• Title/Summary/Keyword: Model tunnel test

Search Result 869, Processing Time 0.028 seconds

Evaluation of Non-linear FEM Tunnel Analysis by using Hoek-Brown반s Insitu Rock Model (Hoek-Brown 암반모델을 이용한 비선형 유한요소 터널해석 및 평가)

  • Lee, Bong-Yeol;Kim, Gwang-Jin;Kim, Hak-Mun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1994.09a
    • /
    • pp.235-246
    • /
    • 1994
  • At pre-construction design stage, most of the design data are based on the site investigation results or property estimation which often does not provide satisfactory output for the tunnel analysis. Nonlinear FEM tunnel analysis was cariied out by Hoek-Brown model which is principly semi-empirical design method based on insitu rock descriptions, rock test results as well as field measurement data. The results of the analytical methods from Hoek-Brown model and Mohr-Coulomb model are compared with the sige measurement data from two-NATM tunnel construction sites. It was found that the Hoek-Brown model can be satisfactorily adopted as a feed back analysis technique in order to examin the safety of NATM tunnel at any construction stage.

  • PDF

Wind tunnel test research on aerodynamic means of the ZG Bridge

  • He, Xiangdong;Xi, Shaozhong
    • Wind and Structures
    • /
    • v.2 no.2
    • /
    • pp.119-125
    • /
    • 1999
  • The ZG Bridge(preliminary design), with unfavorable aerodynamic stability characteristics, is a truss-stiffened suspension bridge, its critical wind speed of flutter instability is much lower than that of code requirement, In the present paper, based on both aerostatic and aeroelastic section model wind tunnel test, not only effects of some aerodynamic means on aerodynamic stability of its main girder are investigated, but also such effective aerodynamic means of it as flap and plate-like center stabilizer are concluded.

Effect of orientation of fracture zone on tunnel behavior during construction using model test (실내 모형실험을 통한 시공 중 파쇄대의 공간적 분포가 터널거동에 미치는 영향)

  • Cho, Yun-Gyu;Shin, Seung-Min;Chung, Eun-Mok;Choi, Jung-Hyuk;Yoo, Chung-Sik
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.3
    • /
    • pp.189-204
    • /
    • 2015
  • This paper presents the results of reduced scale model tests on the effect of fault zone characteristics on the tunnel deformation behavior. A series of model tests were carried out on deep tunnels considering different fault zone orientations and offset distance. The tunnelling process was simulated in the model tests using compressed air technique. During the tests, the tunnel and ground deformation were mainly monitored while reducing the pressure inside the tunnel and the relationship between the pressure level and the tunnel deformation were established. The results indicate that for a given offset distance the tunnel behavior is influenced the most when the fault zone dips vertically while smallest influence occurs when the fault zone dips 45 degrees.

Assessment of pull-out behavior of tunnel-type anchorages under various joint conditions

  • Junyoung Ko;Hyunsung Lim;Seunghwan Seo;Moonkyung Chung
    • Geomechanics and Engineering
    • /
    • v.36 no.1
    • /
    • pp.71-81
    • /
    • 2024
  • This study analyzes the pull-out behavior of tunnel-type anchorage under various joint conditions, including joint direction, spacing, and position, using a finite element analysis. The validity of the numerical model was evaluated by comparing the results with a small-scaled model test, and the results of the numerical analysis and the small-scaled model test agree very well. The parametric study evaluated the quantitative effects of each influencing factor, such as joint direction, spacing, and position, on the behavior of tunnel-type anchorage using pull-out resistance-displacement curves. The study found that joint direction had a significant effect on the behavior of tunnel-type anchorage, and the pull-out resistance decreased as the displacement level increased from 0.002L to 0.006L (L: anchorage length). It was confirmed that the reduction in pull-out resistance increased as the number of joints in contact with the anchorage body increased and the spacing between the joints decreased. The pull-out behavior of tunnel-type anchorage was thus shown to be significantly influenced by the position and spacing of the rock joints. In addition, it is found that the number of joints through which the anchorage passes, the wider the area where the plastic point occurs, which leads to a decrease in the resistance of the anchorage.

A Study on the Gap Parameter in Sand by Scale Model Test (축소모형실험을 통한 사질토지반에서 Gap Parameter의 연구)

  • Kim, Sang-Hwan;Kang, Jun-Gu;Seo, Yun-Sik
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1343-1349
    • /
    • 2010
  • This paper presents the behavior of the soil based on the Gap Parameter during the Shield TBM tunnel excavation in sandy soil. This study reproduced the tunnel before and after the excavation according to the diameter of the tunnel, water ratio and depth to execute a Scaled Model Test and analyzed the behavior change of the upper soil. As a result, tunneling after for soil stress decreased was similar in all the Case. In addition, the soil stress decreased was in water ratio increases.

