• Title/Summary/Keyword: Management plan

Search Result 7,029, Processing Time 0.038 seconds

Practical Project Behavior Management Methods for Large-scale IT Projects (대규모 IT 프로젝트를 위한 실용적 행태관리 방안)

  • Kim, Min-Seon;Song, Sung-Hwan;Kim, Yong-Sik
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.7
    • /
    • pp.4897-4911
    • /
    • 2015
  • Technology developments accelerate the change of the society and companies with unparalleled pace, so large scaled projects are in progress urgently. Large scaled projects deal with high technologies and massive tasks, and these need enormous labor force and costs, it is necessary to manage strategic conflicts based on human psychology and complex system theory. However, traditional management plan fails to suggest practical mechanism for successful projects. We study failure cases and key elements, leadership for projects, and suggest project management plan with psychological and behavioral economy approach by focusing on complexity and conflict structure on large scaled projects. Project behavior management plan, suggested in this study, is designed with phased strategy and practice to solve the failure of large scaled IT projects originally and preemptively. We verified the effectiveness of behavior management plan suggested by investigating experts and working groups, and stable projects are to be progressed with introducing this plan on large-scaled projects.

A Study on Developing the Guideline of Risk Management utilizing BCP technique for Airport Corporation (공항전문기업의 BCP기법을 활용한 위기대응 가이드라인 개발에 관한 연구)

  • Seo, Byung Seok;Shin, Do Hyoung
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.2
    • /
    • pp.67-78
    • /
    • 2015
  • The purpose of the establishment of corporation's Business Continuity Plan(BCP) is to maintain corporations' own business and establish the response plan in order to resume operation in a short time period when crisis situations occur due to natural disaster and human error. This study has presented all types of procedures and criteria which are needed to establish the airport crisis response system in order to maintain the business continuity by utilizing BCP technique. Basically the risk response procedures must be established in the process of (1) preparation stage, (2) plan development stage, (3) documentation stage, (4) test & maintenance stage. The guideline has been suggested that each stage must be carried out in the sequence of Policy & Planning Responsibility, Business Impact Analysis, Recovery Strategy & Plans, Emergency Plan & SOP, Training Awareness and Maintenance & Review

A study on the basic conception of the Saemangeum Agricultural Land Landscape Plan (새만금 농생명용지 경관계획 기본구상 연구)

  • Park, Young-Jun;Lim, Cheong-Ryong
    • Journal of Korean Society of Rural Planning
    • /
    • v.29 no.1
    • /
    • pp.1-10
    • /
    • 2023
  • This study aims to establish a landscape plan that can preserve the identity of the region while meeting the unique functions related to land use of the Saemangeum agricultural land. In addition, it was intended to prepare a mid- to long-term landscape plan basic concept for the formation and management of the Saemangeum agricultural land landscape. Therefore, in this study, landscape management by type for processing/storage facilities, production/processing facilities, complex/sales facilities, and research/experimental facilities for facilities scheduled to move in after setting the direction and five strategies for landscape management considering the specificity of agricultural land direction was set. In addition, the landscape management direction for 6 common landscape elements such as buildings, open spaces, advertisements, colors, public facilities, and night scenery was also presented. In particular, Agroworks, Agro City, and Agro Town, which are important landscape areas, are landscape-focused management areas, and the landscape management direction for the area has been established. This study is considered to have great utility value when setting landscape standards for public or private buildings and infrastructure, development projects, etc. to be moved in prior to establishing a landscape plan for agricultural land. It is expected that it can be used as a basis for deliberation and review of the landscape standards derived from this study in the future landscape-related licensing for agricultural land.

Establishment of Informatization Plan for the Construction of Integrated Management System of Agricultural Water (농촌용수 통합관리체계 구축을 위한 정보화 계획 수립)

  • Choi, Hyun Seong;An, Se Hee
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.59 no.5
    • /
    • pp.61-72
    • /
    • 2017
  • The purpose of this study is to establish an integrated management system for the efficient management of rural water, to improve current problems, and to lay the foundations for active use of rural water information. We proposed a plan for informatization with a focus on establishing a database that can be used to provide customized services to users by applying advanced IT technology and to strengthen the management system of cities and counties with poor information. Data linkage and integration, user service development and integration system, application of IT technology, advanced decision support for rural water management, strengthening of city and county management system And the details of the implementation of the key project were presented.

Technical Management Planning Process of Engineering Project (개발 프로젝트의 기술관리 계획 프로세스)

  • Yoo, Il Sang;Park, Young Won
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.1 no.2
    • /
    • pp.63-68
    • /
    • 2005
  • This study developed the planning process for technical management of engineering project applying systems engineering process in order to correctly design technical management activities early during the system development projects. The developed process describes a systemic design process of a product to be developed as well as the development process and the personnel team of project organization. As an outcome of the process implemented by a Model-Based Systems Engineering(MBSE) software, a systems engineering management plan(SEMP) and a risk management plan can easily be produced.

