• Title/Summary/Keyword: Meteorological mast

Search Result 34, Processing Time 0.021 seconds

Optimal Location of Meteorological Mast for Power Curve Verification of Wind Farm (풍력단지 출력 검증을 위한 기상탑의 최적위치 선정)

  • Oh, Ki-Yong;Lee, Jun-Shin;Park, Joon-Young;Lee, Jae-Kyung;Kim, Ji-Young
    • New & Renewable Energy
    • /
    • v.5 no.2
    • /
    • pp.31-38
    • /
    • 2009
  • The performance test of a wind turbine in a wind farm is generally carried out by the owner to verify the power curve of the wind turbine given by the turbine manufacturer. The international electro-technical commission provides the IEC 61400-12-1 standard on "Power performance measurements of electricity producing wind turbines". By using this code, one can easily find the suitable met-mast (meteorological mast) location for the wind data whether a wind farm is potential or already built. In this paper, the valid sectors for wind turbines installed in the HanKyoung wind farm, south-west in Jeju island are analyzed on the basis of the code by considering the wind farm layout. Among these sectors, the optimal met-mast location is presented for the power curve verification of the wind farm.

  • PDF

Validation of Calibrated Wind Data Sector including Shadow Effects of a Meteorological Mast Using WindSim (WindSim을 이용한 풍황탑 차폐오차 구간의 보정치 검증)

  • Park, Kun-Sung;Ryu, Ki-Whan;Kim, Hyun-Goo
    • Journal of Wind Energy
    • /
    • v.4 no.2
    • /
    • pp.34-39
    • /
    • 2013
  • The wind resource assessment for measured wind data over 1 year by using the meteorological mast should be a prerequisite for business feasibility of the wind farm development. Even though the direction of boom mounting the wind vane and anemometer is carefully engineered to escape the interference of wakes generated from the met-mast structures, the shadow effect is not completely avoided due to seasonal winds in the Korean Peninsula. The shadow effect should be properly calibrated because it is able to distort the wind resources. In this study a calibration method is introduced for the measured wind data at Julpo in Jeonbuk Province. Each sectoral terrain conditions along the selected wind direction nearby the met-mast is investigated, and the distorted wind data due to shadow effects can be calibrated effectively. The correction factor is adopted for quantitative calibration by carrying out the WindSim analysis.

Site Calibration for the Wind Turbine Performance Evaluation (풍력발전기 성능실증을 위한 단지교정 방법)

  • Nam, Yoon-Su;Yoo, Neung-Soo;Lee, Jung-Wan
    • Journal of Industrial Technology
    • /
    • v.22 no.A
    • /
    • pp.49-57
    • /
    • 2002
  • The accurate wind speed information at the hub height of a wind turbine is very essential to the exact estimation of the wind turbine power performance testing. Several methods on the site calibration, which is a technique to estimate the wind speed at the wind turbine's hub height based on the measured wind data using a reference meteorological mast, are introduced. A site calibration result and the wind resource assessment for the Taekwanryung test site are presented using a one-month wind data from a reference meteorological mast and a temporal mast installed at the site of wind turbine. From this analysis, it turns out that the current location of the reference meteorological mast is wrongly determined, and the self-developed codes for the site calibration are working properly. Besides, an analysis on the uncertainty allocation for the wind speed correction using site calibration is performed.

  • PDF

Installation of Meteorological Mast for the Test Bed of Offshore Wind Power (서해 100MW 해상풍력 실증단지 기상타워 구축사례)