  • PDF

The High-speed train model for reducing the micro-pressure wave in railway tunnel (고속철도 터널에서의 미기압파 저감을 위한 모형실험)

  • Jang, Yong-Jun;Park, Won-Hee;Kim, Seung-Tae
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1330-1336
    • /
    • 2007
  • The purpose of the study was to verify deduction of each coefficient necessary to analysis on micro-pressure waves and reliability of the analysis result. The tunnel running train model testing device used in the test was manufactured by scale of 1:60 and the study used a train model with ten cars long according to specifications of KTX model. The study applied tunnels with cross sections of $107.9m^3\;and\;95.1m^3$ and applied tunnel extensions with 1km, 0.75km and 0.5km. Also, the study tested train speed by changing it into 275, 300, 325 and 350km/h. The test device was a hydraulic launch system composed of a train model, a hydraulic launcher, a tunnel model and a brake. The study measured speed of a model trainby a speed sensor installed in the point of each 1.2m from the front of tunnel entrance and a pithead of tunnel exit and measured pressure change of internal tunnel continuously by installing pressure sensors in the entrance part of tunnel, in the middle part of tunnel and in the exit part of tunnel. As the result of the measurement, it was known that pressure slope of pressure wave happened in the entrance part of tunnel was increased by a nonlinear effect while spreading the tunnel or its pressure slope was reduced by diffusion. Also, the study compared and analyzed micro-pressure waves happened in the exit part of the tunnel by installing each kind of hoods in the entrance part of the tunnel to prevent reduction of micro-pressure waves.

  • PDF

Evaluation on Tunnel in Uncontinuous Rock Mass by Small-Scale Model Tests (축소모형실험에 의한 불연속면 암반에서의 병설터널 적용성 평가)

  • Kim, Hong-Taek;Yoo, Chan-Ho;Hwang, Jung-Soon;Yoon, Hyun-Don
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.181-188
    • /
    • 2008
  • In this study, estimation of behavioral characteristics between twin tunnels was performed through the series of laboratory experiment on the small scale tunnel model. In the model test, the experimental parameters were geological conditions, center to center distance between twin tunnels, application of discontinuous inclination. To estimated behavior of pillar and load-displacement relationship by model tests and numerical analyses.

  • PDF

A Study on Numerical Analysis for GPR Signal Characterization of Tunnel Lining Cavities (터널 라이닝 공동에 대한 GPR 신호 특성 분석을 위한 수치해석 연구)

  • Go, Gyu-Hyun;Lee, Sung Jin
    • Journal of the Korean Geotechnical Society
    • /
    • v.37 no.10
    • /
    • pp.65-76
    • /
    • 2021
  • There is a possibility of cavities occurring inside and behind the lining of an aged tunnel structure. In most cases, it is not easy to check the cavity because it exists in a place where visual inspection is impossible. Recently, attempts have been made to evaluate the condition of the tunnel lining and the backfill materials using non-destructive tests such as Ground Penetrating Radar, and various related model tests and numerical analysis studies have been conducted. In this study, the GPR signal characteristics for tunnel lining model testing were analyzed using gprMax software, which was compared with model test results. The numerical model applied to the model test reasonably simulated the electromagnetic wave signal according to the change of the material such as tunnel lining and internal cavity. Using the verified GPR model, B-scan data for the development of the GPR signal analysis technique were obtained, which can evaluate the thickness of the tunnel lining, the presence of the cavity, the effect of the waterproof membrane, and the frequency band.

Investigation on the Behavior of Tunnel Face Reinforced with Longitudinal Reinforcements using Reduced-Scale Model Tests (모형실험에 의한 수평보강재로 보강된 터널 막장의 거동 분석)

  • Yoo, Chung-sik;Shin, Hyun-Kang
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.2 no.2
    • /
    • pp.32-40
    • /
    • 2000
  • This paper presents the results of a parametric study on the behavior of tunnel face reinforced with horizontal pipes. A series of reduced-scale model tests was carried out to in an attempt to verify previously performed three-dimensional numerical modeling and to investigate effects of reinforcement layout on the tunnel face deformation behavior. The results of model tests indicate that the tunnel face deformation can significantly reduced by pre-reinforcing the tunnel face with longitudinal members and thus enhancing the tunnel stability. In addition, the model tests results compare fairly well with those from the previously performed three-dimensional finite element analysis. Therefore, a properly calibrated three dimensional model may effectively be used in the study of tunnel face reinforcing technique.

  • PDF

A Fundamental Study on the Underground Excavation using by Slit Method(I) (Slit공법을 이용한 지하공동 굴착에 관한 기초적 연구(I))

  • 이희성;윤지선
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.93-100
    • /
    • 2000
  • In this study, we used photoelastic coating method which is a kind of model test for examining the stress condition of rock masses around underground structures. Using this method, we could know adaptability and usefulness of photoelastic coating method for various shape of tunnel models. And, in spite of higher cross section efficiency, square shape model showed unstable status because of high stress concentration. So, we cut the slits at the each corner of tunnel, and we could make more stable stress condition by means of moving high stress concentration to rock mass.

  • PDF