  • PDF

A Study on the Revitalization Plan of Changwon Persimmon Theme Park by Analyzing the Actual Condition of Rural Theme Park (농촌테마공원 실태분석을 통한 창원단감테마공원 활성화 방안)

  • Choi, Young-Wan;Eun, Hee-Chang;Kim, Young-Joo
    • Journal of Korean Society of Rural Planning
    • /
    • v.23 no.4
    • /
    • pp.91-98
    • /
    • 2017
  • The purpose of this study is to analyze the actual condition of the already established rural theme park, draw the weak and strong points, and come up with an efficient performance plan for Changwon Persimmon Theme Park through the benchmarking of the best overseas case. According to the analysis, it is necessary to introduce a facility and a program for family customers as a plan for promoting Changwon Persimmon Theme Park. It is required to secure safety through public operation and management, improve scalability of the facility through the establishment of multi-functional complex facility, and come up with a plan for operating a special program associated with local resources. Therefore, this study drew three activation factors: the establishment of operation and management system, the development of operation contents by facility, and the establishment of operation in each area. First, to establish the operation and management system, it is necessary to classify the organization of the theme park into the operation business area and into operation & management area by job function. Secondly, it is necessary to establish a special program in consideration of space and facility, suggest a differentiated plan for operation contents, and create a facility operation plan and program for Changwon Persimmon Theme Park. Lastly, to operate and manage Changwon Persimmon Theme Park smoothly, it is necessary to set the theme park space as open collaboration space which the local residents can share and participate in by avoiding the conventional administration-based business performance and operation. This study suggested the plan for establishing an operation and management system for Changwon Persimmon Theme Park and its operation, the establishment of a special program, a business performance strategy, and the use of internal and external spaces of the theme park.

A Study on the Management Plan through Performance Maintenance Analysis of Explosion-proof Facilities (방폭설비 성능유지 실태분석을 통한 관리방안 연구)

  • Kwon, Yong Jun;Byeon, Junghwan
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.2
    • /
    • pp.8-16
    • /
    • 2020
  • In Article 311 of the Regulation on Occupational Safety and Health Standards requires the use of Korean Industrial Standards Act in accordance with the Industrial Standardization Act. However, the classification, inspection, maintenance, design, selection, and installation of explosion hazard locations for explosion and explosion prevention and internalization of 'safety' in the performance maintenance phase of electrical machinery and equipment There is no technical and institutional management plan for remodeling and alteration. Analysis of actual conditions and problems related to the installation, use, and maintenance of explosion-proof equipment, comparative analysis of domestic and international technical standards and systems, technical, institutional and administrative systems and systems related to installation, use, and maintenance of explosion-proof equipment, technical personnel and qualifications, etc. It is to propose legislation, system improvement, and technical standard establishment related to the maintenance of explosion-proof facility performance through improvement of the necessity and feasibility study for establishment of the legal status of the management site and management plan. As technical measures, KS standard revision (draft), KOSHA guide (draft) and explosion-proof facility performance maintenance manual were presented. In addition, the institutional management plan proposed the revised rule on occupational safety and health standards, the revised rule on the restriction of employment of hazardous work, and the manpower training program related to the maintenance of explosion-proof facilities and the qualification plan. Enhance safety at the installation, use, and maintenance stage of explosion-proof structured electrical machinery. It is expected to be used to classify explosion hazards, select related equipment, and to update and standardize standards related to installation, use and maintenance.

A Study on the Development of Evaluation Criteria in the Business Continuity Management System(Focusing on the 'Understanding the organization' in Plan of the ISO 22301) (업무연속성관리체계(BCMS) 평가지표 개발에 관한 연구(ISO 22301 Plan의 '조직의 이해'를 중심으로))

  • YoungKyun Jung;ChongSoo Cheung
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.2
    • /
    • pp.363-371
    • /
    • 2023
  • Purpose: This paper aims to develop evaluation criteria of Plan- 'Understanding the Organization' in the PDCA(Plan-Do-Check-Act) requirements of ISO 22301 which is a global standard in the area of BCMS(Business Continuity Management System). Method: The group of 20 experts in the BCMS checked for the validity of the evaluation criteria of Plan- 'Understanding the Organization' by the modified Delphi technique and relative importance are surveyed by the group. Results: As a result, the 12 evaluation criteria with relative importance that can be applied for BCMS evaluation of the organizations are developed and proposed. Conclusion: In order to introduce a quantitive evaluation in the BCMS, it was concluded that evaluation criteria need to be chosen and given relative importance, thus the criteria with the importance could be used for effective evaluation

The Study for Reliability Management Plan of Tilting Train (틸팅열차 신뢰성 관리체계 구축에 관한 연구)

  • Park Kwang-Bok;Han Song-Ho
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.183-191
    • /
    • 2004
  • This report was studied about the reliability management of tilting train operated at main line of the domestic. And we provided of the reliability management plan for to ensure required reliability through control and management of a train, a main system, a subsystem and a components of tilting train under developing. This report will be described organization, management, activities, etc for reliability management of tilting train.

  • PDF

IMPROVEMENT OF TACT SCHEDULE MANAGEMENT PROCESS FOR THE FINISH WORK OF APARTMENT HOUSES

  • Joo-Young Jung;Sang-Ho Yoon;Kyung-Kook Lee;Chang-Gyo Kim;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.554-562
    • /
    • 2007
  • This study determined tact process paths by separating the finish works according to the properties of work areas and work relations in order to apply the tact schedule management to the finish works. In addition, by suggesting preparing and sharing the workflow charts, the experiments can be shared between the executors and any possible frictions between the specialist works can be identified in advance. In addition, any errors on the plan can be reviewed and modified through the measurement stage of tact plan attainment rate. The process of tact schedule management is improved with such tools and methods and the efficiency of the process through the application of cases was verified.

  • PDF