• 제목/요약/키워드: Measurement scale

검색결과 2,644건 처리시간 0.033초

석유화학 플랜트 EPC 사업의 진도율 산정표준의 제안 (A Standard Method for Progress Measurement in a Petrochemical Plant EPC Project)

  • 조홍연;유호선
    • 플랜트 저널
    • /
    • 제7권4호
    • /
    • pp.77-87
    • /
    • 2011
  • In proportion to continuing growth of overseas plant market and the trend of its mega scale of the project, the importance of management is significantly emphasized for the successful execution of the project. And it is recognized that progress control is the most important management item amongst the others in the management. Progress control is importance of progress measurement for performance measurement and process control of project, but it is hardly obtainable securing the objectivity in the progress measurement since the progress measurement are being applied differently in accordance with the project conditions and the experience level of the person in charge for the progress control. This study has conducted as following to propose a standard method for progress measurement in a petrochemical plant protect. Domestic and overseas plant projects are investigated variously with the applied method of progress measurement, and the deduced problem of progress measurement. And then standard method for progress measurement of engineering, procurement, construction and commissioning has been proposed according to comparison and analysis of practices in domestic & overseas plant project, procedures for progress control in the globally reputed petrochemical client, company rules and recommendation of the expert in progress control.

  • PDF

게이지 R&R과 성능지수를 이용한 측정시스템과 공정능력 평가 방법 (Evaluation Method for Measurement System and Process Capability Using Gage R&R and Performance Indices)

  • 주영돈;이동주
    • 산업경영시스템학회지
    • /
    • 제42권2호
    • /
    • pp.78-85
    • /
    • 2019
  • High variance observed in the measurement system can cause high process variation that can affect process capability badly. Therefore, measurement system analysis is closely related to process capability analysis. Generally, the evaluation for measurement system and process variance is performed separately in the industry. That is, the measurement system analysis is implemented before process monitoring, process capability and process performance analysis even though these analyses are closely related. This paper presents the effective concurrent evaluation procedure for measurement system analysis and process capability analysis using the table that contains Process Performance (Pp), Gage Repeatability & Reproducibility (%R&R) and Number of Distinct Categories (NDC). Furthermore, the long-term process capability index (Pp), which takes into account both gage variance and process variance, is used instead of the short-term process capability (Cp) considering only process variance. The long-term capability index can reflect well the relationship between the measurement system and process capability. The quality measurement and improvement guidelines by region scale are also described in detail. In conclusion, this research proposes the procedure that can execute the measurement system analysis and process capability analysis at the same time. The proposed procedure can contribute to reduction of the measurement staff's effort and to improvement of accurate evaluation.

작업 현장에서 육체적 작업 강도를 평가하는 도구로서 Borg's Scale과 심박 수의 비교 (Comparison between Heart Rates and Borg's Scale as a Tool to Evaluate Physical Workload)

  • 김병훈;박지영;탁상우
    • 한국산업보건학회지
    • /
    • 제29권3호
    • /
    • pp.368-374
    • /
    • 2019
  • Objectives: To examine the associations of borg's scale with actual heart rates of workers and energy consumption during their physical work. Methods: A total of 72 workers performing physical activities in postal service, ceramic manufacturing, and metal manufacturing participated in heart rate measurement for 1 work shift using the activity meter(A360) and responded to a borg's scale questionnaire. Results: In consistent with previous findings, we presented high correlation between borg's scale and energy consumption measures among workers performing physical activities(r=0.89) while post-work average heart rate showed nearly no correlation with post-work borg's scale (r=0.09). We proposed a set of adjustments when using borg's scale to estimate physical workload for those workers engaged in physical activities during the majority of their work shift. Conclusions: Our findings suggest that a caution should be paid to when using Borg's scale to estimate heart rates during physical activities as well as energy consumption as the product of heart rate measurements.

A Multi-objective Placement of Phasor Measurement Units Considering Observability and Measurement Redundancy using Firefly Algorithm

  • Arul jeyaraj, K.;Rajasekaran, V.;Nandha kumar, S.K.;Chandrasekaran, K.
    • Journal of Electrical Engineering and Technology
    • /
    • 제10권2호
    • /
    • pp.474-486
    • /
    • 2015
  • This paper proposes a multi-objective optimal placement method of Phasor Measurement Units (PMUs) in large electric transmission systems. It is proposed for minimizing the number of PMUs for complete system observability and maximizing measurement redundancy of the buses, simultaneously. The measurement redundancy of the bus indicates that number of times a bus is able to monitor more than once by PMUs set. A high level of measurement redundancy can maximize the system observability and it is required for a reliable power system state estimation. Therefore, simultaneous optimizations of the two conflicting objectives are performed using a binary coded firefly algorithm. The complete observability of the power system is first prepared and then, single line loss contingency condition is added to the main model. The practical measurement limitation of PMUs is also considered. The efficiency of the proposed method is validated on IEEE 14, 30, 57 and 118 bus test systems and a real and large- scale Polish 2383 bus system. The valuable approach of firefly algorithm is demonstrated in finding the optimal number of PMUs and their locations by comparing its performance with earlier works.

