• Title/Summary/Keyword: Management priority

Search Result 1,916, Processing Time 0.03 seconds

Business Process Evaluation and Case Study for Sequential Application of BPM

  • Song, Young-Woong;Lim, Hyung-Chul;Choi, Yoon-Ki
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.2
    • /
    • pp.36-44
    • /
    • 2012
  • Adoption and practical application of BPM yet remains at a theoretic and methodological level for many industrial sectors. As for construction industry, adapting BPM into enterprise resource across all business processes could cause problems due to rapid change in corporate operation systems. Furthermore, it is unable to predict potential risks of business process while BPM are being applied. Therefore, applying BPM model to core strategy and individual task seems more effective than applying BPM model to the entire enterprise resource planning. In this paper, we define BPM and suggest a BPM model by analyzing each business unit in order to evaluate each business unit which is included in the business process architecture based on quantitative standards. This paper also presents a sequential application plan for business process model. Finally, a case study is demonstrated for the application of BPM system, focusing on cost management business, which turned out to be a top priority in the aspect of efficiency and ease based on priority analysis.

The Failure Mode and Effects Analysis Implementation for Laser Marking Process Improvement: A Case Study

  • Deng, Wei-Jaw;Chiu, Chung-Ching;Tsai, Chih-Hung
    • International Journal of Quality Innovation
    • /
    • v.8 no.1
    • /
    • pp.137-153
    • /
    • 2007
  • Failure mode and effects analysis (FMEA) is a preventive technique in reliability management field. The successful implementation of FMEA technique can avoid or reduce the probability of system failure and achieve good product quality. The FMEA technique had applied in vest scopes which include aerospace, automatic, electronic, mechanic and service industry. The marking process is one of the back ends testing process that is the final process in semiconductor process. The marking process failure can cause bad final product quality and return although is not a primary process. So, how to improve the quality of marking process is one of important production job for semiconductor testing factory. This research firstly implements FMEA technique in laser marking process improvement on semiconductor testing factory and finds out which subsystem has priority failure risk. Secondly, a CCD position solution for priority failure risk subsystem is provided and evaluated. According analysis result, FMEA and CCD position implementation solution for laser marking process improvement can increase yield rate and reduce production cost. Implementation method of this research can provide semiconductor testing factory for reference in laser marking process improvement.

Decision Making of Seismic Performance Management Using Seismic Risk Assessment (지진위험도평가 방법을 이용한 내진성능관리 의사결정)

  • Kim, Dong Joo;Choi, Ji Hye;Kim, Byeong Hwa
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.23 no.6
    • /
    • pp.329-339
    • /
    • 2019
  • The strategy for the management of earthquakes is shifting from post recovery to prevention; therefore, seismic performance management requires quantitative predictions of damage and the establishment of strategies for initial responses to earthquakes. Currently, seismic performance evaluation for seismic management in Korea consists of two stages: preliminary evaluation and detailed evaluation. Also, the priority of seismic performance management is determined in accordance with the preliminary evaluation. As a deterministic method, preliminary evaluation quantifies the physical condition and socio-economic importance of a facility by various predetermined indices, and the priority is decided by the relative value of the indices; however, with the deterministic method it is difficult to consider any uncertainty related to the return-year, epicenter, and propagation of seismic energy. Also this method cannot support tasks such as quantitative socio-economic damage and the provision of data for initial responses to earthquakes. Moreover, indirect damage is often greater than direct damage; therefore, a method to quantify damage is needed to enhance accuracy. In this paper, a Seismic Risk Assessment is used to quantify the cost of damage of road facilities in Pohang city and to support decision making.

Analyzing Priority Management Areas for Domestic Cats (Felis catus) Using Predictions of Distribution Density and Potential Habitat (고양이(Feliscatus)의 분포밀도와 잠재서식지 예측을 이용한 우선 관리 대상 지역 분석)

  • Ahmee Jeong;Sangdon Lee
    • Journal of Environmental Impact Assessment
    • /
    • v.32 no.6
    • /
    • pp.545-555
    • /
    • 2023
  • This study aimed to predict the distribution density and potential habitat of domestic cats (Felis catus) in order to identify core distribution areas. It also aimed to overlay protected areas to identify priority areas for cat management. Kernel density estimation was used to determine the distribution density, and areas with high density were classified in Greater Seoul, Chungnam, Daejeon, and Daegu. Elevation, distance from the used area and roughness were identified as important variables in predicting potential habitat using the MaxEnt model. In addition, the classification of suitable and unsuitable areas based on thresholds showed that the predicted presence of habitat was more extensive in Seoul, Sejong, Daejeon, Chungnam, and Daegu. Core distribution areas were selected by overlapping high-density areas with suitable areas. Priority management areas were identified by overlaying core distribution areas with designated wildlife sanctuaries. As a result, Gyeonggi, and Chungnam have the largest areas. In addition, buffer zones will be implemented to effectively manage the core distribution area and minimize the potential for additional introductions in areas of high management priority, such as protected areas. These results can be used as a basis for investigating the status of the cat's habitat and developing more effective management strategies.

