• Title/Summary/Keyword: Method of Payment

Search Result 475, Processing Time 0.031 seconds

Effectiveness of Medical Aid Case Management in Excessive Healthcare User by Interventions based on the Number of Accesss (의료급여 과다이용자의 중재방법별 접근횟수에 따른 사례관리 효과)

  • Song, Myeong-Kyeong;Cho, Jeong-Hyun;Kim, Soon-Ok
    • Journal of Digital Convergence
    • /
    • v.15 no.7
    • /
    • pp.259-269
    • /
    • 2017
  • This study analyzed medical aid case management effects based on the number of access by visits, phone calls, letters, internal investigation, resource links, and requests, in medical aid case management business that is carried out to improve the quality of life of medical care beneficiaries and reduce financial cost. Secondary analysis study using data of 564 high-risk group in the medical aid case management and their healthcare utilization data. Letters had positive correlations with the scores of all case management domains. The higher visits was, the lower the score of self-health care ability was, and the higher the number of phone calls was, the higher the score for reasonable medical use was. While there was no significant difference in medical cost according to aid management by interventions, the higher visits and resource links were, the lower the subjects' total number of payment days was. There is a difference in the various areas of the quality of health -related life and medical use depending on case management by intervention method and its number. It is necessary to carry out the efficient number of access to case management by intervention method.

Economic Value Estimation of Agricultural ODA Projects Using Contingent Valuation Method : Focused on the KOPIA of Rural Development Administration (조건부가치측정법을 활용한 공적개발원조의 경제적 가치 추정: 농촌진흥청 해외농업기술개발사업(KOPIA)을 중심으로)

  • Moon, Kwang-Min
    • The Journal of the Korea Contents Association
    • /
    • v.21 no.5
    • /
    • pp.548-560
    • /
    • 2021
  • This study estimates the amount of willingness to pay of the general public by applying the contingent value method to the Korea Program for International cooperation in Agricultural technology(KOPIA), a representative project of the Rural Development Administration. Prior to measuring the amount of willingness to pay for the KOPIA project, a survey of the perception of agriculture and rural areas and respondents' basic perception of public development assistance showed a positive perception of official development assistance in general. In particular, many respondents said that aid from the international community in the past contributed to Korea's economic and social development along with the importance of the international community helping the poor in underdeveloped countries. As a result of estimating the acceptance probability regression model by including the public awareness as a variable, the higher the income of the respondents and the more positive the perception of public development aid, the higher the amount of willingness to pay. The average annual payment amount per household derived from the acceptance probability regression model was estimated to be about 30,729 won.Based on the results of this analysis, several policy implications related to the public development aid policy of Korea were presented.

User-Class based Service Acceptance Policy using Cluster Analysis (군집분석 (Cluster Analysis)을 활용한 사용자 등급 기반의 서비스 수락 정책)

  • Park Hea-Sook;Baik Doo-Kwon
    • The KIPS Transactions:PartD
    • /
    • v.12D no.3 s.99
    • /
    • pp.461-470
    • /
    • 2005
  • This paper suggests a new policy for consolidating a company's profits by segregating the clients using the contents service and allocating the media server's resources distinctively by clusters using the cluster analysis method of CRM, which is mainly applied to marketing. In this case, CRM refers to the strategy of consolidating a company's profits by efficiently managing the clients, providing them with a more effective, personalized service, and managing the resources more effectively. For the realization of a new service policy, this paper analyzes the level of contribution $vis-\acute{a}-vis$ the clients' service pattern (total number of visits to the homepage, service type, service usage period, total payment, average service period, service charge per homepage visit) and profits through the cluster analysis of clients' data applying the K-Means Method. Clients were grouped into 4 clusters according to the contribution level in terms of profits. Likewise, the CRFA (Client Request Filtering algorithm) was suggested per cluster to allocate media server resources. CRFA issues approval within the resource limit of the cluster where the client belongs. In addition, to evaluate the efficiency of CRFA within the Client/Server environment the acceptance rate per class was determined, and an evaluation experiment on network traffic was conducted before and after applying CRFA. The results of the experiments showed that the application of CRFA led to the decrease in network expenses and growth of the acceptance rate of clients belonging to the cluster as well as the significant increase in the profits of the company.