유아의 친사회적 행동 평가 척도 개발 연구 (A Study on the Development of Prosocial Behavior Scale for Young Children)

  • 김여옥
    • 아동학회지
    • /
    • 제24권5호
    • /
    • pp.105-118
    • /
    • 2003
  • Construction of the Prosocial Behavior Scale for young children(PBSYC) was based on document research and interviews with kindergarten teachers and child development specialists. After 200 kindergarten teachers evaluated the 42 items of the PBSYC, factor analysis was conducted; items were categorized into seven factors: leadership, helping, communication, concern, proximity, sharing and empathy. As factors showed high correlation. The prosocial behavior of 306 4 to 5 year old children was measured with the PBSYC and compared with the Babock, Hartle & Lamme(l995) scale. The resulting correlation between the 2 scales was .764. Further tests indicate that the PBSYC is a valid and reliable scale for the measurement of prosocial behavior in young children.

  • PDF

대형 2차 와류에 의한 봉다발 부수로에서의 난류 열전달 향상에 관한 실험적 연구 (Experiment of Turbulent Heat Transfer Performance Enhancement in Rod Bundle Subchannel by the Large Scale Vortex Flow)

  • 서귀현;최영돈
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2004년도 추계학술대회
    • /
    • pp.1592-1597
    • /
    • 2004
  • Experimental studies were carried out to confirm the turbulent enhancement of the cooling system of nuclear reactor by large scale vortex generation in nuclear fuel rod bundle. The large scale vortex motions were generated by rearranging the inclination angles of mixing vanes to the coordinate directions. Experimental studies were carried out at Reynolds Number 60,000 with hydraulic condition. Normal variations of mean velocity and turbulent intensity in the rod bundle subchannel were measured by the 2-color LDV measurement system. The turbulence generated by split mixing vanes has small length scales so that they maintain only about 10DH after the spacer grid. On the other hand, the turbulences generated by the large scale vortex continue more and remain up $25D_{H}$ after the spacer grid.

  • PDF

1:10 축척 시험동 구조 모형의 바닥충격 진동 전달 (Propagation of floor impact vibration in a 1:10 scale model of a test structure)

  • 이평직;유승엽;김재호;전진용
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2007년도 추계학술대회논문집
    • /
    • pp.1455-1458
    • /
    • 2007
  • Vibration characteristics of concrete slabs were investigated using a 1:10 scale model and finite element method. A 1:10 scale model of a test building with 150 and 200mm slab thicknesses was made of acrylic materials. Modal test was conducted to investigate mode shape and modal frequencies. Results show that the mode shapes of two slabs with different thickness are similar each other, whereas natural frequency is different. Through modal analysis using FEM, it was revealed that both mode shapes and natural frequencies calculated from the FEM model are similar to those of the scale model measurement. It was also found that natural frequencies increased with increment of the slab thickness.

  • PDF

보육교사의 교사-영아 상호작용 평가 척도 개발 연구 (A Study on the Development of Interaction Scale between Teachers and Infants for childcare Teachers)

  • 임옥희;이진숙
    • 한국가정과학회지
    • /
    • 제9권1호
    • /
    • pp.5-13
    • /
    • 2006
  • Interaction Scale between Teachers and Infants for childcare Teachers(ISTI) was constructed based on the research data completed by the Bradley, Caldwell & Corwyn's IT-CC-Home and kinds of Interaction Scales with a participation Infants childcare teachers and Child Studies professor, Child Studuies doctoral course students. The results of this study were; First, the study found that the 29 items of the ISTI were categorized into four factors by 205 Infants for childcare teachers: Involvement, Variety, Responsivity, Permission. Second, these factors exhibited a high correlation interactively. Third, the ISTI showed a high correlation with teachers' performance scale. Further ISTI is a vaild and reliable scale for the measurement of Interaction Scale between Teachers and Infants for childcare Teachers.

  • PDF

엔진 난류의 크기척도 및 에너지 스펙트럼 해석 (Analysis of Turbulence Scales and Energy Spectrum for Engine Flows)

  • 강건용;이진욱;박승철
    • 대한기계학회논문집B
    • /
    • 제22권9호
    • /
    • pp.1307-1316
    • /
    • 1998
  • Engine turbulences obtained by LDV measurement near the compression TDC was analyzed by the classic turbulence theory. Turbulences were quantified by a cycle resolved analysis and processed to reveal integral time scale and length scale. Three different definitions were applied to obtain the turbulence time scales and then compared each others. The classic turbulence theory with the several assumptions for engine application proven to be very efficient for understanding engine turbulence in this study. It was found that the integral length scale is strongly affected and increased by tumble flow.

Multivariable Bayesian curve-fitting under functional measurement error model

  • Hwang, Jinseub;Kim, Dal Ho
    • Journal of the Korean Data and Information Science Society
    • /
    • 제27권6호
    • /
    • pp.1645-1651
    • /
    • 2016
  • A lot of data, particularly in the medical field, contain variables that have a measurement error such as blood pressure and body mass index. On the other hand, recently smoothing methods are often used to solve a complex scientific problem. In this paper, we study a Bayesian curve-fitting under functional measurement error model. Especially, we extend our previous model by incorporating covariates free of measurement error. In this paper, we consider penalized splines for non-linear pattern. We employ a hierarchical Bayesian framework based on Markov Chain Monte Carlo methodology for fitting the model and estimating parameters. For application we use the data from the fifth wave (2012) of the Korea National Health and Nutrition Examination Survey data, a national population-based data. To examine the convergence of MCMC sampling, potential scale reduction factors are used and we also confirm a model selection criteria to check the performance.