• 제목/요약/키워드: Midterm scheduling

검색결과 3건 처리시간 0.019초

조선 중일정 블록 배량 계획 자동화 연구 (An Automatic Block Allocation Methodology at Shipbuilding Midterm Scheduling)

  • 황인혁;남승훈;신종계
    • 한국CDE학회논문집
    • /
    • 제17권6호
    • /
    • pp.409-416
    • /
    • 2012
  • Most of the shipbuilding scheduling researches so far have been conducted with stress on the dock plan. That is due to the fact that the dock is the least extendable resource in shipyards and its overloading is difficult to resolve. However, once the dock scheduling is completed, it is also important to make a plan that make the best use of the rest of the resources in the shipyard, so that any additional cost is minimized. This study automates block allocation process by analyzing the existing manual process that designates production bays for the blocks during the midterm planning. Also, a planning scenario validation method is suggested, where block allocation scenarios based on diagrams are edited and simulated.

Automation of block assignment planning using a diagram-based scenario modeling method

  • Hwang, In Hyuck;Kim, Youngmin;Lee, Dong Kun;Shin, Jong Gye
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • 제6권1호
    • /
    • pp.162-174
    • /
    • 2014
  • Most shipbuilding scheduling research so far has focused on the load level on the dock plan. This is because the dock is the least extendable resource in shipyards, and its overloading is difficult to resolve. However, once dock scheduling is completed, making a plan that makes the best use of the rest of the resources in the shipyard to minimize any additional cost is also important. Block assignment planning is one of the midterm planning tasks; it assigns a block to the facility (factory/shop or surface plate) that will actually manufacture the block according to the block characteristics and current situation of the facility. It is one of the most heavily loaded midterm planning tasks and is carried out manually by experienced workers. In this study, a method of representing the block assignment rules using a diagram was suggested through analysis of the existing manual process. A block allocation program was developed which automated the block assignment process according to the rules represented by the diagram. The planning scenario was validated through a case study that compared the manual assignment and two automated block assignment results.

중립파일 기반의 조선소 시뮬레이션 환경에 관한 연구 (An Approach for Construction of Shipyard Simulation Environment based on Neutral File Format)

  • 우종훈;황윤석;남종호
    • 대한조선학회논문집
    • /
    • 제53권1호
    • /
    • pp.18-28
    • /
    • 2016
  • In shipbuilding, the scheduling system is susceptible to sudden changes and thus it turns to be difficult to predict the differences between schedule and production records in advance. A computer-based simulation is commonly utilized to overcome the discrepancies occurred in estimating workloads and resulting processing times. The main drawback of this simulation-based solution is its limited applicability because, in most cases, each shipyard requires specific and customized simulation environment. By standardizing the planning data of the midterm scheduling system, as proposed in this paper, the efficiency of the current simulation model can be enhanced. To present an alternative approach, this paper begins with the analysis of the complex planning data structure of several shipyards and then proceeds to construct a standard data structure based on the neutral format. An interface application is developed for the data transaction and simulation in on-line environment. As a result, a simulation-based production management of shipyards can be achieved by the efficient prediction of planning and scheduling.