Performance evaluation of TEDA impregnated activated carbon under long term operation simulated NPP operating condition

  • Lee, Hyun Chul;Lee, Doo Yong;Kim, Hak Soo;Kim, Cho Rong
    • Nuclear Engineering and Technology
    • /
    • v.52 no.11
    • /
    • pp.2652-2659
    • /
    • 2020
  • The methyl iodide (CH3I) removal performance of tri-ethylene-di-amine impregnated activated carbon (TEDA-AC) used in the air cleaning unit of nuclear power plants (NPPs) should be maintained at least 99% between 24 month-performance test period. In order for evaluating the effectiveness of TEDA-AC on the removal performance of CH3I in nuclear power plant during the operation of NPPs, the long-term test for up to 15 months was carried out under the simulated operating conditions (e.g., 25 ℃, RH 50%, ppb level poisoning gases injection) at nuclear power plants (NPPs). The TEDA-AC samples were analyzed with the Brunauer-Emmett-Teller (BET) specific surface area and TEDA content as well as CH3I penetration test. It is clearly evident that more than 99% of CH3I removal performance of TEDA-AC was observed in the TEDA-AC samples during 15 months of long-term operation under the simulated NPP operating conditions including the ppb level of organic and oxide form of poisoning gases. BET specific surface area and TEDA content that can affect the CH3I removal performance of TEDA-AC were also maintained as those in new TEDA-AC during 15 months of long-term operation.

A Study on Improvement of Test Method of Nuclear Power Plant ESF ACS by applying Regulatory Guide 1.52 (Rev.3) (Reg. Guide 1.52(Rev.3)를 적용한 원전 ESF 공기정화계통 성능시험법 개선 연구)

  • Lee, Sook-Kyung;Kim, Kwang-Sin;Sohn, Soon-Hwan;Song, Kyu-Min;Lee, Kae-Woo;Park, Jeong-Seo;Cho, Byoung-Ho;Yoo, Byeang-Jea;Hong, Soon-Joon;Kang, Sun-Haeng
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.8 no.4
    • /
    • pp.311-318
    • /
    • 2010
  • U. S. NRC Regulation Guide 1.52 regulating ESF ACS in nuclear power plants has been revised to revision 3. To apply reduction of operability test time, allowance of alternative challenge agents for in-place leak test of HEPA filters, and upgrade of Methyl Iodide penetration acceptance criterion in activated carbon performance test suggested in Reg. Guide 1.52(Rev.3) on Yonggwang units 5 and 6 ESF ACSes, technical feasibility study was carried out with on-site experiments as well as experiments with a lab-scale model. It was confirmed that the moisture in the system returned to the level before the test in 1 or 4 days even though the moisture was removed during the operability test lasting more than 10 hours. Therefore, it is appropriate to perform monthly operability test in 15 minutes just long enough to check the operability of equipment. To change challenge material for in-place HEPA filter leak test, size of aerosol, production rate, and leak detection capability were compared for DOP and PAO. It was concluded that PAO can be substituted for DOP in nuclear power plants. The upgrade of Methyl Iodide penetration acceptance criterion from 0.175 % to 0.5 % in active carbon filter bed deeper than 4 inches was to conform to the change of activated carbon performance test method to ASTM D3803(1989). It was confirmed that Methyl Iodide penetration acceptance criterion of 0.5 % under $30^{\circ}C$, relative humidity 95 % condition was conservatively good enough for testing performance of active carbon insitu. The licence change of Yonggwang units 5 and 6 has been completed based on this study.