Standard Process and Work Breakdown Structure for Housing Construction Projects using Infill Modular System (인필식 모듈러 공법을 적용한 주택건설공사의 작업분류체계 구축 및 표준 프로세스 제안)

  • Sohn, Jeong Rak;Lee, Dong Gun;Bang, Jong Dae;Kim, Jin Won
    • Land and Housing Review
    • /
    • v.10 no.3
    • /
    • pp.77-87
    • /
    • 2019
  • In Korea, the modular construction method was applied to the construction of facilities such as military barracks and school dormitories, beginning with the pilot project of Seoul New Elementary School in 2003. In 2017, public modular houses were supplied to Busan(Yongho-dong) and Seoul(Gayang-dong), and modular housing is expected to continue to be supplied in the future. However, there is no clear construction standard for the modular housing construction yet, and there are few cases where the infill modular system is applied. Therefore, this study established the work breakdown structure and proposed a standard process focusing on the infill modular system applied to the construction of Dujeong-dong modular house in Cheonan. Level 1 of the work breakdown structure by construction stage of Infill modular was defined as modular manufacturing, assembly, and finishing process. Level 2 was defined as preparation, modular production, modular infill, modular fixing, floor plastering, building finishing, and other site finishing. Level 3 is defined as 57 detailed unit work of infill modular construction. The standard process of infill modular is proposed for the assembly stage that is commonly applicable to infill modular housing construction. The results of this study can be used for the process plan, transportation plan, lifting plan of modular housing construction.

Suggestions for Quality Management through Analysis of Construction Process of Multi-layer Modular Housing (적층식 모듈러주택의 시공 프로세스 분석을 통한 품질관리 중점사항 제안)

  • Sohn, Jeong Rak;Lee, Dong Gun;Bang, Jong Dae;Kim, Jin Won
    • Land and Housing Review
    • /
    • v.10 no.3
    • /
    • pp.67-75
    • /
    • 2019
  • The modular construction means that more than 70% of the parts such as walls, windows, electrical wiring, facility piping, bathrooms, and kitchen appliances are pre-assembled at the factory and transported to the site. It is possible to shorten the construction period than general construction work and to secure high quality through modular mass production since the modular construction works in the field at the same time as the modular production. However, there are only four domestic modular manufacturers, and each company's modular components and construction methods are different, so it is necessary to standardize them. Therefore, this study investigated the construction process centering on the stacking method of modular housing construction work applied to D site in Cheonan-si, and proposed the key points of quality management by construction stage. As the project was conducted as a pilot project for government R&D projects, some differences may occur from general modular housing construction. However, the construction process and quality control focus of each unit box type modular house analyzed in this study can be used as basic data in the future of modular housing construction. In addition, the results of this study can be used to establish construction standards, such as the development of checklists and establishment of standard processes.

Fire Resistant Regulation Status and Activation Plan of Domestic Modular Construction (국내 모듈러 건축의 내화구조 제도 현황 및 활성화 방안)

  • Choi, Yun-Jeong;An, Jae-Hong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.6
    • /
    • pp.673-680
    • /
    • 2022
  • Modular construction is recognized as a construction method with various advantages, such as shortening the construction duration, achieving quality control through factory production, ease of maintenance, and reduced construction costs due to reduced weight of materials. However, despite efforts by the modular industry and government to activate modular construction, it has rarely been established in the domestic market. Currently, there are technical limitations to the modular construction fire resisting technology applied to general buildings. The lack of access to modular construction fire resistance regulation is considered a major factor. In this study, the current status and problems with modular construction fire resistance regulation, a significant hindrance factor, were considered to activate modular construction. This study is intended to present a direction for institutional improvement in modular construction fire resistance and a direction for research and development.

