• 제목/요약/키워드: Minimal period

검색결과 438건 처리시간 0.027초

다수의 고장유형을 갖는 제철설비의 최적 정비주기 산출 (Determining the Optimum Maintenance Period of the Steel Making Equipment Having Multiple Failure Types)

  • 송홍준;전치혁
    • 산업공학
    • /
    • 제16권1호
    • /
    • pp.27-33
    • /
    • 2003
  • The maintenance cost in K Steelworks has been continuously increased in proportion to the production cost. However, there seems to be a possibility of reducing cost through the optimization of maintenance actions. The failure types of the equipment in steelworks ate various with different failure cost. Thus the failure rate and cost of each type of failures should be considered simultaneously when the optimum maintenance period is to be determined. It is considered that the equipment undergoes periodic replacement and a specified number of incomplete preventive maintenance actions are performed during a replacement period. Assuming that the time to failure follows a Weibull distribution, the parameters of the failure rate are estimated using the maximum likelihood estimation. The optimal replacement period is determined to minimize the average cost per unit time. As the result of analysis it is suggested that the existing maintenance period for a hot-rolling equipment can be extended significantly.

The Changing Roles of Ownership in the Economic Growth in China

  • Lee, Hyuntai
    • 분석과 대안
    • /
    • 제4권2호
    • /
    • pp.39-70
    • /
    • 2020
  • This paper examines the changing roles of ownership in the economic growth by using a panel data set of 30 provinces in China for the period (1999-2010). With the use of absolute and relative presence variables, this study shows that private enterprises have emerged as the engine of economic growth in China in the later period (2005-2010). The growing size and number of private enterprises are positively linked to growth. However, though foreign-invested enterprises have been acclaimed as the main contributors to economic growth in China, they have minimal effect on the economic growth in the later period. State-owned enterprises have a significant and negative effect on the economic growth in the later period. The results can be interpreted that the engine of growth in China has been changed over time from other ownerships to private ownership. Private companies have developed a lot in every respect and started to lead the economy for long-run growth. China initiated its economic growth by adopting foreign capital and it is still the top destination for foreign direct investment among developing countries. However, to sustain the growth over a long period, private sector should be of great importance and perform a key role in the view of catch-up economics.

  • PDF

성인에서 최소절개를 이용한 개심술 (Open Heart Surgery Through other than Full Sternotomy in Adults)

  • 이재원;송명근
    • Journal of Chest Surgery
    • /
    • 제31권6호
    • /
    • pp.576-580
    • /
    • 1998
  • 서울중앙병원에서 1989년 개원 이래로 시행해 오던 우전측부 개흉술을 통한 심방중격결손증과 승모판막에 대한 수술 결과를 알아보고 1997년 8월부터 10월까지 보다 광범위하게 시행된 최소침습적인 개심술의 결과를 정리하여 향후 최소침습적인 수술 조작에 대한 지표로 삼고자 하였다. 우전측부 개흉으로 17예의 심방중격결손증, 4예의 승모판 성형술, 6예의 승모판막치환술, 그리고 1예의 세번째의 심장수술에서의 삼첨판과 승모판 재대치술을 시행하여 1예의 출혈로 인한 재수술을 제외하고는 이 접근으로 인한 합병증은 없었다. 1997년 8월부터 10월까지 6례의 대동맥판막 치환례중 누두흉 1례를 제외한 5례에서 4례는 상부흉골절개를, 1례에서는 횡흉골절개를 시도하였다. 같은 기간 동안에 7예의 심방중격결손증에서 우전측부 개흉술과 하부 흉골절개로 수술을 시행하여 무리없이 수술을 마칠 수 있었고 미용적인 면과 출혈량에서 특히 우수한 결과를 나타내었다. 이에 저자는 이러한 최소 침습적인 개심술이 안전하고 환자의 호응이 높아 앞으로 보다 적극적으로 시도되어야 할 것으로 결론을 내린다.

