources such as sport facilities, farm lands and barns are scattered around Changpo Lake, pollutants are flowing in constantly. Accordingly, the results for setting up management areas according to the spatial characteristics and creating natural ecological spaces near Changpo Lake, Taebongcheon stream and Hakgyecheon stream are as follows. First, the creation of a natural eco-friendly waterfront space should be promoted by securing the health of the aquatic ecosystem and restoring species and the ecosystem. In addition, a consultative body needs to be formed to lead local residents to participating in river investigation and monitoring, maintenance, and management through role sharing. Second, the basic direction of the spatial management plan is to keep the unique charm of Changpo Lake, maintain harmony with nature, create diverse waterfront areas, and secure the continuity of Changpo Lake and inflow streams. Moreover, the area should be divided into three zones such as a conservation zone, a restoration zone and a waterfront zone, and for each zone, the preservation of vegetation, the creation of ecological wetlands and restoration of the ecotone and ecological nature need to be promoted. Third, facilities and activity programs for each space of Changpo Lake should be operated for efficient management of protected areas. In order to suit the status of each space, biological habitats, water purification spaces, experiential and learning spaces, and convenience and rest spaces should be organized and designated as research, monitoring, education, and tourism areas. Accordingly, points of interest should be set up within the corresponding area. In this study, there are many parts that need to be supplemented for immediate implementation since the detailed plans and project costs for the promotion of programs by area are not calculated. Therefore, it is necessary to make detailed project plans and consider related projects such as water quality, restoration of habitats, nature learning and observation, and experience of ecological environments based on the categories such as research, monitoring, education and tourism in the future.

A Study on Energy Saving and Safety Improvement through IoT Sensor Monitoring in Smart Factory (스마트공장의 IoT 센서 모니터링을 통한 에너지절감 및 안전성 향상 연구)

  • Woohyoung Choi;Incheol Kang;Changsoo Kim
    • Journal of the Society of Disaster Information
    • /
    • v.20 no.1
    • /
    • pp.117-127
    • /
    • 2024
  • Purpose: The purpose is to conduct basic research to save energy and improve the safety of manufacturing plant infrastructure by comprehensively monitoring energy management, temperature, humidity, dust and gas, air quality, and machine operation status in small and medium-sized manufacturing plants. Method: To this end, energy-related data and environmental information were collected in real time through digital power meters and IoT sensors, and research was conducted to disseminate and respond to situations for energy saving through monitoring and analysis based on the collected information. Result: We presented an application plan that takes into account energy management, cost reduction, and safety improvement, which are key indicators of ESG management activities. Conclusion: This study utilized various sensor devices and related devices in a smart factory as a practical case study in a company. Based on the information collected through research, a basic system for energy saving and safety improvement was presented.

A Study on the Management Plan of Hongneung Forest Based on Visitor Monitoring (이용객 모니터링을 통한 홍릉숲 관리방안 연구)

  • Choi, Ga Young;Kim, Tongil
    • Journal of Korean Society of Forest Science
    • /
    • v.104 no.3
    • /
    • pp.443-453
    • /
    • 2015
  • In 1922, Hongneung forest was established to support the study of Korean forestry. Nowadays the forest also plays a role as urban forest which provides a green space for local people. This paper proposes the better management plan of Hongneung forest based on visitor monitoring. On-site surveys with a structured questionnaire were carried out from August to November in 2014 and total 750 data were analyzed. The survey results are as follows: 1) Visitors were inclusive of all age groups and most of them lived nearby Hongneung forest, 2) Visitors used the forest mainly for recreational purposes and recognized the forest as 'Green space' rather than 'experimental forest', 3) Visitors had great satisfaction from the forest visit and raised the necessity of more environment education and promotion of the program. Based on the results, the following solutions have been suggested: 1) Environment education will help visitors to raise awareness on the importance of Hongneung forest which plays a role as both experimental and urban forest, 2) Systematic visitor monitoring can contribute to efficient visitor management and administration of the areas. In conclusion, it is necessary to establish a visitor management system that enable to achieve a harmonization between nature conservation and recreational demands as well as to improve management of natural resource and service.

