MFD 2019를 활용한 모듈러 유닛의 공장생산 관리 (Factory Production Management of Modular Units Using MFD 2019)

  • 이두용;남성훈;이재섭;정담이;김경래;조봉호
    • 대한건축학회논문집:구조계
    • /
    • 제35권6호
    • /
    • pp.139-146
    • /
    • 2019
  • The modular building system is a type of prefabricated construction method, and is an industrialized building system that transports, assembles, and completes a three-dimensional module manufactured in a factory to the site. The economics of a modular building system where 50 to 80% of the entire process takes place in a modular factory is dominated by productivity of the factory manufacturing process. Since the building of the module is finished by the combination of unit parts produced by each material, it is necessary to manage the process in each module unit. However, currently marketed process control programs do not reflect the features of these modular methods. In this paper, we introduce Modular Factory Design software(MFD 2019) that can make modular unit production plan which reflects production base(modular factory) and production target(application and number of modular units). In order to verify software compatibility and reliability, two production plans with different production methods were formulated and simulated.

Development of Project Delivery System for Modular Building in Korea

  • Nam, Sung-hoon;Kim, Kyung-rai;Lee, Dong-gun;Heo, So-young
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.704-705
    • /
    • 2015
  • Recent research has been ongoing for modular buildings in the country, and interest increases. However, in accordance with legal restrictions in the country with regard to Project Delivery system of Modular Building, the activation of modular buildings industry is obstructed. In Korea, in accordance with national contract law, the construction contract is apply to the project delivery system of modular buildings, and in accordance with Framework Act on the Construction Industry, The project delivery system of modular buildings has to be a separate order. The definition of separate order in contract as defined in the law is that the electric work and Communication work and digestion facility work has to be separate each contract in order to be ensured professionalism. In accordance with law, the project delivery system of modular buildings is that the contract for construction is concluded with the Owner and the Construction Contractor and the contract for goods is concluded with the construction Contractor and modular manufacturer. Due to these project delivery system, the domestic factory production rate when making a modular unit is significantly reduced compared to the rate of factory production abroad and the domestic factory production rate is estimated to 10-20%. Due to the factory production rate is also low, despite what can be done at the factory the workload in construction field increases. According to the workload in field increases, the effect of the schedule reduction can be reduced. It resolved to form a consortium with a modular manufacturer and construction companies or the contract is concluded with Owner, modular manufacturer and construction companies in each. In this paper, we propose a specific project delivery system for modular building to solve the problem of the low factory production rate and the problem of schedule reduction. Through this paper, due to the variety of project delivery system on modular buildings is expected to contribute to the activation of modular buildings.

  • PDF

A Study on the Supply Process of Unit Modular Housing through a Comparison of Cases

  • Kim, Kyoon-Tai;Jun, Young-Hun;Kim, Tae-Yeong
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.411-414
    • /
    • 2015
  • The purpose of this study is to conduct a comparative analysis between Korea and the United States of the supply process of unit modular housing at both the factory production phase and the transportation and lifting phase, as part of an attempt to invigorate the unit modular housing market in Korea. Unlike the practice in the United States, one of Korea's unique characteristics is that the floor is constructed with reinforced concrete and hot water heating system. To do this, the wet method in Korea is used that includes concrete placement, curing and constructing hot water floor heating system at the factory production phase, which results in a longer production time and also requires the lifting of heavier loads. In the United States, interior and exterior finishing works of modular housing are performed by different companies, and the distance between the unit module factory and the construction site is quite far. This kind of dualized production structure may cause confusion when it comes to schedule management, procurement management, and stock management. Moreover, problems caused by external environmental factors such as wind and rainfall were reported in the course of long-distance transportation. The results of this case comparison are expected to provide fundamental data that will reduce the amount of trial and error in the unit module production, transportation and lifting work in Korea, which has a comparatively small number of unit modular housing cases.

  • PDF

적층식 모듈러주택의 시공 프로세스 분석을 통한 품질관리 중점사항 제안 (Suggestions for Quality Management through Analysis of Construction Process of Multi-layer Modular Housing)

  • 손정락;이동건;방종대;김진원
    • 토지주택연구
    • /
    • 제10권3호
    • /
    • pp.67-75
    • /
    • 2019
  • The modular construction means that more than 70% of the parts such as walls, windows, electrical wiring, facility piping, bathrooms, and kitchen appliances are pre-assembled at the factory and transported to the site. It is possible to shorten the construction period than general construction work and to secure high quality through modular mass production since the modular construction works in the field at the same time as the modular production. However, there are only four domestic modular manufacturers, and each company's modular components and construction methods are different, so it is necessary to standardize them. Therefore, this study investigated the construction process centering on the stacking method of modular housing construction work applied to D site in Cheonan-si, and proposed the key points of quality management by construction stage. As the project was conducted as a pilot project for government R&D projects, some differences may occur from general modular housing construction. However, the construction process and quality control focus of each unit box type modular house analyzed in this study can be used as basic data in the future of modular housing construction. In addition, the results of this study can be used to establish construction standards, such as the development of checklists and establishment of standard processes.

