Sri Lanka has strongly understood the importance of mitigation of climate change and various measures have been taken. To tackle the climate change, after ratifying Paris Agreement, Sri Lanka has pledged to reduce her greenhouse gas emission in the energy sector by 20% (16% unconditional and 4% conditional) by 2030 based on the BAU scenario. Simultaneously, the government introduced its new energy policy and strategies in 2019 with a vision of achieving carbon neutrality by 2050. This paper survey related key government documents, policies, reports, and academic articles to investigate opportunities for the private sector to invest large scale solar power deployment (10 MW or above) and to get support from climate finance under article 6 of the Paris Agreement. It has found, growing concern on the environment, energy security issues and increase import expenses for fossil fuels are the main influencing factors to move renewable sources. Further, government investment and FDI both have gradually decreased in the energy sector. Therefore, an alternative financing mechanism is needed. Although the private sector allowed investing in the energy sector since 1996 with the introduction of IPP (Independent Power Producers), it could not make considerable progress on involving large scale solar utility projects. This has revealed government policy is not aligning with the long term generation plan of the electricity sector. The study has also found, it needs more strategic road map, coordination with different institutions, monitoring system to enhance large scale solar contribution.
Proceedings of the Korea Contents Association Conference
/
2006.05a
/
pp.347-350
/
2006
Regional construction management offices and local administrations have set up the fundamental plan for river improvement works respectively for the national level, and local 1st and 2nd level rivers for the purpose of river management, use, development, disaster mitigation, and water quality conservation on the annual basis. Enormous number of reports and river registers have been produced. However, the products before 2003 are not well managed so that frequent users have toubles in using these information. In this paper, Information Service System on the Fundamental Planning Report for River Improvement Works developed in 2005 is introduced.
Global climate change becomes one of the most serious environmental problems over the world. There is growing recognition thai climate change education, especially for children is important. However, there have been few programmes, curricula, teachers' training chances, and teaching-learning materials for climate change education so far. Therefore, we analyse the world wide web(web) contents in Korea which are available for climate change education, providing fundamental data in developing educational contents for climate change, as well as helping users to search appropriate contents for climate change education. Subjects for this study are 10 web sites of public institutions related to climate change in Korea. The web contents are evaluated in terms of diversity, accuracy, authenticity and the ease of use. The key finding in this study is that the majority of the contents are focused on how to respond to the problem, especially mitigation and also we find that most of the web sites provide text-types of lesson plan and video-types. Consequently, it would be necessary to develop various web contents for climate change education in both quality and quantity aspects.
Proceedings of the Korean Environmental Health Society Conference
/
2003.06a
/
pp.26-26
/
2003
During the Viet Nam war, A Luoi located in Thua Thien Hue Province was heavily sprayed herbicides by the Ranch Hand Operation of U.S.A force (549.274 gallons). After 30 years of knocking the operation off, Dioxin has still contaminated on environment and human body in A Luoi valley. The results of the study show that there is an epidemiological relationship between AO/Dioxin exposure and increasing rate of reproductive anomalies and birth defects (the rate of reproductive anomalies including congenital deformities after the war during 10-year and 25-year is higher than that before the war from 1.5 to 4 times). The study found that the highest rate of reproductive anomalies is spontaneous abortion. The average is premature death and congenital deformities, and the lowest rate is dead foetus and hydratidiform mole. The results of the primary assessment suggested that Dioxin transport from environment to human body through the food chain exposed by Dioxin such as fish, chicken, duck. A mitigation plan for residual dioxin contamination from Agent Orange Hervicides is requeste indispensable to inhabitants in Aluoi District.
In this paper, an environmental assessment was carried out on the whole process of industrial business activities to establish a basic plan for climate change mitigation and energy independency. The whole process was divided into each discharge process in terms of water, air, solid waste, green house gases and refractory organic compounds. The flowcharts and basic unit of process were analysed for three years (2008-2010), being utilized as basic information for the life cycle assessment. It was found that the unit loading for the whole process significantly depends on changes in the operation rate change and highly concentrated wastewater inflow. About 35% of solid waste production was reduced by improving the incineration method with co-combustion in coal boiler, generating about 57% of electricity used for the whole process, and consequently reducing the energy costs. As the eco-efficiency index was found to be more than 1, compared to the previous years, it can be said that improvement in general has taken place.