Management and concept of the monitoring system considering the characteristics of subsea tunnels (해저터널의 특성을 고려한 계측 개념 및 관리 방안)

  • Park, Eui-Seob;Shin, Hee-Soon;Cheon, Dae-Sung;Jung, Yong-Bok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.5
    • /
    • pp.523-536
    • /
    • 2013
  • In order to ensure the safety of the subsea tunnel during its construction and operation, unlike the underground structures on land, the special monitoring system is essential which considers the characteristics of subsea tunnels in addition to conventional stress and displacement measurements applied to existing land tunnels. Therefore, the concept applied to NATM is reorganized to evaluate the stability of subsea tunnels. And the observation system for making a monitoring plan, the critical strain theory for tunnel safety management and MS monitoring methods for detecting the local failure and crack initiation of rock and supports, are introduced. Finally, the scheme of monitoring and management for subsea tunnels by using these methods is suggested.

Power Quality Monitoring System Using DWB on Distribution Automation System (DWB를 이용한 배전자동화 기반의 전기품질 모니터링 시스템 구축)

  • Kang, Moon-Ho;Lee, Heung-Ho
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.9
    • /
    • pp.86-93
    • /
    • 2011
  • The necessity of Power Quality(PQ) Management grow bigger because the disturbance strength in power system is increasing, on the other hand, the tolerance of electrical components is reducing with widely use of the IT and digital equipments. The domestic management standards on power quality are enacted based on the IEC standards in recent. Since the IEC standards defines the measurement and evaluation point on PQ as PCC(Point of Common Coupling) which is normally the point of penetration between customer and power company, the PQ monitoring system(PQMS) should be made to measure and manage the PQ of custom effectively. In this paper, therefore, the economical construction plan on PQMS using the wireless communication channel in distribution automation system is suggested, and the usefulness of the PQMS are shown by analyzing the PQM data with IEC standards.

Information Requirements for Model-based Monitoring of Construction via Emerging Big Visual Data and BIM

  • Han, Kevin K.;Golparvar-Fard, Mani
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.317-320
    • /
    • 2015
  • Documenting work-in-progress on construction sites using images captured with smartphones, point-and-shoot cameras, and Unmanned Aerial Vehicles (UAVs) has gained significant popularity among practitioners. The spatial and temporal density of these large-scale site image collections and the availability of 4D Building Information Models (BIM) provide a unique opportunity to develop BIM-driven visual analytics that can quickly and easily detect and visualize construction progress deviations. Building on these emerging sources of information this paper presents a pipeline for model-driven visual analytics of construction progress. It particularly focuses on the following key steps: 1) capturing, transferring, and storing images; 2) BIM-driven analytics to identify performance deviations, and 3) visualizations that enable root-cause assessments on performance deviations. The information requirements, and the challenges and opportunities for improvements in data collection, plan preparations, progress deviation analysis particularly under limited visibility, and transforming identified deviations into performance metrics to enable root-cause assessments are discussed using several real world case studies.

  • PDF

Development of 3 layer EVM(Earned Value Management) Guideline for XP(eXtreme programming) based on CMMI (CMMI기반의 XP를 위한 3단계 EVM 적용 지침 개발)

  • Jeong, Mi-Seo;Han, Hyuk-Soo
    • Journal of Internet Computing and Services
    • /
    • v.9 no.6
    • /
    • pp.155-163
    • /
    • 2008
  • Project Monitoring and Control is one of the required activities in project management. This activity provides the information about whether a project is making a progress as it is planned. It is usually performed in weekly meetings or milestone meetings where the project manager checks the project's current status based on project measures such as schedule, cost and work performance. One of the popular method for project monitoring and control is EVM(Earned Value Management). The major characteristic of EVM is that it uses only one measure 'cost' for schedule and work performance so that it enables 2 independent graphs to be illustrated in one integrated graph based on cost. For applying EVM to a project, it is essential to break whole work to work packages and to assign value of cost to each work package at the initial stage of the project. Therefore EVM is well matched with the lifecycle which requires whole plan at the beginning of project. However, in XP(eXtreme Programming), whole customer requirements are difficult to define and to make a complete plan at the beginning and are more detailed in each Iteration. Therefore EVM is not comfortable method for XP. Therefore in this research we suggest 3 layer EVM which can be applied in XP, and develop a process guidelines based on CMMI(Capability Maturity Model Integration) PMC(Project Monitoring and Control) process area.

  • PDF