Development of Progress Measurement Framework for Mega Construction Project (대규모 건설프로젝트의 진도율 측정 프레임워크 개발에 관한 연구)

  • Ko, Sungjin;Chi, Seokho;Kim, Jinwoo;Song, Junho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.2
    • /
    • pp.419-425
    • /
    • 2017
  • Managing mega construction project is a very challenging task due to its large scale and complexity. To deal with the challenge, progress measurement must be estimated reliably and effectively. Many researchers have presented progress measurement methods, but previous studies are limited to single or several types of facilities. Thus, they have difficulties to being applied to mega construction projects that covers multiple facilities. To overcome the limitations, this paper proposes a progress measurement framework considering characteristics of mega construction projects. The framework consists of four phases : development of Work Breakdown Structure, determination of weights of main facilities and sub facilities, and calculation of the integrated progress rate. To validate the proposed approach, a case study of Sejong city in Korea was performed. The results of the case study showed the applicability of the proposed framework and confirmed that it enables to reliably measure progress rate of mega construction projects.

A Study on Simplified Payment Method by Progress Measurement for Specified Activity - Focusing on Construction of Eco-River (대표공종의 선정을 통한 약식 기성 산정 방법에 관한 연구 - 자연형 하천공사를 중심으로)

  • Lee, Jeong-Yoon;Woo, Sung-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.1
    • /
    • pp.160-169
    • /
    • 2010
  • In domestic public works, there are several problems in the measurement of payments based on the bill of quantity, which doesn't match with the activity progress rate, heavy paper works and complicated procedures. It can be classified formal and simplified method. By using the simplified method, it can be solved many problems by summarizing the procedure, but is not generally used. This paper proposes a payment method by progress measurement for specified activity based on WBS(Work Breakdown Structure) verifying efficiency which reduced cost account and advanced work on payment compare to method of domestic public works using the data about construction of eco-river. This method will be an important contribution on being a base for cost-schedule integrated management which were verified and also improving efficiency on measuring payment.

A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase (BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안)

  • Jung, Jun-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.23-34
    • /
    • 2011
  • Reliable progress management at construction requires integrated information of cost and schedule, and information is used as a basis for project performance measurement. However, separate handling of cost and schedule information at construction projects makes objective measurement more difficult and decreases management productivity due to additional works for breaking down bill of quantities into corresponding activities. Recently, research related to BIM addresses issues on effective progress management based on BIM with incorporation of daily progress management. Therefore, the objective of this paper is to propose information model for daily progress rate and budgeted cost of work performed by utilizing BTM-based quantity and location information.

A Study on the Progress Measurement Method using Percent Complete of Work and Labor Productivity - Focusing on Structural Works of Apartment Construction - (단위작업 물량 달성율과 투입 노무량을 이용한 진도율 산정방법에 관한 연구 - 공동주택공사의 골조공사를 중심으로 -)

  • Choi Hyun-Ha;Lee Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.212-219
    • /
    • 2005
  • Time management is important in construction management Especially, in the high-rise apartment housing projects, it is very important to expedite the construction progress in order to meet the planned schedule. The objective of this paper is to propose the baseline for the progress rate using work volume and man $\cdot$ hours performed at work activity level. The work volume far each activity is transformed to the weighted value compared to total work volume for the floor Therefore, a progress rate for an activity is calculated by multiplying a weighted value and work volume. A progress rate for a floor and a building can calculated in this manner, respectively.

An Experimental Study on the Estimation of Oil Discharge Rate from Inverter Rotary Compressor (인버터 로터리 압축기 오일 토출량 산정의 실험적 고찰)

  • Sin, Hyun-Seok;Byun, Soon-Seok;Tae, Sang-Jin;Moon, Je-Myung;Kim, Youn-Jea
    • The KSFM Journal of Fluid Machinery
    • /
    • v.14 no.3
    • /
    • pp.28-32
    • /
    • 2011
  • The inverter rotary compressor discharges refrigerant and compressor oil in air-conditioning systems. The compressor oil which discharged form compressor decreases the efficiency of heat exchanger and affects the compressor operation. Recently, several studies are in progress for reducing the compressor oil. Before the reduction of compressor oil discharge rate, the quantitative measurement and evaluation method are required. In order to cope with this requirement we have developed the measurement technic of oil discharge rate. The reliability assessment was carried out approximately 0.1% of the errors with compressor performance indicators. The acceptable errors were to ensure the reliability of measurement technic. In the experiment results at several conditions, The oil discharge rate of heating operation has been confirmed average 3.7 times more than cooling operation. In this study the evaluation method and the experimental results of oil discharge rate in air-conditioning systems are presented with various operating conditions.

A study on the microcomputer aided pressure progress measurement and combustion analysis in engine cylinder (Micro-Computer를 이용한 기관 실린더 내의 압력측정 및 연소해석에 관한 연구)

  • 김희년;김시범;하종율
    • Journal of the korean Society of Automotive Engineers
    • /
    • v.10 no.3
    • /
    • pp.45-50
    • /
    • 1988
  • The measurement system of the pressure in engine cylinder is developed with the aids of the microcomputer, A/D converter and simple electrical circuits. The experiment is performed in 4 cycle single cylinder Gasoline engine. When data for the pressure progress is sampled, clock signal or signal from the crank angle is used as trigger. The variation of the pressure during the cycles can be well obtained experimentally. So, the informations which are necessary in the combustion analysis, i.e. expansion pressure, indicated mean effective pressure, the magnitude and time of the maximum pressure ignition time, the rate of pressure rise and heat release and combustion rates can be obtained by the calculation using experimental data. Also, the informations about the after-burning process, the existence of the detonation waves and end time of combustion can be investigated from this study.

