• 제목/요약/키워드: Mining project

Search Result 160, Processing Time 0.022 seconds

A Review of Magnetic Exploration in Korea (한국의 육상 자력탐사)

  • Park, Yeong-Sue
    • Economic and Environmental Geology
    • /
    • v.39 no.4 s.179
    • /
    • pp.403-416
    • /
    • 2006
  • Magnetic method is rapid, cheap and simple geophysical exploration technique, and has wide range of applications such as resources prospecting, geological structure investigation and even geotechnical and environmental problems. Especially, aeromagnetics gives fundamental and useful geoscientific data fnr not only assessment of potential resources, but also national land planning. Magnetic method, perhaps the oldest geophysical technique, was relatively early introduced into Korea. Documents during Japanese occupation says that magnetic method was used for exploring metallic ore deposits and hot spring, and that a geomagnetic observatory was operated. From mid 1950's, after Korean War, magnetic explorations for natural resources such as metallic ore, uranium, coal, and groundwater were intensively executed for industrialization. Apache aeromagnetic survey project during $1958{\sim}1959$ and its ground follow-up surveys are typical and important cases in those days. Magnetic survey techniques were rapidly advanced during 1970's and 1980's with improvements of instruments, growth of geophysical manpower, and availability of computers. The national aeromagnetic mapping project by KIGAM in 1981 showed the improved technical capability of those days. Decline of mining industry since mid 1980's moved the exploration objects from traditional resources to new ones such as groundwater and geothermal resources, and applications to investigation of geological structure were revived. Recently appeared applications such as natural hazard assessment, and engineering and environmental studies increased the magnetic method's utility in the realm of exploration.

Pre-grouting for CHI of EPB shield TBM in difficult grounds: a case study of Daegok-Sosa railway tunnel (복합지반 EPB TBM 커터교체를 위한 그라우팅 수행 사례)

  • Kang, Sung-Wook;Chang, Jaehoon;Lee, Jae-Won;Kim, Dae-Young;Shin, Young-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.5
    • /
    • pp.281-302
    • /
    • 2021
  • Railway projects have been consistently increasing in Korea. In relation to this trend, the mechanized tunneling using Tunnel Boring Machine (TBM) is preferably applied for mining urban areas and passing under rivers. The TBM tunneling under difficult grounds like mixed faces with high water pressure could require ground improvements for stable TBM advance or safe cutter head intervention (CHI). In this study, pre-grouting works for CHI in Daegok-Sosa railway project are presented in terms of the grouting zone design, the executions and the results, the lessons learned from the experience. It should be mentioned that the grouting from inside TBM was carried out several times and turned out to be inefficient in the project. Therefore, grouting experiences from the surface are highlighted in this study. Jet grouting was implemented on CHI points on land, while permeation grouting off shore in the Han River, which mostly allow to access the cutter head of TBM in free air with stable faces. The results of CHI works have been analyzed and the lesson learned are suggested.

Bibliometric Analysis on the Research Trends in Journal of Convergence for Information Technology (중소기업융합학회 수록 논문의 연구동향에 대한 계량서지학적 분석)

  • Kim, Shin-Hee
    • Journal of Convergence for Information Technology
    • /
    • v.10 no.7
    • /
    • pp.122-130
    • /
    • 2020
  • The purpose of this study is to identify current states and trends of convergence researches by conducting a bibliometric analysis of the papers in the Convergence Society for SMB. After 792 papers from 2012 to 2019 were collected, we analyzed network analysis by using centrality through extracting of nouns and compound nouns with text mining and 3 times of pre-processing and purification processing. According to the results, first, quantitative and qualitative aspects of the researches since 2016 improved, studies focused on words such as influence, convergence, mediating effect, satisfaction, and effect. Second, in the first half (2012-2015), engineering and technical studies were intensively conducted based on topics such as information, system, and security. Third, in the period of the second half (2016-2019), the research scope was expanded to college students, parents, teenagers under the topics of job, self-efficacy, education, satisfaction, depression, and stress. The results of this study are meaningful in identifying existing research trends and in providing information which requires the expansion of new research areas.