Detecting Protest Responses (지불거부응답의 판별)

  • OH, Hyungna
    • KDI Journal of Economic Policy
    • /
    • v.34 no.1
    • /
    • pp.135-168
    • /
    • 2012
  • This study analyzes ways to detect protest responses (hereafter, PR zero-bid) in the contingent valuation method (CVM). In order to distinguish PR zero-bids from true zero-bids (non-PR zero bids), this study adopts the concept of the implicit willingness to pay employing the Hicksian compensating surplus and the Taylor's 1st order approximation. When a respondent proposes a zero-bid (i.e., WTP=0) and chooses a PR filtering item to indicate that her implicit WTP is not necessary zero, her response is identified as a PR zero bid. PR filtering items falling into the PR zero bids category include the uncertainty of information, distrust in the government and project achievement, disagreement to project plans, discontent with the fairness of public works and their payment method and animosity against the CVM itself. The empirical analysis shows that PR zero bids take place systematically in particular respondent groups: respondents who have never used similar facilities before nor plans to use the facility provided by the public project, the employed, and low income groups. In conclusion, the study suggests that a CVM questionnaire needs to be designed carefully to minimize problems associated with PR zero bids and the potential risks of having sample selection bias should be concerned.

  • PDF

Evaluation for Applying Low-Cost Mobile Laser System to Earth Volume Calculation at Construction Site (건설현장에서의 토공량산출을 위한 저가형 모바일 레이저시스템의 적용성 평가)

  • Kim, In Seop
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.30 no.6_1
    • /
    • pp.539-547
    • /
    • 2012
  • Volume survey for earthwork is conducted periodically at every month at large scaled construction sites for request payment for the construction. Currently, the earthwork volume is calculated on the overlapped drawing for two cross sections which were created by new and previous surveying data observed by GPS and TS. However the survey is required lots of time and expenses as it is a pin-point surveying method thus surveyors intend to get data only for the heavy undulated topographic features chosen by himself to save time and expenses. Consequently, it causes poor results due to low dense measurement as well as it's not matched with the results by another surveyors. As a result, the conflicts related in earthwork volume calculation often arises among the owner, contractors and sub contractors. In this study, we developed a method to get surveying data for fast and accurate volume calculation using 3D Mobile Laser System and conducted an application test. Also we carried out experiments for topographic survey using MLS to judge for the application additionally. The results showed that we could reduce a time for cross section survey from 48 hours to 2 hours and collected high dense data which have 0.2m interval instead of 3m interval compare with existing method. Also we could make a map which has high accuracy within 10cm in horizontal through topographic survey using MLS.

Improvement of Adjusted Funds according to Border Adjustment Method on Cadastral Reform Project (경계설정에 따른 지적재조사의 조정금 개선방안 연구)

  • Yoo, Mi-Young;Choi, Yun-Soo;Choi, Han-Young;Park, Moon-Jae
    • Journal of Cadastre & Land InformatiX
    • /
    • v.50 no.2
    • /
    • pp.117-132
    • /
    • 2020
  • The study studied ways to improve the adjustment of the cadastral reform project after analyzing and evaluating the method of determining the boundaries and the overall status of the adjustment, focusing on cases of complaints in the business district in Sejong City, where the re-investigation project was completed. Measures to improve the adjustment amount of the cadastral reform project were largely divided into boundary adjustment and improvement measures according to the scope of area allowance and institutional improvement. According to an analysis of the status of boundary adjustment in Sejong City, the boundary of the cadastral reform project was being adjusted in various ways, and among them, it was found that it is simple to adjust, to formalize parcels, and that many adjustments are being made centering on resolving blind areas by establishing new roads. When setting such a boundary, it is necessary to establish an efficient and reasonable boundary by actively encouraging sufficient consultation with owners and an adjustment boundary that reflects the personal will of landowners to minimize disputes over the adjustment amount. In terms of improvement measures based on the area limit, it is necessary to accurately record and preserve the results of the cadastral resurvey in numerical data and to ease or exempt the adjustment amount if it is within the area permissible scope of the Spatial Data Management Act when calculating the adjustment amount. Finally, in relation to the adjustment, it was judged that it would be necessary to provide long-term low-interest loans to their own land to landowners, and that it would be necessary to calculate the adjustment through appraisal calculated by third parties fairly and objectively based on value judgment.

A Study on Economic Evaluation of Beneficiary Pays Principle in Water Resource Management - The Case of Namyangju in Korea - (수자원관리 부문에서 수혜자부담원칙 경제적 평가에 관한 연구 - 남양주시 사례분석 -)

  • Yoon, Jaehyun
    • Journal of Environmental Impact Assessment
    • /
    • v.23 no.5
    • /
    • pp.323-336
    • /
    • 2014
  • Using hedonic price method, this paper analyzes the impact of restriction for water quality protection on property value with the officially announced price of reference land in the city of Namyangju in 2012 to evaluate Water Use Fee, based on beneficiary pays principle, levied on the downstream area of the Han River in Korea. The results from the regression analyses of the models used show that the double-log model is the preferred model in the case of Namyangju. Using the double-log model, the total compensation for the city of Namyangju is estimated to be 8.6 trillion won with 95% confidence interval between 4.4 trillion and 12.4 trillion won. Under the perpetuity compensation scheme at the discount rate of 10%, the estimated annual compensation is 0.9 trillion won with 95% confidence interval between 0.4 trillion and 1.2 trillion won. This is more than Water Use Fee collected in 2012 for the Han River, which is approximately 0.5 trillion won. Considering the size of the restricted area of the Paldang area, which is more than 18 times of that of Namyangju, the rate of Water Use Fee, which is based on beneficiary pays principle and imposed on the residents of the downstream area, needs to be increased to sufficiently compensate the economic loss caused to the upstream areas of the Han River in Korea.