Due to the recent uncertainty of market situations such as the escalation of petroleum prices, increased production capacities of plants, limitations of the available EPC (Engineering, Procurement, Construction) contractors, and the increase of raw material prices, EPC contractors have had a tendency to include a higher reserve contingency in the lump-sum turnkey contract price. In order to overcome the changes in the market, the plant project construction industry has started to apply the converted lump-sum turnkey contract in plant construction market. This study was focused to find the associated risks and to analyse the identified risks on recent trend of application of the new contract type, which is the converted lump-sum turnkey contract. It was recognized from the analysis that quality and cost have more high priority risks than other project objectives. This paper also suggests the mitigation plan for identified risks to achieve project objectives appropriate to the converted lump-sum turnkey project from the viewpoint of an EPC contractor keeping transparency with owner.
Kim, Youngjin;Jeon, Jonggil;Kim, Minyoung;Choi, Yonghun
Journal of Agricultural Extension & Community Development
/
v.23
no.4
/
pp.361-374
/
2016
This study examined the regulation status on wastewater treatment in agro-food processing and a case study on effluent treatment m ethods was carried out to evaluate any change after the mitigation of regulation. First, in order to clarify the area of investigation, the definition of small-scale agro-processing facilities was reviewed through literature survey and local government ordinance. The current law were separately analyzed into four areas; effluent treatment facilities, development of agro-processing industries, land use and food processes equipment. The exclusion clauses on wastewater discharging facility in the enforcement regulation were defined in detail, which can be served in practice. Site survey, after the questionnaire survey of the person in charge of the local unit, was carried out. As the result, this survey confirmed the positive effects of the deregulation on promoting sewer system service in rural areas, introducing the new processing construction and so on. In addition, it was found that some matters to be considered to determine whether to introduce wastewater treatment plan for public food processing facilities.
Journal of the Korean Regional Science Association
/
v.13
no.2
/
pp.143-155
/
1997
This study aims at drawing implications for Korea's urban growth management policies from U.S.A's experience on this issue. This study analyzes two types of contradictions in planning and implementing urban growth management policies: 1) value conflicts in goal setting and 2) contradictions among different level of governments (local, province, nation). As mentioned by Campbell (1996), there are three types of conflicts in objective values (efficiency, equity, and environment protection): property contradiction between economic growth and equity, resource conflict between efficiency and environment protection, and development conflict between equity and environment protection in urban growth management policies. In implementing urban growth management three types of conflicts in goal values should been taken into consideration. Contradictions among local governments, province, and central government are also found in implementing growth management policies. The lessons from the United State are as follow: 1) growth management plans are initiated by the local government and during the planning process adjacent local governments review a local government's growth management plans and give inputs for the plan, 2) local government and State work together for growth management planning and specially, the State provides technical and financial assistance to local government, and 3) the State plays leading roles in local government's planning and implementing of growth management policies with carrot and stick policy.
While microseismicity induced by hydraulic stimulation carried out for EGS is useful means in estimating the range of permeability increase, it also affect surface structures and environments. In order to establish a mitigation plan for microseismicity triggered by hydraulic stimulation, we reviewed world-wide guidelines on the impact of ground vibration on the surface structure and human environment by blasting. Case studies from Europe and USA on the microseismicity by hydraulic stimulation are presented and suggestions are made for the guidelines on ground vibration by hydraulic stimulation for the ongoing Pohang EGS project.
This paper deals with system thinking in the resilience of the SES (Social-Ecological Systems) around Mt. Gariwang, located in Jeongseon County, Gangwon Province, in particular with the disturbance that a new ski slope is planned to be built for the PyeongChang 2018 Winter Olympic. It first performs a literature survey and newspaper article search to summarize the controversy with regards to credible environmental and socio-economical impacts of the plan, and then elaborates a series of CLDs (Causal Loop Diagrams) to infer the dynamics of the impacts. The results imply that the natural restoration seems to be hard because the development activities can cause a great deal of damage to the ecosystem mainly due to soil degradation and the mitigation of icy valley effects with water exploitation for making artificial snow and so on. Moreover most of the households near the planned site seem to leave with land compensation, thus more policy efforts are needed to enhance the resilience of the ecosystem and the nearby society based on ecotourism.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.