The Method of Improving the Procedure of Time Management for Measuring PPC(Percent of Plan Completed) (작업성취율 측정을 위한 공정관리절차의 개선 방안)

  • Lim, Chul-Woo;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.722-726
    • /
    • 2006
  • Last Planner System (LPS) developed by Lean Construction Institute consists of four steps: Master Schedule, Phase Schedule, Lookahead Planning and Weekly Work Plan. This paper focuses on the process of measuring Percent of Plan Completed (PPC) at the Weekly Work Plan stage. PPC means the percentage of weekly assignments completed. According to the results of the researches that deal with PPC from many other countries, we can assure the benefits of using PPC. However, the concept of PPC is unfamiliar in Korea construction industry. This paper analyzes the cases in which PPC is applied in other countries and compares them with the production control system in Korean construction industry. The results of this research will provide the time management system for using PPC in Korea.

  • PDF

A Study on the Systems Engineering Detailed Schedule for LRT Project (경량전철사업의 시스템엔지니어링활동을 위한 상세일정계획 작성방법 연구)

  • Han, Seok Youn;Kim, Joo Uk;Choi, Yo Chul;Kang, Do Hoon
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.8 no.2
    • /
    • pp.11-17
    • /
    • 2012
  • Suppliers in light rail transit project makes a systems engineering management plan(SEMP) as a top level plan which has a SEMS and SEDS as an control and monitoring means. In this paper, we analyze the international standards and some related documents, and present the directions to make the SEMS and SEDS which have WBS, accomplishments, schedule, events, person in charge. And then customize the project management tool and make SEMS and SEDS of LRT project as an example. The research results can be applied in LRT project after tailoring based on the project.

Improving the Workplace Experience of Caregiver-Employees: A Time-Series Analysis of a Workplace Intervention

  • Ding, Regina;Dardas, Anastassios;Wang, Li;Williams, Allison
    • Safety and Health at Work
    • /
    • v.12 no.3
    • /
    • pp.296-303
    • /
    • 2021
  • Background: Rapid population aging in developed countries has resulted in the working-age population increasingly being tasked with the provision of informal care. Methods: An educational intervention was delivered to 21 carer-employees employed at a Canadian University. Work role function, job security, schedule control, work-family conflict, familywork conflict, and supervisor and coworker support were measured as part of an aggregated workplace experience score. This score was used to measure changes pre/post intervention and at a follow-up period approximately 12 months post intervention. Three random intercept models were created via linear mixed modeling to illustrate changes in participants' workplace experience across time. Results: All three models reported statistically significant random and fixed effects intercepts, with a positive coefficient of change. Conclusion: This suggests that the intervention demonstrated an improvement of the workplace experience score for participants over time, with the association particularly strong immediately after intervention.

A Preliminary Research for Developing System Prototype Generating Linear Schedule (선형 공정표를 생성하는 시스템 프로토타입 개발을 위한 기초 연구)

  • Ryu, Han-Guk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.1-8
    • /
    • 2011
  • Linear scheduling method limits to present works of work breakdown structure as a form of lines and was often developed manually. In other words, linear schedule could not utilize activity, work breakdown structure, and etc. information of network schedule such as CPM(Critical Path Method) and has been used only for reporting or confirming construction master plan. Therefore, it is necessary to develop system which can automatically generating the linear schedule based on the network schedule having many accumulated and useful construction schedule information. Thus, this research has an effort to establish data process model, data flow diagram, and data model in order to make linear schedule. In addition, this research addresses the system solution structure, user interface class diagram and logic diagram, and data type schema. The results of this paper can be used as a preliminary research for developing linear schedule generating system prototype by utilizing the network schedule information.

Production planning in fish farm (어류양식장 생산계획에 관한 연구)

  • EH, Youn-Yang
    • The Journal of Fisheries Business Administration
    • /
    • v.46 no.3
    • /
    • pp.129-141
    • /
    • 2015
  • Because land based aquaculture is restricted by high investment per rearing volume and control cost, good management planning is important in Land-based aquaculture system case. In this paper master production planning was made to decide the number of rearing, production schedule and efficient allocation of water resources considering biological and economic condition. The purpose of this article is to build the mathematical decision making model that finds the value of decision variable to maximize profit under the constraints. Stocking and harvesting decisions that are made by master production planning are affected by the price system, feed cost, labour cost, power cost and investment cost. To solve the proposed mathematical model, heuristic search algorithm is proposed. The model Input variables are (1) the fish price (2) the fish growth rate (3) critical standing corp (4) labour cost (5) power cost (6) feed coefficient (7) fixed cost. The model outputs are (1) number of rearing fish (2) sales price (3) efficient allocation of water pool.

A Study on Periodic Buffer Allocation for Program Master Schedule (프로그램 공정계획을 위한 주기적 버퍼 설치에 관한 고찰)

  • Koo Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.81-87
    • /
    • 2001
  • In a dynamically changing environment, the manager of a maintenance and remodeling (M/R) program is confronted with an increasing complexity of coordinating and cooperating multi-resource constrained multiple projects. The root causes of the complexity, uncertainty and interdependence, cause an internal disruption of an activity and chain reactions of disturbance propagation that deteriorate the stability and manageability of the program. This paper evaluates previous endeavors to apply production control and management techniques to the construction industry, and investigates the possibility of applying other management concepts and theories to organizational program management. In particular, this paper proposes a buffer allocation model by which periodic buffers are allocated in the flows of program constraint resources to stabilize a program master schedule instead of protecting individual activities. Comparative experiments by Monte Carlo simulations illustrate improved performance of the proposed model in terms of program's goals: productivity, flexibility, and long-term stability.