  • PDF

A new method fast measure cryogenic vessel heat leakage

  • LI, Zheng-Qing;LI, Xiao-Jin;LIU, Mo
    • Progress in Superconductivity and Cryogenics
    • /
    • v.22 no.1
    • /
    • pp.24-28
    • /
    • 2020
  • Heat leakage is an important parameter to reflect heat insulated performance of cryogenic vessel. According to the current standard requirements, it needs to measure the daily evaporation rate to indicate heat leakage. The test needs-over 24h after cryogenic vessel in heat equilibrium as standard required, therefore test efficiency is poor and new efficient method is required to cut test time. First of all, the volume of instantaneous evaporated gas and heat leakage are calculated by the current standard corresponding to the maximum allowable daily evaporation rate of cryogenic vessel. Depending on the relationship between real daily evaporation rate and maximum allowable daily evaporation rate of cryogenic vessel, we designed a new test method based on the pressure changes over time in cryogenic vessel to determine whether its heat insulated performance meets requirements or not. Secondly, the heat transfer process was analyzed in measurement of cryogenic vessel, and the heat transfer equations of whole system were established. Finally, the test was completed in four hours; meanwhile the heat leakage and daily evaporation rate of cryogenic vessel are calculated basing on test data.

Change of FVC, $FEV_1$ after Discontinuance of Bronchodilator in Coal Workers' Pneumoconiosis Patients (탄광부진폐증 환자에서 기관지확장제 투여 중단 후의 노력성폐활량 및 일초폐활량의 변화)

  • Cheon, Yong-Hee
    • Journal of Preventive Medicine and Public Health
    • /
    • v.21 no.2 s.24
    • /
    • pp.245-250
    • /
    • 1988
  • For the evaluation of change of FVC and $FEV_1$ after discontinuance of bronchodilator in the coal workers' pneumoconiosis patients, 17 pairs of patients were selected. They were matched by the age(${\pm}5$ y.o.) and the type of ventilatory impairment. Pulmonary function was measured 2 times bimonthly before and after the drug discontinuance discontinued after measurement of PFT for 2 times. In case group the bronchodilator was discontinued after measurement of PFT for 2 times. In control group there was no interruption of medication. FVC, $FEV_1$ decreased in both group as measurement progress. Simple linear regression coefficients against the month of measurement were calculated in both group and tested for parallelism between two groups. The results of test revealed that both regression coefficients were parallel. So in conclusively, discontinuance of medication of bronchodilator for coal workers pneumoconiosis patients has no effect on the decreasing rate of FVC, $FEV_1$.

  • PDF

Assessment of Radiation Dose from Radioactive Wedge Filters during High-Energy X-Ray Therapy

  • Back, Geum-mun;Park, Sung Ho;Kim, Tae-Hyung
    • Progress in Medical Physics
    • /
    • v.28 no.2
    • /
    • pp.45-48
    • /
    • 2017
  • This paper evaluated the amount of radiation generated by wedge filters during radiation therapy using a high-energy linear accelerator, and the dose to the worker during wedge replacement. After 10-MV photon beam was irradiated with wedge filter, the wedge was removed from the linear accelerator, and the dose rate and energy spectrum were measured. The initial measurement was approximately 1 uSv/h, and the radiation level was reduced to 0.3 uSv/h after 6 min. The effective half-life derived from the dose rate measurement was approximately 3.5 min, and the influence of AI-28 was about 53%. From the energy spectrum measurements, a peak of 1,799 keV was measured for AI-28, while the peak for Co-58 was not measured in the control room. The peaks for Au-106 and Cd-105 were found only measurement was done without wedge removement from the linear accelerator. The additional doses received by the radiation worker during wedge replacement were estimated to be 0.08-0.4 mSv per year.

An Analysis of the Track Irregularity Progress on the Various Track System in Urban Transit (도시철도 궤도시스템별 틀림진전에 대한 분석)

  • Ko, Jae-Hyun;Kim, Man-Cheol;Lee, Jee-Ha;Cho, Jun-Gon;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.311-319
    • /
    • 2011
  • Track accompanies the process that track alignment by traffic loads is changed. A change of track alignment affects the running safety and riding comfort of train. This is called a track irregularity. The most important task in maintaining the track is to manage these track irregularity within quality parameters. Today, track maintenance of urban transit is enforcing immediate maintenance about section exceeding a safety standard by applying track recording data got through Integrated Measurement. This method is advantage of being easy of the maintenance assesment in case of the running safety, but is disadvantage of being difficult in case of the riding comfort of train. In this study, we propose track irregularity deviation of each track system depending on the time series and present about utilization plans of the Track Irregularity Progress Rate.

  • PDF