Study on Determination of Proper Pillar Width in Road Tunnel Design Stage (도로터널에서 적정한 필라폭 산정에 관한 연구)

  • Yang, Tae-Seon;Kim, Jae-Kyoung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.5
    • /
    • pp.187-194
    • /
    • 2010
  • As the design of the pillar width (PW) of the parallel tunnels in downtown area, in which are located in plains zone with deep alluvium compared with mountain tunnels, is directly related with pre-compensation payment and costs of the underground area, it has to be planned as to keep minimum distance while securing the stability of the parallel tunnels. Although PW of downtown road tunnel in Korea is standardized as 1.5D(D: diameter of the tunnels), PW sometimes has to be reduced within 1.5D to adjust the tunnel lines to the city plan in the cases of the inlet and outlet of the tunnels. In this paper, the design and the analyses of optimum PW of the NATM type road tunnel in the downtown area are introduced. The relationship among the tunnel line planning and underground compensation fee, and ground characteristics are evaluated. In the determination of PW distance, the numerical analyses of underground road tunnels were performed, including the use of the strength decrease method and strength/stress ratio method. In the cases of inlet and outlet part of the tunnels where the stability of the pillars is poor due to contiguous construction of the parallel tunnels, the reinforcement methods are recommended for securing the stability. Numerical verification was performed for the reinforcement proposed.

Measuring Benefits of Developing a Linear Park in the Gyeongin Expressway Downgrade Project by Applying CVM (CVM을 적용한 경인고속도로 일반화 및 선형공원 조성사업의 편익 측정)

  • Young Sook Eom;Sang Ke Kim
    • Environmental and Resource Economics Review
    • /
    • v.32 no.4
    • /
    • pp.239-266
    • /
    • 2023
  • This study applied the contingent valuation method (CVM) to measure the benefits from an urban liner park that will be created as part of the Gyeongin Expressway downgrade project by Inchon metropolitan city government. The Incheon city government plans to create a liner park (10.5 km) in the middle of the downgraded road to provide leisure and recreation services to residents, and plans to remove retaining walls and soundproof walls to improve the urban residential environment. Considering the characteristics of a liner park that spans several districts in Incheon city and the downgraded road that will be passed by residents of nearby cities as well as Incheon residents, the target population included residents of part of Seoul and several cities surrounding Incheon. In a CVM survey of 1,000 respondents conducted in April 2018, about 70% of the respondents perceived this project positively. About 50% of 757 respondents, excluding protest bids respondents, were willing to pay additional taxes for this project. The more the respondents favored the creation of a linear park and the more they thought that this project would improve the surrounding residential environment, the more positively they evaluated the additional tax payment. The average annual willingness to pay for this project was about 15,300 won for Incheon residents and 6,800 won for residents of Seoul metropolitan area. It is interesting to observe that residents of Seoul metropolitan area, who are not directly affected by this project, were willing to pay a considerable amount for this project.

A Study on the Quantitative Risk Assessment of Bridge Construction Projects (교량 공사 프로젝트의 정량적 리스크 평가에 관한 연구)

  • Ahn, Sung-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.1
    • /
    • pp.83-91
    • /
    • 2020
  • The recent bridge construction projects is demanded more sophisticated risk management measures and loss forecasts to brace for risk losses from an increase in the trend of bridge construction. This study aims to analyze the risk factors that caused the loss of material in actual bridge construction and to develop a quantified predictive loss model, based on the past record of insurance payment by major domestic insurance companies for bridge construction projects. For the development of quantitative bridge construction loss model, the dependent variable was selected as the loss ratio, i.e., the ratio of insurance payout divided by the total project cost, while the independent variable adopted 1) Technical factors: superstructure type, foundation type, construction method, and bridge length 2) Natural hazards: typhoon and flood 3) Project information: construction period and total project cost. Among the selected independent variables, superstructure type, construction method, and project period were shown to affect the ratio of bridge construction losses. The results of this study can provide government agencies, bridge construction design and construction and insurance companies with the quantitative damage prediction and risk assessment services, using risk indicators and loss prediction functions derived from the findings of this study and can be used as a guideline for future basic bridge risk assessment development research.