  • Ryu, Moosung;Kang, Keumseok;Kim, Jiyoung;Lee, Junshin
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.55.2-55.2
    • /
    • 2011
  • The final site of offshore wind power plant should be decided by comprehensive examination of various conditions such as wind resource, sea depth, geology, grid connection, social circumstance and environmental issue. Wind condition is typically regarded as the most important factor because wind energy increases in proportion to wind velocity and it directly relates to the amount of power output, efficiency of power plant and profitability. Advanced countries in the offshore wind power sector such as Denmark, UK and Germany, they are analyzing wind resource accurately by installing the meteorological mast in the ocean in order to get the optimal type of wind turbine and maximum generation efficiency. Also, it is made much of designing offshore power plant on the basis of actual measurement by met-mast and those wind farms have a chance to get the loan with reduced interest rate in project financing. In Korea, the HEMOSU-1 is installed in the ocean around Wido island to analyze wind resource of test bed of 100MW offshore wind power on october last year. This paper deals with the design and construction procedure of the first met-mast in Korea and also shows the site characteristics of test bed. Therefore, this paper will give useful information to local governments and private business sector who are trying to construct offshore wind farm and it can also be a good reference for the following projects of meteorological mast in near future.

  • PDF

Characterization of the wind-induced response of a 356 m high guyed mast based on field measurements

  • Zhe Wang;Muguang Liu;Lei Qiao;Hongyan Luo;Chunsheng Zhang;Zhuangning Xie
    • Wind and Structures
    • /
    • v.38 no.3
    • /
    • pp.215-229
    • /
    • 2024
  • Guyed mast structures exhibit characteristics such as high flexibility, low mass, small damping ratio, and large aspect ratio, leading to a complex wind-induced vibration response mechanism. This study analyzed the time- and frequency-domain characteristics of the wind-induced response of a guyed mast structure using measured acceleration response data obtained from the Shenzhen Meteorological Gradient Tower (SZMGT). Firstly, 734 sets of 1-hour acceleration samples measured from 0:00 October 1, 2021, to 0:00 November 1, 2021, were selected to study the vibration shapes of the mast and the characteristics of the generalized extreme value (GEV) distribution. Secondly, six sets of typical samples with different vibration intensities were further selected to explore the Gaussian property and modal parameter characteristics of the mast. Finally, the modal parameters of the SZMGT are identified and the identification results are verified by finite element analysis. The findings revealed that the guyed mast vibration shape exhibits remarkable diversity, which increases nonlinearly along the height in most cases and reaches a maximum at the top of the tower. Moreover, the GEV distribution characteristics of the 734 sets of samples are closer to the Weibull distribution. The probability distribution of the structural wind vibration response under strong wind is in good agreement with the Gaussian distribution. The structural response of the mast under wind loading exhibits multiple modes. As the structural response escalates, the first three orders of modal energy in the tower display a gradual increase in proportion.

Site Calibration for the Wind Turbine Performance Evaluation

  • Nam, Yoon-Su;Yoo, Neung-Soo;Lee, Jung-Wan
    • Journal of Mechanical Science and Technology
    • /
    • v.18 no.12
    • /
    • pp.2250-2257
    • /
    • 2004
  • The accurate wind speed information at the hub height of a wind turbine is very essential to the exact estimation of the wind turbine power performance testing. Several methods on the site calibration, which is a technique to estimate the wind speed at the wind turbine's hub height based on the measured wind data using a reference meteorological mast, are introduced. A site calibration result and the wind resource assessment for the TaeKwanRyung test site are presented using three-month wind data from a reference meteorological mast and the other mast temporarily installed at the site of wind turbine. Besides, an analysis on the uncertainty allocation for the wind speed correction using site calibration is performed.

Characteristics of Wind Environment in Dongbok·Bukchon Wind Farm on Jeju (제주 동복·북촌 풍력발전단지의 바람환경 특성분석)