  • PDF

A Systematic Approach Of Construction Management Based On Last Planner System And Its Implementation In The Construction Industry

  • Hussain, SM Abdul Mannan;Sekhar, Dr.T.Seshadri;Fatima, Asra
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.2
    • /
    • pp.11-15
    • /
    • 2015
  • The Last PlannerSystem (LPS) has been implemented on construction projects to increase work flow reliability, a precondition for project performance againstproductivity and progress targets. The LPS encompasses four tiers of planning processes:master scheduling, phase scheduling, lookahead planning, and commitment / weeklywork planning. This research highlights deficiencies in the current implementation of LPS including poor lookahead planning which results in poor linkage between weeklywork plans and the master schedule. This poor linkage undetermines the ability of theweekly work planning process to select for execution tasks that are critical to projectsuccess. As a result, percent plan complete (PPC) becomes a weak indicator of project progress. The purpose of this research is to improve lookahead planning (the bridgebetween weekly work planning and master scheduling), improve PPC, and improve theselection of tasks that are critical to project success by increasing the link betweenShould, Can, Will, and Did (components of the LPS), thereby rendering PPC a betterindicator of project progress. The research employs the case study research method to describe deficiencies inthe current implementation of the LPS and suggest guidelines for a better application ofLPS in general and lookahead planning in particular. It then introduces an analyticalsimulation model to analyze the lookahead planning process. This is done by examining the impact on PPC of increasing two lookahead planning performance metrics: tasksanticipated (TA) and tasks made ready (TMR). Finally, the research investigates theimportance of the lookahead planning functions: identification and removal ofconstraints, task breakdown, and operations design.The research findings confirm the positive impact of improving lookaheadplanning (i.e., TA and TMR) on PPC. It also recognizes the need to perform lookaheadplanning differently for three types of work involving different levels of uncertainty:stable work, medium uncertainty work, and highly emergent work.The research confirms the LPS rules for practice and specifically the need to planin greater detail as time gets closer to performing the work. It highlights the role of LPSas a production system that incorporates deliberate planning (predetermined andoptimized) and situated planning (flexible and adaptive). Finally, the research presents recommendations for production planningimprovements in three areas: process related, (suggesting guidelines for practice),technical, (highlighting issues with current software programs and advocating theinclusion of collaborative planning capability), and organizational improvements(suggesting transitional steps when applying the LPS).

Reproducibility of Measures of Lumbar Spine, Hip and Whole Body BMD according to Longitudinal Physical Activity in Older Athletes (노인 운동가에 있어 장기적인 운동에 따른 척추, 힙과 신체 총 골밀도 감소에 관한 재현성)

  • Jung, Youn-Soo
    • Journal of muscle and joint health
    • /
    • v.8 no.2
    • /
    • pp.278-286
    • /
    • 2001
  • With the aging of society a great deal of interest is being placed on the value of longitudinal data in evaluating physiological losses. We present data on test-one/test-two reliability and reproducibility for measures of training, bone density from a longitudinal study of master athletes. Fifty-two males (mean age at test $1=58.2{\pm}9.8\;years$) and thirty-two females ($54.4{\pm}8.8\;years$) were selected from the study population. Bone mineral density was determined using DEXA (Hologic 1500). The characteristics of the subjects are presented below as $means\;{\pm}\;S.D$. The data was imported into the Statistical Package for the Social Science (SPSS 9.0, Chicago, IL). Paired t-tests were performed between visit 1 and visit 2 in subjects. Pearson correlations were performed. The results of this study indicate the measures of training history, body mass and bone density are reasonably stable and reproducible. We conclude that body composition and bone density parameters are stable and reproducible over time in active older subjects. Physiologic measures in master athletes are fairly stable, and reproducible over time Longitudinal studies investigating age-related changes in master athletes need to be conducted on a time schedule of greater than two years.

  • PDF

A Study on the Performance Improvement of Message Transmission over MVB(Multifunction Vehicle Bus)

  • Choi, Myung-Ho;Park, Jae-Hyun
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2003.10a
    • /
    • pp.2198-2202
    • /
    • 2003
  • The data transmission of MVB(Multifunction Vehicle Bus) of TCN(Train Network Communication) is divided into the periodic transmission phase and the sporadic transmission phase. TCN standard defines the event-polling method for the message transfer in the sporadic phase. However, since the event-polling method does not use pre-scheduling to the priority of the messages to be transmitted, it is inefficient for the real-time systems. To schedule message transmission, a master node should know the priority of message to be transmitted by a slave node prior to the scheduling the sporadic phase, but the existing TCN standard does not support any protocol for this. This paper proposes the slave frame bit-stuffing algorithm, with which a master node gets the necessary information for transmission scheduling and includes the simulation results of the event-polling method and the proposed algorithm.

  • PDF

Practical setup time implementation in the roll-based manufacturing practice having print operations (인쇄공정이 있는 Roll 기반 제조업에서의 실용적 Setup Time 적용 방안)

  • Bae, Jae-Ho;Wang, Gi-Nam
    • IE interfaces
    • /
    • v.22 no.1
    • /
    • pp.85-94
    • /
    • 2009
  • Nowadays, most of the major manufacturing companies prepare their manufacturing schedule using package based solutions. Even though the accuracy of the detail scheduling result is high at implementation, however, it is low during maintenance period. The main cause of low accuracy during maintenance period is due to difficulties in maintaining the accurate level of master data. In this paper, we propose to easily maintain setup time, which is one of the most important factors required in master data to achieve good scheduling result, after changing job. This paper is mainly focused on how to deduce the factors that influence the setup time in a roll-based manufacturing field with print operations. For this purpose, we employed rule based algorithm and applied for deciding setup time for the existing product items. Likewise, it can be applied to new items without any complex setup procedures, and, finally, it displays the result of the real setup-time and calculated setup-time.