EST Knowledge Integrated Systems (EKIS): An Integrated Database of EST Information for Research Application

  • Kim, Dae-Won;Jung, Tae-Sung;Choi, Young-Sang;Nam, Seong-Hyeuk;Kwon, Hyuk-Ryul;Kim, Dong-Wook;Choi, Han-Suk;Choi, Sang-Heang;Park, Hong-Seog
    • Genomics & Informatics
    • /
    • v.7 no.1
    • /
    • pp.38-40
    • /
    • 2009
  • The EST Knowledge Integrated System, EKIS (http://ekis.kribb.re.kr), was established as a part of Korea's Ministry of Education, Science and Technology initiative for genome sequencing and application research of the biological model organisms (GEAR) project. The goals of the EKIS are to collect EST information from GEAR projects and make an integrated database to provide transcriptomic and metabolomic information for biological scientists. The EKIS constitutes five independent categories and several retrieval systems in each category for incorporating massive EST data from high-throughput sequencing of 65 different species. Through the EKIS database, scientists can freely access information including BLAST functional annotation as well as Genechip and pathway information for KEGG. By integrating complex data into a framework of existing EST knowledge information, the EKIS provides new insights into specialized metabolic pathway information for an applied industrial material.

The Study on Synthesis Gas Characteristics Following Different Injection Condition of Oxidizing Agent Through Simulation of Underground Coal Gasification (지중 석탄가스화 공정 시뮬레이션을 통한 산화제 주입조건에 따른 합성가스 특성에 대한 연구)

  • Jang, Dong-Ha;Yoon, Sang-Phil;Kim, Hyung-Taek;Kim, Jeong-Gyoo;Cho, Won-Jun;Ju, Woo-Sung;Lee, Jin-Wook;Lee, Chan
    • Journal of the Korean Institute of Gas
    • /
    • v.17 no.5
    • /
    • pp.28-36
    • /
    • 2013
  • The underground coal which is buried in the ground will have a lot of attention to overcome energy crisis as an energy resources standpoint. Many studies of underground coal gasification have been also conducted because of its advantage which does not require mining. In this study, the simulation of underground coal gasification process was carried out with Aspen Plus. This study was executed by Rock Mountain 1 Underground Coal Gasification project in the United States in the late 1980s as a reference. Sensitivity analysis proceeded to investigate synthesis gas characteristics following different injection condition of oxidizing agent. The underground coal gasification model has been implemented. That is divided into drying, pyrolysis, char gasification and the simulation results was confirmed by the production gas flow, yield of synthesis gas and amount of gasified carbon from results of the actual experimental data.

A Technique to Detect Change-Coupled Files Using the Similarity of Change Types and Commit Time (변경 유형의 유사도 및 커밋 시간을 이용한 파일 변경 결합도)

  • Kim, Jung Il;Lee, Eun Joo
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.3 no.2
    • /
    • pp.65-72
    • /
    • 2014
  • Change coupling is a measure to show how strongly change-related two entities are. When two source files have been frequently changed together, they are regarded as change-coupled files and they will probably be changed together in the near future. In the previous studies, the change coupling between two files is defined with the number of common changed time, that is, common commit time of the files. However, the frequency-based technique has limitations because of 'tangled changes', which frequently happens in the development environments with version control systems. The tangled change means that several code hunks have been changed at the same time, though they have no relation with each other. In this paper, the change types of the code hunks are also used to define change coupling, in addition to the common commit time of target files. First, the frequency vector based on change types are defined with the extracted change types, and then, the similarity of change patterns are calculated using the cosine similarity measure. We conducted experiments on open source project Eclipse JDT and CDT for case studies. The result shows that the applicability of the proposed method, compared to the previous studies.

Numerical analysis and fluid-solid coupling model test of filling-type fracture water inrush and mud gush

  • Li, Li-Ping;Chen, Di-Yang;Li, Shu-Cai;Shi, Shao-Shuai;Zhang, Ming-Guang;Liu, Hong-Liang
    • Geomechanics and Engineering
    • /
    • v.13 no.6
    • /
    • pp.1011-1025
    • /
    • 2017
  • The geological conditions surrounding the Jijiapo Tunnel of the Three Gorges Fanba Highway project in Hubei Province are very complex. In this paper, a 3-D physical model was carried out to study the evolution process of filling-type fracture water inrush and mud gush based on the conditions of the section located between 16.040 km and 16.042 km of the Jijiapo Tunnel. The 3-D physical model was conducted to clarify the effect of the self-weight of the groundwater level and tunnel excavation during water inrush and mud gush. The results of the displacement, stress and seepage pressure of fracture and surrounding rock in the physical model were analyzed. In the physical model the results of the model test show that the rock displacement suddenly jumped after sustainable growth, rock stress and rock seepage suddenly decreased after continuous growth before water inrushing. Once water inrush occured, internal displacement of filler increased successively from bottom up, stress and seepage pressure of filler droped successively from bottom up, which presented as water inrush and mud gush of filling-type fracture was a evolving process from bottom up. The numerical study was compared with the model test to demonstrate the effectiveness and accuracy of the results of the model test.