  • PDF

주택시장의 네트워크 구조 분석: 수도권 아파트 매매시장의 사례 (An Analysis of Network Structure in Housing Markets: the Case of Apartment Sales Markets in the Capital Region)

  • 정준호
    • 한국경제지리학회지
    • /
    • 제17권2호
    • /
    • pp.280-295
    • /
    • 2014
  • 본 연구는 최소걸침나무(minimal spanning tree) 기법을 2003년 7월-2014년 3월 기간 동안의 수도권 아파트 매매시장에 적용하여 주택시장 네트워크의 위상학적인 구조를 분석한다. 이러한 기법의 적용을 통해 파악된 수도권 아파트 매매시장 네트워크의 위상학적인 구조의 특성들은 주식시장에서 발견되는 그것들과 정도의 차이는 있지만 어느 정도 공유하고 있다. 이는 네트워크의 계층구조, 네트워크 내 하위집단의 구분, 시간에 따른 결절 간 수익률의 전염 확산, 시간 종속적인 네트워크 구조에 따른 상관관계 붕괴 현상 등을 포함한다. 이는 분석 기간 동안에 아파트가 자산으로서 투기적 동기에 강렬하게 휩싸여 있었으며 유동성이 상대적으로 가장 뛰어난 주택 상품이라는 것에 어느 정도 기인하는 것으로 보인다.

  • PDF

Bone Flap Resorption Following Cranioplasty with Autologous Bone : Quantitative Measurement of Bone Flap Resorption and Predictive Factors

  • Park, Sang Pil;Kim, Jae Hoon;Kang, Hee In;Kim, Deok Ryeong;Moon, Byung Gwan;Kim, Joo Seung
    • Journal of Korean Neurosurgical Society
    • /
    • 제60권6호
    • /
    • pp.749-754
    • /
    • 2017
  • Objective : To quantitatively measure the degree of bone flap resorption (BFR) following autologous bone cranioplasty and to investigate factors associated with BFR. Methods : We retrospectively reviewed 29 patients who underwent decompressive craniectomy and subsequent autologous bone cranioplasty between April 2005 and October 2014. BFR was defined as : 1) decrement ratio ([the ratio of initial BF size/craniectomy size]-[the ratio of last BF/craniectomy size]) >0.1; and 2) bone flap thinning or geometrical irregularity of bone flap shape on computed tomographic scan or skull plain X-ray. The minimal interval between craniectomy and cranioplasty was one month and the minimal follow-up period was one year. Clinical factors were compared between the BFR and no-BFR groups. Results : The time interval between craniectomy and cranioplasty was $175.7{\pm}258.2$ days and the mean period of follow up was $1364{\pm}886.8$ days. Among the 29 patients (mean age 48.1 years, male : female ratio 20 : 9), BFR occurred in 8 patients (27.6%). In one patient, removal of the bone flap was carried out due to severe BFR. The overall rate of BFR was $0.10{\pm}0.11$ over 3.7 years. Following univariate analysis, younger age ($30.5{\pm}23.2$ vs. $54.9{\pm}13.4$) and longer follow-up period ($2204.5{\pm}897.3$ vs. $1044.1{\pm}655.1$) were significantly associated with BFR (p=0.008 and 0.003, respectively). Conclusion : The degree of BFR following autologous bone cranioplasty was 2.7%/year and was associated with younger age and longer follow-up period.

An Opportunity-based Age Replacement Policy with Warranty Analysed by Using TTT-Transforms

  • Iskandar, Bermawi P.;Klefsjo, Bengt;Sandoh, Hiroaki
    • International Journal of Reliability and Applications
    • /
    • 제1권1호
    • /
    • pp.27-38
    • /
    • 2000
  • In a recent paper Iskandar & Sandoh (1999) studied an opportunity-based age replacement policy for a system which has a warranty period (0,S]. When the system fails at age x $\leq$ S a minimal repair is performed. If an opportunity occurs to the system at age x, S $\leq$ x $\leq$ T, we take the opportunity with probability p to preventively replace the system, while we conduct a corrective .replacement when its fails in (S,T). Finally, if its age reaches T, we perform a preventive replacement, Under this policy the design variable is T. For the case when opportunities occur according to a homogeneous Poisson process, the long-run average cost of this policy was formulated and studied analytically by Iskandar & Sandoh (1999). The same problem is here analysed by using a graphical technique based on scaled TTT-transforms. This technique gives, among other things, excellent possibilities for different types of sensitivity analysis. We also extend the discussion to the situation when we have to estimate T based on times to failure.

