• Title/Summary/Keyword: Marine sedimentary soils

Search Result 3, Processing Time 0.017 seconds

Proposal of Equations related to Settlement and Lateral Movement According to Embankment on Marine Sedimentary Ground (해성퇴적지반에서 성토로 인한 침하량과 측방유동량 산정식 제안)

  • Kim, Kyeong-Su;Chung, Dae-Seouk;Lee, Jong-Gil
    • The Journal of Engineering Geology
    • /
    • v.20 no.2
    • /
    • pp.191-202
    • /
    • 2010
  • In this study, the relationship between the settlements and the horizontal displacements according to embankment was analyzed at the marine sedimentary grounds for preparation of a site, and then the empirical equations of both the settlement and the horizontal displacement considering the embankment load and the thickness were proposed. To do this, the field and laboratory tests were performed at the improvement section where the pre-loading method was applied, and the field monitoring was performed using various sensors. Based on the results of the tests and monitoring, the ground deposits, soil characteristics and engineering properties were analyzed and the settlements and lateral movements were estimated by the Regression analysis. The ground deposits from the ground surface were composed of reclaimed soils, sedimentary soils and based rocks. The thickness of clay in the sedimentary soils layer was ranged from 3.9 m to 44.5 m. The embankment heights to improve the ground during pre-loading were constructed from 4.7 m to 7.8 m in each section. The settlements during embankment were ranged from 0.959 m to 2.217 m and the lateral movements were ranged from 0.048 m to 0.313 m. As the result of regression analysis, the equations of settlements and horizontal displacements according to embankments may be proposed as $s=0.02h^2+0.11h$ and ${\delta}=0.01e^{0.37h}$, respectively. The proposed empirical equations of the settlements and the horizontal displacements according to embankment on the marine sedimentary ground may be applied to the site where has a similar condition of study area.

Analysis of Ground Movement During Diaphragm Well Panel Constructions in Sedimentary Marine Deposit (해성점토층에 실시된 지중연속벽 시공에 의한 지반의 변위 분석)

  • Lee Cheol-Ju
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.3
    • /
    • pp.43-54
    • /
    • 2005
  • The ground movements during three. full-scale trial diaphragm wall (DW) panel constructions were monitored and analysed. The DW panels were constructed in reclaimed fill where sedimentary marine deposit and residual weathered soils are being consolidated. The monitoring data showed exceptionally large lateral ground movements of up to 293 mm near a trench due to the DW panel constructions, which is about 0.8$\%$ D, where D is the maximum excavation depth. It was observed that deliberate holding period of the trench resulted in a significant increase in the lateral ground movements of about 50-225$\%$. A pre-treatment of the marine deposit by installing a single line of jet grout columns around the trench prior to the excavation was found to be a very effective way of reducing the ground movements. The measured ground settlements were compared with some relevant case histories. DW panel constructions in sedimentary marine deposit are likely to cause maximum ground surface settlement up to 0.225$\%$ D.

A study on the risk and settlement evaluation of a shield TBM excavated in soft marine sedimentary soils (해저 연약 퇴적층 지반 쉴드 TBM 위험요인 평가 및 장비 침하에 관한 연구)

  • You, Kwang-Ho;Park, Chi-Myeon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.4
    • /
    • pp.355-364
    • /
    • 2016
  • Recently, a 3,250 meter-long tunnel was constructed beneath the sea bed formed of composite sedimentary soils to transport reusable waste heat gas of industrial complex in the west coast of Korea. Some risks such as machine settlement always exist due to the uncertainties of geological and construction factors during the subsea shield TBM tunnelling. In this construction site, the deviation of tunnel alignment caused by shield TBM settlement was occurred during excavation. It was examined that the lack of bearing capacity of soft clay was a main cause. This paper evaluates the risk of shield TBM tunnelling considering the ground conditions. Correlation between machine settlement and its advance rate was evaluated through the analytical equation in which bearing capacity is considered and a 3-D numerical analysis which can simulate the TBM advance condition (in other words, the dynamic condition). It was found out that a shield TBM could settle due to the insufficient bearing capacity of soft clay layers. In order to prevent such the problem, the best advance rate proper to the ground characteristics is needed to be applied. In the ground conditions of the section of interest, it was turned out that if the shield TBM advance rate was maintained between 35 mm/min and 40 mm/min, the machine settlement could be avoided.