The Current State and Future Directions of Industrial Robotic Arms in Modular Construction

  • Song, Seung Ho;Choi, Jin Ouk;Lee, Seungtaek
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.336-343
    • /
    • 2022
  • Industrial robotic arms are widely adopted in numerous industries for manufacturing automation under factory settings, which eliminates the limitations of manual labor and provides significant productivity and quality benefits. The U.S. modular construction industry, despite having similar controlled factory environments, still heavily relies on manual labor. Thus, this study investigates the U.S., Canada, and Europe-based leading modular construction companies and research labs implementing industrial robotic arms for manufacturing automation. The investigation mainly considered the current research scope, industry state, and constraints, as well as identifying the types and specifications of the robotic arms in use. First, the study investigated well-recognized modular building associations, the Modular Building Institute (MBI), and renowned architecture design magazine, Dezeen to gather industry updates. The authors discovered one university lab and a few companies that adopted Switzerland-based robotic arms, ABB. Researching ABB robotics led to the discovery of ABB's competitor, Germany-based KUKA robotic arms. Consequently, research extended to the companies and labs adopting KUKA models. In total, this study has identified seven modular companies and four research labs. All companies employed robotic arms and gantry robot combinations in a production-line-like system for partial automation, and some adopted design standardization for optimization. The common goal among the labs was to achieve greater flexibility and full automation with robotic arms. This study will help companies better implement robotic arm automation by providing recommendations from investigating its current industry status.

  • PDF

모듈러 건축용 기계설비 시스템 현황 및 개발에 관한 연구 (Present Condition and Development of Mechanical Utility System for Modular Construction)

  • 이재수;최준석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.19-20
    • /
    • 2016
  • Domestic construction industry has experienced many difficulties as it has been on a downward. It's a way that active modular structure market to solve this problem. However, as Modular structure technical standard in Korea is in the early stages, our modular factory maufactured rate is almost 40% lower than overseas. Besides, there is less design diversity so it just applies for a few buildings like low-rise building and general group barrackes. To deal with these problems, it is essential to modulating the equipment which can improve the production rate. This will help to ensure the quality, shortening of the construction period, the reduction of labor costs. We have defined the name of segmented by each installation location of the equipment to modulating equipment. And it was examined the suitability of the modulating of the location-specific utility system. The results of the analysis are discussed on the page.

  • PDF

모듈러 주거시설의 단위유닛 제작품질 확보를 위한 공장제작도서 개선 연구 (Improvement of Manufacturing Drawings for Manufacturing Quality Assurance of Modular Housing Unit)

  • 황현준;정찬우
    • 한국주거학회논문집
    • /
    • 제27권6호
    • /
    • pp.137-144
    • /
    • 2016
  • In modular architecture, manufacturing drawing which includes whole information for modular unit production is essential since works for modular unit have to be performed in manufacturing factory not construction field. Although the manufacturing drawing is important as known it is insufficient to utilize the manufacturing drawing in modular architecture project and this makes modular unit low-quality with re-work and work time delay. To prevent low-quality modular unit caused by insufficient manufacturing drawing, in this research firstly manufacturing drawing's current situation and error cases in manufacturing phase of past modular housing project were analyzed, and correlation between reduction of errors occurance frequency and improving manufacturing drawing was verified. Secondly manufacturing drawing improvement factors were deducted in interior, furniture, mechanical work phase which errors' occurance rate is high and the way of deducting manufacturing drawing lists and contents were suggested with light-weight work as an example in case of new type of errors occurance. A series of research process can contribute to good-quality modular unit by errors reduction. As a result of research, about half of errors occurance can be reduced with suggested manufacturing drawing improvement factors. And the manufacturing drawing process can contribute to modular production which have uniform quality.