Job Training and Safety Education for Modular Construction using Virtual Reality

  • Choi, Hyeongho;Chae, Jeonghyeun;Kang, Youngcheol
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.63-72
    • /
    • 2023
  • This study investigates the virtual reality (VR) simulation to train construction workers for modular construction. Recently, the construction industry has been experiencing a growing demand for modular construction due to a shortage of labors and an increasing social need for safety. While the demand for modular construction has been increasing, construction labors suffer a basic knowledge regarding modular construction. The users of the simulation, developed by Unity program and Oculus Quest 2, experience the removal of hazardous elements at the location whether the modular unit suspended by a crane is lowered, the lowering and assembly of units through crane operation, and the fall from the roof which is the most frequent accidents in modular construction. The simulation was tested by 15 subjects. The effectiveness of the education was measured through a survey on self-efficacy, perceived usefulness, usability, and presence. It was found that the VR training is suitable for educating on the modular construction activities and safety issues related to them. This study also found that perceived usefulness is the factor that has the greatest impact on self-efficacy. This study can contribute to resolving the labor education issues for the deployment of modular construction.

Basic study for development of bottom-up infill module for high rise building (고층 건축물을 위한 bottom-up Infill module 개발 기초 연구)

  • Sung, Soojin;Lim, Chaeyeon;Na, Youngju;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.164-165
    • /
    • 2015
  • Modular construction technique is an adaptation of factory-based mass production concept in ordinary manufacturing industries to construction industry and it assumes that panels, units, etc. are fabricated in factories and assembled in construction sites. Given its structural limitations, modular construction technique is primarily used in low-story buildings whose maximum height is usually five stories, but researchers are actively studying possible adaptation of modular construction technique to high-rise building designs these days as in the case of infill-type modular construction design. Infill-type modular construction technique, most frequently used in high-rise building construction projects, completes frame construction first in reinforced concrete structures and fills unit modules in such structures. However, infill-type modular construction technique leads to longer construction schedule accompanying increase in construction cost, cost overrun due to additional of temporary work, and possible damage to units in the wake of facility construction. Accordingly, this study is performed as a basic study for the development of bottom-up infill-type modular construction technique intended to construct structural frames and fill in units sequentially in a bid to address such drawbacks of current infill-type modular construction technique.

  • PDF

Development of Project Delivery System for Modular Building in Korea

  • Nam, Sung-hoon;Kim, Kyung-rai;Lee, Dong-gun;Heo, So-young
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.704-705
    • /
    • 2015
  • Recent research has been ongoing for modular buildings in the country, and interest increases. However, in accordance with legal restrictions in the country with regard to Project Delivery system of Modular Building, the activation of modular buildings industry is obstructed. In Korea, in accordance with national contract law, the construction contract is apply to the project delivery system of modular buildings, and in accordance with Framework Act on the Construction Industry, The project delivery system of modular buildings has to be a separate order. The definition of separate order in contract as defined in the law is that the electric work and Communication work and digestion facility work has to be separate each contract in order to be ensured professionalism. In accordance with law, the project delivery system of modular buildings is that the contract for construction is concluded with the Owner and the Construction Contractor and the contract for goods is concluded with the construction Contractor and modular manufacturer. Due to these project delivery system, the domestic factory production rate when making a modular unit is significantly reduced compared to the rate of factory production abroad and the domestic factory production rate is estimated to 10-20%. Due to the factory production rate is also low, despite what can be done at the factory the workload in construction field increases. According to the workload in field increases, the effect of the schedule reduction can be reduced. It resolved to form a consortium with a modular manufacturer and construction companies or the contract is concluded with Owner, modular manufacturer and construction companies in each. In this paper, we propose a specific project delivery system for modular building to solve the problem of the low factory production rate and the problem of schedule reduction. Through this paper, due to the variety of project delivery system on modular buildings is expected to contribute to the activation of modular buildings.