  • Jeong, Hyeong-Se;Kim, Yeon-Hee;Choi, Hee-Wook
    • New & Renewable Energy
    • /
    • v.18 no.1
    • /
    • pp.1-16
    • /
    • 2022
  • Climatic characteristics were described using the LiDAR (Light Detection and Ranging) and the met-mast on Dongbok·Bukchon region. The influences of meteorological conditions on the power performance of wind turbines were presented using the data of Supervisory Control And Data Acquisition (SCADA) and met-mast of the Dongbok·Bukchon Wind Farm (DBWF) located in Jeju Island. The stability was categorized into three parameters (Richardson number, Turbulence intensity, and Wind shear exponent). DBWF was dominant in unstable atmospheric conditions. At wind speeds of 14 m/s or more, the proportion of slightly unstable conditions accounted for more than 50%. A clear difference in the power output of the wind turbine was exhibited in the category of atmospheric stability and turbulence intensity (TI). Particularly, a more sensitive difference in power performance was showed in the rated wind speeds of the wind turbine and wind regime with high TI. When the flow had a high turbulence at low wind speeds and a low turbulence at rated wind speeds, a higher wind energy potential was produced than that in other conditions. Finally, the high-efficiency of the wind farm was confirmed in the slightly unstable atmospheric stability. However, when the unstable state become stronger, the wind farm efficiency was lower than that in the stable state.

Nacelle-Mounted Lidar Beam Line of Sight (LOS) Wind Speed Calibration Procedure Using Meteorological Mast (기상탑을 이용한 나셀 거치형 라이다 빔의 LOS(Line of Sight) 풍속 교정절차)

  • Ryu, Dong-Hun;Lee, Min-Soo;Lim, Chae-Wook;Ko, Kyung-Nam;Shin, Dong-Heon;Kang, Bo-Sin;Kim, Dong-Wan
    • Journal of Wind Energy
    • /
    • v.9 no.4
    • /
    • pp.24-31
    • /
    • 2018
  • Wind lidar application is increasing and its calibration method is required to use wind lidar as an alternative to the meteorological mast. A nacelle lidar calibration method is now being discussed in IEC 61400-50-3 (Wind energy generation systems - Part 50-3: Use of nacelle-mounted lidars for wind measurements), and the method is mainly based on the wind lidar beam line of sight (LOS) wind speed calibration suggested by DTU as DTU E-0020 (Calibrating Nacelle Lidars). In this paper, a LOS wind speed calibration method is introduced and a calibration example performed on Jeju island is presented. The results showed a slope of 1.011 and R2 of 0.997, which means that the LOS wind speed is highly correlated with the reference wind speed and is comparable. But LOS wind speed calibration requires a very long time due to its principle and environmental conditions, and a calibration method that can overcome this problem of uncontrollable environments needs to be developed.

Comparison between Expected and Actual Capacity Factors of a Wind Farm (풍력발전단지의 예측이용율과 실제이용율 비교분석에 관한 연구)

  • Koh, Byung-Euk;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.7 no.1
    • /
    • pp.40-48
    • /
    • 2011
  • This study shows the comparison between expected and actual capacity factors of a wind farm through wind resource analyzation. The expected capacity factor comes from an 'automatic weather system' run by the Korean national weather service and a 'meteorological mast' run by a project owner. Based on this comparison and analysis, the importance of meteorological mast micro-siting and selection of wind turbine class and type, will be studied along with presenting important implications for wind farm expansion and development.

  • PDF

Meteor-Statistical Analysis for Establishment of Jejudo Wind Resource Database (제주도 풍력자원 데이터베이스 구축을 위한 기상통계분석)

  • Kim, Hyun-Goo;Jang, Moon-Seok;Lee, Eon-Jeong
    • Journal of Environmental Science International
    • /
    • v.17 no.6
    • /
    • pp.591-599
    • /
    • 2008
  • In order to support the development of wind farms in Jejudo, a wind resource database for Jejudo has been established using a meteor-statistical analysis of KIER(Korea Institute of Energy Research) met-mast measurements and KMA(Korea Meteorological Administration) weather data. The analysis included wind statistics, tower shading, an exposure category classification using satellite images, the effect of atmospheric stability on the wind profile exponent, and a correlation matrix of wind speed to gain an understanding of the meteorological correlation between long-term weather observation stations and short-term met-mast measurements. The wind resource database for Jejudo, is to be provided as an add-on to Google $Earth^{TM}$, which is expected to be utilized as a guideline for the selection of an appropriate reference site for long-term correction in the next wind farm development project.