모듈러 공장생산 프로세스 개선을 위한 컨베이어시스템 적용 방안 - 공장생산 중심으로 - (To Improve Production Process of the Modular Using the Conveyor System)

  • 배병윤;김경래;차희성;신동우
    • 한국건설관리학회논문집
    • /
    • 제13권5호
    • /
    • pp.103-112
    • /
    • 2012
  • 최근 우리나라가 선진국대열에 들어서고 생활수준이 높아지면서 건설 산업에서는 높은 인건비와 노무자의 부족으로 인해 외국인 노동자의 비중이 점차 늘어나고 있는 실정이다. 모듈러 공법은 전체공정의 50%~90%를 공장에서 제작하여 이것을 운반한 후 현장에서 설치하는 공법으로 현장에서 공정을 최소화하여 공기를 단축하고 품질을 향상시킬 수 있으며, 현장 공기의 단축으로 인건비 절감에 효과적이다. 현재 국내 모듈러는 2003년 신기초등학교를 시작으로 군 병영시설에 확대 적용되고 있지만 모듈러 공법의 장점인 짧은 공사기간과 낮은 비용의 제작은 이루어지지 않는 실정이다. Toyota 자동차 생산방식인 컨베이어시스템 방식을 모듈제작공정에 도입함으로써 자동화생산과 시간, 인력의 소모량을 크게 단축할 수 있고 이에 따라 생산 비용과 품질, 공기 향상으로 시장의 활성화를 기대할 수 있다. 따라서 본 연구는 실제 국내 모듈러 공법 프로젝트를 통하여 공장생산방식의 문제점 해결을 위해 컨베이어시스템 적용방법을 제시하고 적용한 컨베이어시스템의 수익성 분석을 하고자 한다. 제작 모듈의 형태에 따라 다르지만 본 연구의 실험모듈을 기준으로 일일 생산량 7.36개를 기준으로 투자 회수 기간까지 20개월이 소요 된다.

DSM을 활용한 모듈러 건축 설계단계에서의 제작 및 시공 정보 반영 및 재시공 감소 방안 (Design and Planning Process Management for Reducing Rework in Modular Construction Using Dependency Structure Matrix (DSM))

  • 현호상;이현수;이정훈;박문서
    • 대한건축학회논문집:구조계
    • /
    • 제35권2호
    • /
    • pp.29-36
    • /
    • 2019
  • Modular construction has benefits such as short construction duration and high productivity owing to the production in factory and owing to simultaneous on-site work. However, rework occurs in modular construction and the rework affects the efficiency of modular construction. The almost of causes of rework are exist in design process. To reduce the cause of rework, the information flow of the design process should be managed and the plan to reduce rework should be included. However, the modular construction has complex process because of impeded unit production so it is hard to manage the information flow in design process. Moreover, when the plan to reduce rework is included, the design process will be more complicated. Therefore, the objective of this research is to suggest the design process including the rework reduction plan and to alleviate the complexity of design process by using Dependency Structure Matrix(DSM). By using DSM, the iteration and feedback in design process is reduced and it can be expected that rework in modular project can be reduced by using suggested design process.

모듈러 전문 시방서 개발을 위한 체계 구축 (A Study on Development of Owner's Standard Specification Structure for Modular Building)

  • 남성훈;박홍근;김경래
    • 한국건설관리학회논문집
    • /
    • 제20권3호
    • /
    • pp.12-21
    • /
    • 2019
  • 시방서는 공사를 진행함에 있어서 계약의 서류뿐만 아니라 안전한 시공성의 확보와 품질을 향상시킬 수 있는 중요한 서류가 된다. 현재 국내에 모듈러 건축물에 사용하고 있는 시방서는 공사 시방서 밖에 없으며, 대부분의 내용이 건축표준시방서를 그대로 차용하여 사용하고 있어 모듈러 건축물의 작업 내용을 반영하지 못하고 있어 구성내용이 지침서에 가깝다. 국내 모듈러 건축물 시방서의 현 상황은 모듈러 건축물의 품질 저하에 영향을 미치고 있다. 따라서 모듈러 건축물의 모듈러 공정 모니터링을 통한 세부적인 프로세스 분석과 분석된 activity를 가지고 단계별 연관관계를 IDEF모델링을 적용하여 체계적으로 분석하고, 일반화를 통하여 모듈러 건축물에 특화된 전문시방서의 구성체계를 제안하고자 한다. 도출한 대분류는 크게 공장제작, 운송, 현장설치 총 3가지로 나누어지며, 하위 구성체계는 전문가 자문의견을 반영하여 공장제작의 바닥판 조립에서부터 현장설치의 접합부위 마감까지 총 32가지의 공사 항목으로 나누어지는 것으로 도출하였다.