Modeling of a rockburst related to anomalously low friction effects in great depth

  • Zhan, J.W.;Jin, G.X.;Xu, C.S.;Yang, H.Q.;Liu, J.F.;Zhang, X.D.
    • Geomechanics and Engineering
    • /
    • v.29 no.2
    • /
    • pp.113-131
    • /
    • 2022
  • A rockburst is a common disaster in deep-tunnel excavation engineering, especially for high-geostress areas. An anomalously low friction effect is one of the most important inducements of rockbursts. To elucidate the correlation between an anomalously low friction effect and a rockburst, we establish a two-dimensional prediction model that considers the discontinuous structure of a rock mass. The degree of freedom of the rotation angle is introduced, thus the motion equations of the blocks under the influence of a transient disturbing force are acquired according to the interactions of the blocks. Based on the two-dimensional discontinuous block model of deep rock mass, a rockburst prediction model is established, and the initiation process of ultra-low friction rockburst is analyzed. In addition, the intensity of a rockburst, including the location, depth, area, and velocity of ejection fragments, can be determined quantitatively using the proposed prediction model. Then, through a specific example, the effects of geomechanical parameters such as the different principal stress ratios, the material properties, a dip of principal stress on the occurrence form and range of rockburst are analyzed. The results indicate that under dynamic disturbance, stress variation on the structural surface in a deep rock mass may directly give rise to a rockburst. The formation of rockburst is characterized by three stages: the appearance of cracks that result from the tension or compression failure of the deformation block, the transformation of strain energy of rock blocks to kinetic energy, and the ejection of some of the free blocks from the surrounding rock mass. Finally, the two-dimensional rockburst prediction model is applied to the construction drainage tunnel project of Jinping II hydropower station. Through the comparison with the field measured rockburst data and UDEC simulation results, it shows that the model in this paper is in good agreement with the actual working conditions, which verifies the accuracy of the model in this paper.

A Study on Improvement of Pension Operation and Management using Big Data Analysis Techniques (빅데이터 분석기법을 활용한 숙박업체 운영 개선 방안에 대한 연구)

  • Yoon, Sunhee
    • The Journal of the Convergence on Culture Technology
    • /
    • v.7 no.4
    • /
    • pp.815-821
    • /
    • 2021
  • The advantage of big data is to collect a large amount of data on the Internet and refine and use valuable data. That is, the unstructured data is processed so that the user can analyze and utilize it from a necessary point of view. This paper is a relatively small project and is based on unstructured data that can be closely applied to real life and used for marketing. The subjects of the experiment were modeled on lodging companies in the Seoul metropolitan area an hour away from Seoul, and analyzed for the increase in lodging rates before and after marketing using big data. As an experiment that shows the effects of increasing sales, reducing costs, and increasing returns by users, we propose a system to determine and filter whether data input in the process of analyzing big data such as social networks can be used as accommodation-related information.

Selection of Key Management Targets for Claim Causes through Relational Analysis on the Causes of Change Order Claims

  • Min, Kwang-Ho;Ko, Gun-Ho;Jin, Chengquan;Hyun, Chang-Taek;Han, Sang-Won
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.281-290
    • /
    • 2017
  • As various stakeholders are involved in construction projects, disputes between the parties are more likely to occur, which is a very important issue for the participants in the projects. Claims in construction projects, however, are very complex and thus difficult to manage. In particular, as the cause of a claim in the preceding stage that has not been resolved in a timely manner has an effect on the cause of a claim in the following stage, it is difficult to find a point of compromise regarding a claim caused by the relationship between the causes that occur in the preceding and following stages. In this regard, this study sought to examine the rules for the generation of change order claims, which occur most frequently among the construction claims, and thus to select the key management targets through the analysis of the relationship between the causes of claims arising in the preceding and following stages for the efficient management of claims. It is expected that the use of rules for the generation of change order claims as well as of representative and similar cases will help the construction practitioners in judging claims, considering the relationships among the causes of the claims. Meanwhile, in this study, association analysis was conducted regarding the causes of the occurrence of change order claims in a design-build delivery method, and therefore, it is necessary to verify the effectiveness of the method when applied to other delivery methods.

  • PDF