• Title/Summary/Keyword: Measurement control criteria

Search Result 124, Processing Time 0.023 seconds

The Study for Establishing the Criteria of Measurement Items in the Monitoring System for the Steel-Box Girder Bridge by FEM Analysis (구조해석에 의한 강상자형교 상시계측시스템 계측항목별 관리기준치 설정 연구)

  • Joo, Bong-Chul;Park, Ki-Tae;You, Young-Jun;Lee, Chin-Hyung;Hwang, Yoon-Koog
    • Journal of Korean Society of societal Security
    • /
    • v.2 no.4
    • /
    • pp.35-41
    • /
    • 2009
  • If any bridge has the monitoring system, the bridge manager can check the history of bridge behavior and the progress of the damage more exactly. When the unexpected event (ex: earthquake and flood) happens, the manager can check the safety condition of the bridge and make the pertinent action for bridge management which is reduction of vehicle speed or traffic control through the system. Additionary the manager can make the well-timed repair or reinforcement through the system, so he can save the management cost or the life cycle cost. This study presents the method of setting the criteria by FEM analysis in bridge monitoring system, and the standard progress for setting the criteria about measurement items of monitoring system for the steel box type bridge.

  • PDF

Modified algorithmic LMI design with applications in aerospace vehicles

  • Chen, Tim;Gu, Anzaldi;Hsieh, Chiayen;Xu, Giustolisi;Wang, Cheng;Chen, C.Y.J.
    • Advances in aircraft and spacecraft science
    • /
    • v.8 no.1
    • /
    • pp.69-85
    • /
    • 2021
  • A modified fuzzy mechanical control of large-scale multiple time delayed dynamic systems in states is considered in this paper. To do this, at the first level, a two-step strategy is proposed to divide a large system into several interconnected subsystems. As a modified fuzzy control command, the next was received as feedback theory based on the energetic function and the LMI optimal stability criteria which allow researchers to solve this problem and have the whole system in asymptotically stability. Modeling the Fisher equation and the temperature gauge for high-speed aircraft and spacecraft shows that the calculation method is efficient.

Utilizing Optical Phantoms for Biomedical-optics Technology: Recent Advances and Challenges

  • Ik Hwan Kwon;Hoon-Sup Kim;Do Yeon Kim;Hyun-Ji Lee;Sang-Won Lee
    • Current Optics and Photonics
    • /
    • v.8 no.4
    • /
    • pp.327-344
    • /
    • 2024
  • Optical phantoms are essential in optical imaging and measurement instruments for performance evaluation, calibration, and quality control. They enable precise measurement of image resolution, accuracy, sensitivity, and contrast, which are crucial for both research and clinical diagnostics. This paper reviews the recent advancements and challenges in phantoms for optical coherence tomography, photoacoustic imaging, digital holographic microscopy, optical diffraction tomography, and oximetry tools. We explore the fundamental principles of each technology, the key factors in phantom development, and the evaluation criteria. Additionally, we discuss the application of phantoms used for enhancing optical-image quality. This investigation includes the development of realistic biological and clinical tissue-mimicking phantoms, emphasizing their role in improving the accuracy and reliability of optical imaging and measurement instruments in biomedical and clinical research.

Reliability Assessment Criteria of Module for the LED traffic signal (LED 교통신호등용 모듈의 신뢰성평가기준)

  • Kim, Jin-Sheon;Park, Chang-Kyu;Kim, Dae-Kyung;Jeong, Hai-Sung
    • Journal of Applied Reliability
    • /
    • v.10 no.4
    • /
    • pp.265-278
    • /
    • 2010
  • Module of the LED traffic signal is the core component for the care of driver and walker. Also it is important one to control the traffic. If it is against the criteria of brightness, it is the source of the people's death and traffic congestion. Therefore, it is a list of articles desired the security of stability. However, there is not the analysis of failure and not preserve the uniformity of quality. Therefore, it is necessary to establish the criteria of appreciation for the module of the LED traffic signal to analysis the data of failure. In this paper, we investigate the performance test, environment field test and test of reliability appreciation to improve the reliability. We also set up the criteria of success decision using the real measurement data.

Evaluation of Uncertainties in the Measurement of Ambient NO2 Level (대기 중 NO2 측정의 불확도 평가)

  • 이진홍;임종명;우진춘
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.18 no.5
    • /
    • pp.355-362
    • /
    • 2002
  • There has been relatively a few studies that focused on evaluation of uncertainty for standard methods by which criteria pollutants are analyzed in ambient air. Especially, uncertainty evaluation has not been made yet for sampling and analysis of airborne NO$_2$. Ambient NO$_2$ has been thought to be a major criteria pollutant worldwide because of the potential of ozone formation as well as of its own toxicity. In this study, we tried to assess uncertainties associated with the every step of sampling and of analytical procedure of Griess-Saltzman method. Quality assurance (QA) and quality control (QC) were also emphasized with the uncertainty characterization. The use of Griess-Saltzman method for ambient NO$_2$ analysis showed very uniform daily concentration distribution with the mean of 10.8 ppb and the standard deviation of 1.08ppb during the sampling period. However, seven daily samples collected at the same sampling time and place exhibited highly different concentration distribution. Therefore, we evaluated uncertainties associated with sampling and analysis through the precise application of ISO Guide. Estimates of expanded uncertainties for a total of 62 samples fell in a relatively broad range of 5.17% to 11.85%. On the other hand. the expanded uncertainties were smaller for the high concentration range of greater than 15ppb.

