Transmission System Expansion Planning by Nodal Delivery Marginal Rate Criterion -II (모선수송전달능력(母線輸送傳達能力) 신뢰도 기준에 의한 송전계통(送電系統)의 광역설계(擴充計劃) -II)

  • Park, Jeong-Je;Shi, Bo;Jeong, Sang-Hun;Choi, Jae-Seok;Mount, Timothy;Thomas, Robert
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.574-575
    • /
    • 2007
  • This paper proposes a method for choosing the best transmission system expansion plan using nodal/bus delivery marginal rate criterion ($BMR_k$) defined newly in this paper. The objective method minimizes a total cost which is an investment budget for constructing new transmission lines subject to the $BMR_k$ which means a nodal deterministic reliability level requirement at specified load point. The proposed method models the transmission system expansion problem as an integer programming problem. It solves for the optimal strategy using a branch and bound method that utilizes a network flow approach and the maximum flow-minimum cut set theorem. Test results on an existing 21-bus system are included in the paper. It demonstrated the suitability of the proposed method for solving the transmission system expansion planning problem in competitive electricity market environment.

  • PDF

A Basic Study on Composite Power System Expansion Planning Considering Probabilistic Reliability Criteria

  • Choi, Jae-Seok;Tinh, TranTrung;Kim, Hyung-Chul;El-Keib, A.;Thomas, R.;Billinton, R.
    • Proceedings of the KIEE Conference
    • /
    • 2004.11b
    • /
    • pp.297-300
    • /
    • 2004
  • This paper proposes a method for choosing the best composite power system expansion plan considering probabilistic reliability criterion. The proposed method was modeled as the minimization of the investment budget (economics) for constructing new transmission lines subject to not only deterministic(demand constraint) but also probabilistic reliability criterion(LOLE) with considering the uncertainties of the system elements. This is achieved by modeling the power system expansion problem as an integer programming one. The method solves for the optimal strategy using a probabilistic theory based branch and bound method that utilizes a network flow approach and the maximum flow-minimum cut set theorem. Although the proposed method is applied to a simple sample study, the test results demonstrate a fact that the proposed method is suitable for solving the power system expansion planning problem subject to practical uncertainties for future.

  • PDF

A Study on the Slope Analysis of Weathered Limestone Soils during Rainfalls (강우 시 석회암 풍화토 사면의 안정해석에 관한 연구)

  • Kim Jong-Ryeol;Kang Seung-Goo;Kang Hee-Bog;Park Seung-Kyun;Park Chol-Won
    • The Journal of Engineering Geology
    • /
    • v.15 no.1
    • /
    • pp.9-17
    • /
    • 2005
  • A set of soil samples were picked up from a failed slope formed by rainfall in limestone zone in Jangseong-gun, Jeonnam, Korea, to find out its physical and mechanical characteristics for this study, and variation of safety factor depending on slope inclination was defined by analysing slope stability affected by rainfall. Decomposed limestone soil in the research area is composed of quartz, orthoclase, gibbsite, geothite, etc., with specific gravity of 2.73, and this soil is included in SC by unified soil classification system. Calcium ingredient decreased remarkably during weathering at its mother rock. Coefficient of permeability is 2.56×10/sup -4/ cm/ sec, similar to its value of silty clay. Cohesion decreases remarkably from 3.0 t/ ㎡ to 0.72 t/ ㎡, and Φ value of internal friction angle tends to decrease as it turns to be saturated soil from partial saturated soil in the shear test. To analyze slope stability affected by rainfall, it is reasonable to seek seepage depth with reference to rainfall* intensity. In the slope stability analysis, when the seepage depth is the larger, its safety factor is the less, which makes the slope unstable. Comparing with minimum safety factor, 1.5 of cut slope in consideration of the seep-age line, safety factor is found to be satisfactory only when inclination of cut slope of decomposed limestone soil is more than 1:1.2 slope at least considering rainfall. It is also found that decrease of cohesion has great effect on decline of safety factor of slope while partial saturated soil turns to be saturated soil.

Guideline in the Management of Antenatally Diagnosed Unilateral Hydronephrosis (산전 초음파로 발견된 수신증의 치료 방침)

  • Hahn Hye-Won;Jun Nu-Lee;Kim Kun-Seok;Moon Dae-Hyuk;Yoon Chong-Hyun;Park Young-Seo
    • Childhood Kidney Diseases
    • /
    • v.7 no.1
    • /
    • pp.60-66
    • /
    • 2003
  • Purpose : Neonatal hydronephrosis has been detected with increasing frequency with the widespread use of prenatal ultrasonography, but the consensus about its postnatal management has not yet been reached, especially about surgical intervention. We attempted to determine the guideline of follow-up study and surgical intervention of hydronephrosis by analyzing clinical outcomes of neonates with hydronephrosis. Materials and Methods : Between 1994 and 2000, 128 hydronephrotic kidneys were postnatally confirmed. Cases associated with other urologic anomalies were excluded and 90 unilateral hydronephrotic kidneys with a minimum follow-up of 12 months were enrolled in this study. We classified the patients into 6 groups according to the anterior posterior pelvic diameter(APPD) at initial ultrasonography(USG) within 1 month after birth. Renal USG and $Tc^{99m}-mercaptoacetyl$ triglycerine(MAG3) scan were done according to a set protocol, and pyeloplasty was performed when indicated according to our protocol. Results : Most cases whose APPD were below 10 mm improved or resolved. Only few cases with APPD above 20 mm showed spontaneous improvement and most(88%) had undergone operation. Those with initial APPD within 10-19 mm showed variable outcomes. When the risk factors for irreversible renal functional deterioration were analyzed, the age at pyeloplasty and pre-operative functional deficit were significant. Conclusion : We concluded that in infants with initial APPD below 10 mm, consideration of surgery is not needed, and in those with initial APPD above 20 mm, early operation is recommended. Our set protocol based on initial USG is useful, but the cut-off value of relative renal function(RRF) for operation might be increased to 40% to improve post operative RRF.

  • PDF