Proposal Methodology for Disaster Risk Analysis by Region Using RFM Model (RFM 모형을 활용한 지역별 재해 위험도 분석 방법론 제안)

  • Kim, TaeJin;Kim, SungSoo;Jeon, DaHee;Park, SangHyun
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.3
    • /
    • pp.493-504
    • /
    • 2020
  • Purpose: The purpose of this study is to propose an analytical methodology for selecting the priority of preventive projects in the course of carrying out disaster prevention projects that improve disaster-hazardous areas. Method: Data analysis was performed using RFM model which can divide data grade and perform target marketing based on Recency, Frequency, and Monetary. Result: The top 10% of the area with high RFM value was mainly in the East Sea and the South Sea coast, and the number of damage in private facilities was high. Conclusion: In this study, we used the RFM model to select the priority of disaster risk and to implement the regional disaster risk using GIS. These results are expected to be used as basic data for selecting priority project sites for disaster prevention projects and as basic data in the decision-making process for disaster prevention projects.

Characteristics of Road Slopes and Decision of Priority for Investigation at the Central part of Vietnam (베트남 중부지방 도로비탈면 노출 특성 및 조사우선순위 결정 연구)

  • Kim, Seung-Hyun;Kwon, O-Il;Kim, Jae-Jung;Koo, Hobon
    • The Journal of Engineering Geology
    • /
    • v.27 no.3
    • /
    • pp.275-292
    • /
    • 2017
  • Large landslides have occurred more than 100 times each year by the influence of cyclones and torrential rain each year in Vietnam. Nevertheless, they $don^{\circ}$Øt have a scientific management system to prevent the landslide disaster in advance. In this study, we acquisited the risk factor and damage factor about each slope throughout basic survey at Hoang Sa Costal Road, Danang and at Ho Chi Minh Road, Quangnam. The priority of investigation technique considering of the exposure characteristics of the road slope in Vietnam developed by the empirical analysis with the acquired data. As a result, we can set the foundation of scientific management for the road slope management system in Vietnam.

Visitors' Perceptions on Trail Use in Korean National Parks -Case Studies in Bukhansan and Chiaksan National Park- (국립공원 탐방로 이용에 대한 이용객 인식 -북한산, 치악산국립공원을 중심으로-)

  • Yoo Ki-Joon;Kwon Tae-Ho
    • Korean Journal of Environment and Ecology
    • /
    • v.18 no.4
    • /
    • pp.437-445
    • /
    • 2004
  • The purpose of this study was to provide basic visitor and trail use data for developing trail management strategies in Korean national park system. To accomplish the purpose of the study, a questionnaire survey was carried on at two different national parks(Bukhansan and Chiaksan National Park). As for the results, root and rock exposure on the trails and trail width expansion were perceived as major types of trail impact. In addition, majority of respondents pointed to construct or maintain facilities on steep paths and repair trail surface as for the priority of trail maintenance. In conclusion, the priority of trail management and maintenance has to be differently determined based on each trail conditions because visitor impacts on the trails vary along with site-specific and activity-specific differences. Findings of the study expect to be used as fundamentals in trail management strategy making for Korean national parks.

An Estimation on Development Capacity under Urban Growth Management Policies: A Case of Maryland in the U.S. (도시성장관리정책 하에서의 개발용량 추정과 정책적 함의: 미국 매릴랜드 주를 사례로)

  • Sohn, Jung-Yul;Knaap, Gerrit
    • Journal of the Korean Geographical Society
    • /
    • v.43 no.1
    • /
    • pp.52-70
    • /
    • 2008
  • Using MD Property View database on 15 counties in Maryland in the U.S., this study attempts to explore the estimation process on the housing development capacity under the Maryland's urban growth management policy known as the Smart Growth Initiatives. This study also seeks to draw the implications of the estimated development capacity by individual counties on successful implementation of the urban growth management policy. The finding shows that this region has land for residential use enough to accommodate growth for the next 30 years. However, contrary to the goal of the Smart Growth Initiatives, a majority of development capacity is located not only outside the Priority Funding Area designated by the Smart Growth Initiatives but also at counties that are located far away from the major metropolitan area. In addressing this problem, the state does not need to either abolish or immediately expand the Priority Funding Area. Rather, the state requires local governments to include housing elements in their comprehensive planning, to provide periodic estimates on housing and employment capacity, and to establish and manage database on the location and the capacity of developable land.

Study on Improvement Plan of System through Analysis of Ground Sink Accidents - Focused on the management of underground facilities and their surrounding ground - (지반함몰 사고 분석을 통한 제도 개선안 연구 - 지하시설물 및 주변지반 관리 중심으로 -)

  • Kim, Dong-jin;Lee, Jong-keun;Kim, Hong-kyoon;No, Tae-kil
    • Journal of the Korea Institute of Construction Safety
    • /
    • v.3 no.1
    • /
    • pp.18-24
    • /
    • 2020
  • The purpose of this study is to propose a system improvement plan to prevent ground sinking accidents. To do this, follow the procedure below. First, it defines terms that are used interchangeably, such as ground subsidence and ground depression. Second, analysis of the current status and cause of ground sink, and the analysis of the correlation between rainfall and ground sink causes, derives priority management causes. Third, we propose a system improvement plan for the cause of priority management. As a result, damage to underground pipes and inadequate underground works were identified as the cause of priority management, and two system improvement plans to manage them were proposed. The results of this study can be used as basic data for improving the system for more effective prevention of underground sink in the future.

An Algorithm for Multiple Compensatory Objectives Problems

  • Yang, Kwang-Min
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.7 no.2
    • /
    • pp.31-39
    • /
    • 1982
  • This paper presents an efficient algorithm both in computation speed and storage requirement by exploring the special structure of problems involving multiple objective goals. The algorithm developed here is limited to the problems with multiple, compensatory objectives, however it can be extended to‘traditional’preemptive priority goat programming problems. Computational results are included.

  • PDF