Proposal for CVAP of First Plant of APR+ NPP (APR+원전 최초 호기의 CVAP 수행에 대한 제언)

  • Kim, Dong-Hak;Ko, Do-Young;Kim, Maan-Won
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2014.10a
    • /
    • pp.399-401
    • /
    • 2014
  • The comprehensive vibration assessment program(CVAP) of APR+ nuclear power plant(NPP) is classified as non-prototype, category II with Palo Verde NPP as valid prototype. In this paper, CVAP for first plant of APR+ NPP is proposed. The Control Element Assembly(CEA) shroud of APR+ NPP is different from that of Palo Verde NPP. And the Core Support Barrel(CSB) outer diameter and the flow rate of normal operation of APR+ NPP are larger than those of Palo Verde NPP. Vibration and stress analysis program should be conducted to establish test acceptance criteria. Limited vibration measurement program should be implemented to establish the margin of safety, demonstrate the satisfaction of test acceptance criteria and confirm the similar vibratory response between the APR+ and Palo Verde NPP. Because of the change of normal operation condition, the nominal differences between APR+ and Palo Verde NPP in the structural and hydraulic analysis are studied to determine the measurement locations.

  • PDF

Problems and Improvements in the Quality Control of the Air Monitoring Network (대기오염측정망 정도관리의 문제점과 개선방향)

  • Kim, Duck-Sung;Park, Jeong-Ho
    • Journal of Environmental Science International
    • /
    • v.29 no.8
    • /
    • pp.847-855
    • /
    • 2020
  • This study presented problems and improvements in the quality control of an air monitoring network, using Gyeongnam as an example. 1) The effective utilization rate of the air monitoring was 95%, which showed good management, but the maximum of 2% was indicated by zero or detection limit among measurement data. 2) In the equivalence evaluation of PM2.5, the slope and intercept satisfy the evaluation criteria; however, 1% of the PM2.5/PM10 ratios were outliers. 3) All air monitoring stations meet the quality control standards; however, the management status is added to the quality inspection, management system is unified and the related budget is expanded, and systematic commission management is required.

Parameter estimation of a single turbo-prop aircraft dynamic model (단발 터어보프롭 항공기 동적 모델의 파라메터추정)

  • Lee, Hwan;Lee, Sang-Kee
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.4 no.1
    • /
    • pp.38-44
    • /
    • 1998
  • The modified maximum likelihood estimation method is used to estimate the nondimensional aerodynamic derivatives of a single turbo-prop aircraft at a specified flight condition for the best deduction of the dynamic characteristics. In wind axes the six degree of freedom equations are algebraically linearized so that the linear state equation contains aerodynamic derivatives in a state-space form and is used in the maximum likelihood method. The simulated data added with the measurement noise is used as a flight test data which is necessary to the estimation of nondimensional aerodynamic derivatives. It is obtained by implementing the 6-DOF nonlinear flight simulation. In the flight simulation, the effects of several control input types, control deflection amplitudes, and the turbulence intensities on the statistical convergence criteria are also examined and quantitative analysis of the results is discussed.

  • PDF

A Study on Earned Value Management System (EVMS) For Project Using ERP System (ERP 시스템을 이용한 프로젝트 EVMS에 관한 연구)

  • Park, Je-Won;Lee, Chang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.4
    • /
    • pp.145-151
    • /
    • 2010
  • It seems that a primary concern of the project-based company, which provides a large scale product or service over long term period, is to run a successful project through systematic project process control and control costs. One of the typical project control methods is Earned Value Management System(EVMS) which analyses the precess through performance measurement. Even though the EVMS is a highly efficient tool in the managerial aspect, it cannot easily determine the Planned Value(PV), Actual Cost(AC), or Earned Value(EV) due to the indistinct criteria and extensive data. The accurate calculation of AC in particular, is the basic of project management, but most companies record direct personnel expenses or direct expenses only. Since they calculate indirect expenses based on the estimated ratio, it limits the systematic project management that reflects changes in profit and loss of a company. This study introduces a EVMS for project management and its actual case based on EVMS and ERP system which some additional modules are installed for performance measurement. It is expected that this new method enables a company to save time and effort, and also to improve transparency by specifying expense items in detail and to switch quarterly settlement to monthly by reducing the time of calculation.

Evaluation of arousal level by EDA and fuzzy inference (피부전기 활동과 fuzzy추론에 의한 각성도의 평가)

  • Kim, Yeon-Ho;Ko, Han-Woo;Yoo, Jun
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1997.10a
    • /
    • pp.1856-1859
    • /
    • 1997
  • This paper describes the arousal measurement and the control system using fuzzy logic to prevent drowsy driving. Sugeno's method was used for fuzzy inference in this study. Membership function and rule base were determined form the modfied arousal level criteria. The output of fuzzy inference tracked well the change of subject's arousal level. When IRI(Inter-SIR interval) was under the 60sec, maximum output of three step warning method was medium sound, but that of fuzzy logic system was changed from medium to big. Furthermore, the output of the fuzzy inference was highly correlated with $N_{z}$(r=0.99). Therefore, the fuzzy inference method for evaluation and the control of arousal will be more effective at real driving sityation than three step warning method.ning method.

  • PDF