  • PDF

Histomorphometric Study of Implants Initially Stabilized through Bone Graft Packing into the Osteotomy before Implant Placement in Case of Wide Defects

  • Lee, Wang-Jae;Hong, Ki-Seok
    • Journal of Korean Dental Science
    • /
    • 제4권2호
    • /
    • pp.67-72
    • /
    • 2011
  • Purpose: This study sought to evaluate the effects of bone graft wedging on the initial stability of implants in bone sites of unfavorable quality. Materials and Methods: Three male beagle dogs were used in this study. Osteotomies were performed with parallel drills (${\O}4.1{\times}10mm$), and fixtures (${\O}3.3{\times}8mm$) were placed. The control group was given implants without bone graft. Experiment group A was given implants with minimal initial stability using autobone grafts, whereas experiment group B was given xenografts. Groups were also divided by healing times at 4, 8, and 12 weeks. Results: All implants in the control group failed to osseointegrate. On the other hand, all implants in the experiment groups were clinically well-maintained during the entire experiment period. After 4, 8, and 12 weeks, bone-to-implant contact (BIC) ratio and implant stability quotient (ISQ) increased in the experiment groups. The differences between experiment groups A and B were not statistically significant, however. Conclusion: In unfavorable bone regions for dental implants, bone graft packing into the osteotomy prior to implant placement secured minimal initial stability and showed reasonable BIC ratios and ISQ values throughout the study period.

연장된 보증이 있는 교체정책에 대한 베이지안 접근 (A Bayesian Approach to Replacement Policy with Extended Warranty)

  • 정기문
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제13권4호
    • /
    • pp.229-239
    • /
    • 2013
  • This paper reports a manner to use a Bayesian approach to derive the optimal replacement policy. In order to produce a system with minimal repair warranty, a replacement model with the extended warranty is considered. Within the warranty period, the failed system is minimally repaired by the manufacturer at no cost to the end-user. The failure time is assumed to follow a Weibull distribution with unknown parameters. The expected cost rate per unit time, from the end-user's viewpoints, is induced by the Bayesian approach, and the optimal replacement policy to minimize the cost rate is proposed. Finally, a numerical example illustrating to derive the optimal replacement policy based on the Bayesian approach is described.

연장된 이단계 보증 이후의 교체모형 (Replacement Model after Extended Two-phase Warranty)

  • 정기문
    • 통합자연과학논문집
    • /
    • 제14권4호
    • /
    • pp.197-204
    • /
    • 2021
  • Under the two-phase warranty, the warranty period is divided into two intervals, one of which is for renewing replacement warranty, and the other is for minimal repair warranty. Jung[13] discusses the two types of extended two-phase warranty models. In this paper, we suggest the replacement model after the extended two-phase warranty that has been proposed by Jung[13]. To determine the optimal replacement policy, we adopt the expected cost rate per unit time. So, the expressions for the total expected cost, the expected length of the cycle and the expected cost rate per unit time from the user's point of view are derived. Also, we discuss the optimal replacement policy and the uniqueness of the solution for the optimization. Furthermore, the numerical examples are provided to illustrate the proposed the replacement model.

대여 장비의 예방정비 일정 결정을 위한 의사 결정 모델 개발 (Developing a Decision-Making Model to Determine the Preventive Maintenance Schedule for the Leased Equipment)

  • 이주현;배기호;안선응
    • 산업경영시스템학회지
    • /
    • 제41권2호
    • /
    • pp.24-31
    • /
    • 2018
  • As a system complexity increases and technology innovation progresses rapidly, leasing the equipment is considered as an important issue in many engineering areas. In practice, many engineering fields lease the equipment because it is an economical way to lease the equipment rather than to own the equipment. In addition, as the maintenance actions for the equipment are costly and need a specialist, the lessor is responsible for the maintenance actions in most leased contract. Hence, the lessor should establish the optimal maintenance strategy to minimize the maintenance cost. This paper proposes two periodic preventive maintenance policies for the leased equipment. The preventive maintenance action of policy 1 is performed with a periodic interval, in which their intervals are the same until the end of lease period. The other policy is to determine the periodic preventive maintenance interval minimizing total maintenance cost during the lease period. In addition, this paper presents two decision-making models to determine the preventive maintenance strategy for leased equipment based on the lessor's preference between the maintenance cost and the reliability at the end of lease period. The structural properties of the proposed decision-making model are investigated and algorithms to search the optimal maintenance policy that are satisfied by the lessor are provided. A numerical example is provided to illustrate the proposed model. The results show that a maintenance policy minimizing the maintenance cost is selected as a reasonable decision as the lease term becomes shorter. Moreover, the frequent preventive maintenance actions are performed when the minimal repair cost is higher than the preventive maintenance cost, resulting in higher maintenance cost.