  • PDF

The Practical Application of Modular Construction for Residential Facilities (주거시설로서 모듈러건축 활용화 방안)

  • Kim, Ji-Hyeon;Park, Il-Min
    • Journal of the Korean housing association
    • /
    • v.24 no.3
    • /
    • pp.19-26
    • /
    • 2013
  • The purpose of this research is to provide basic data for the promotion strategy to activate modular construction system as residential facilities, through a study on the architectural planning, institutions and policies and research on connection details, for the use as residential facilities of the modular construction that is not actively supplied for the general residential facilities. As a result, I suggest sample model plan of domestic and foreign case analysis and characteristic of modular construction and practical application of modular construction for Residential Facilities. Owing to many advantages including short construction period structural stability and economic benefits, modular construction is expected to play a role as residential alternative of socially controversial affordable housing and weekend homes, and potential housing shortage after reunification; and to contribute to the development of design automation and industrialized constructions. Though Korea is still lacking development of the system that meets the domestic context, if supported by ongoing researches on the development of construction methods, materials and details, the settlement of appropriate modular residential facilities to suit the national situation will serve a possible alternative solution for many housing and environmental problems.

BIM Application Method for the Quality Management of Modular Houses (모듈러주택 품질관리를 위한 BIM 적용 방안)

  • Lee, Dong Gun;Kim, Jin Won;Sohn, Jeong Rak
    • Land and Housing Review
    • /
    • v.10 no.2
    • /
    • pp.59-67
    • /
    • 2019
  • The recent paradigm shift in the construction industry has led to a growing demand for industrial construction. In particular, interest in modular housing, one of the areas of industrialization architecture, is soaring. Modular housing is a construction method for completing a building by transporting factory-built modules to the site and assembling them. However, modular housing in Korea has various problems such as errors in design books, lack of factory drawings, and lack of on-site construction plans. BIM is a tool for accumulating, producing and managing various information through 3D models and is a solution to solve various problems of modular housing. In this study, problems of modular housing and BIM utilization of modular housing were presented as ways to ensure the quality of modular housing. Therefore, this study analyzed the problems that are occurring in the construction process of modular housing. And, to address the problem of modular housing, BIM utilization measures were proposed for each modular process step. However, the application of BIM in domestic modular project is currently being carried out in pilot research project. Because of this, the BIM utilize method for modular housing is limited based on the BIM use for general projects and the examples for some modular pilot projects.

An Analysis on Architectural Characteristics of Domestic Modular Housing and Building Material Standardization Effect through MC Design (국내 모듈러 주택의 특성 및 MC 설계를 통한 건축자재 표준화 효과 분석)

  • Lee, Chang-Jae;Lim, Seok-Ho
    • Journal of the Korean housing association
    • /
    • v.26 no.6
    • /
    • pp.103-113
    • /
    • 2015
  • Modular construction is a process in which a building is produced off-site in module boxes using standard materials. Since the introduction of prefabrication in building construction, Modular Coordination (MC) has become an essential design tool in building design and construction. However, in Korea, the design standardization has not been adequately applied to modular construction. This study intends to analyze the current status of modular construction in Korea and explore the applicability of MC design in the construction industry. The analysis of the current status of MC design within Korean four major modular construction companies indicates that an incremental dimension is not properly used in horizontal planning modules, which results in a problem of increasing construction cost by high material loss rate. But, in vertical planning modules, a incremental dimension of 100 mm (1 M) is found to be used although the structural system varies among manufacturers, which demonstrates the potential for an open system to be well applied in modular construction, despite different structural systems.

Establishment of Standard Construction Process of the Infill Modular Construction System (인필 모듈러 건설시스템의 표준 시공프로세스 구축)

  • Kim, Chang-Han;Jung, Chan-Woo;Kim, Hyeong-Su;Hwang, Hyun-Jun;Han, Jae-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.245-246
    • /
    • 2012
  • Lately the Infill Modular Construction System which meets the domestic standards about the structure and fireproof performance and which is applied to the remodeling techniques is being emphasized. In order to introduce the Infill Modular Construction System to domestic market successfully, the development of insufficient element technologies and systematic analysis of process should be preceded. This research aims to establish of Standard Construction Process, as advanced research for the settlement of the Infill Modular Construction System. As advanced research for the activation of the Infill Modular Construction System, this research aims to develop Infill Unit Module's mobile device. This is expected to improve work efficiency. In addition organizing optimized Standard Construction Process by steady work analysis and improvement is being planned.

  • PDF