• Title/Summary/Keyword: Management plan

Search Result 7,006, Processing Time 0.033 seconds

A Case Study on Information Strategy Plan of the Web Based on Project Management Information System for Construction Company (전사 웹기반 사업관리시스템 구축을 위한 정보화전략계획에 관한 사례연구)

  • Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.2D
    • /
    • pp.259-267
    • /
    • 2008
  • Nowadays PMIS (Project Management Information System) based on web is widely applied to communication, collaboration and community in construction jobsite for various organization such as subcontractors, general contractor, engineering company, supervisors and client. However, individual PMIS in jobsite is prone to be troublesome issue for integration and exchange of information regarding project management in corporate and may result in conflict of data application. The main reason should be lack of information strategy plan such as company master plan for information. This research shows a critical success factor that a big construction company of Korea establishes procedure and method for information strategy plan. In addition, It is to suggest how to be implemented PMIS architecture and execute business process innovation in corporate level. This research expects contribution that many construction companies reduce mistakes to be implemented management information system and to optimize system in corporate level.

A Study on the Activation of 4-H Farming Organization for development of Environmental-Friendly Agriculture (친환경농업육성을 위한 영농 4-H조직의 활성화 방안)

  • Yoo, Duck-Ki
    • Korean Journal of Organic Agriculture
    • /
    • v.13 no.1
    • /
    • pp.23-51
    • /
    • 2005
  • In this article the author provided a brief introduction to the function and activation of 4-H fanning organization. The strategies developed to improve the environmental-friendly Agriculture are as following : the efficiency cooperatives of 4-H fanning organization, invitation of the upbringing plan of organization leader for promotion of the pilot region project of environmental-friendly Agriculture connected with green tourism, the establishment of reasonable management plan and strategies. In conclusion, there must be strategic measures to increase the income of environmental-friendly farmers. All of this information could be useful for the further development of the strategy for environmental-friendly Agriculture in organization and management.

  • PDF

Management Plan for the Production of Safe and High Quality Drinking Water From the Paldang Lake (고 품질 수돗물 생산을 위한 팔당 수질관리 방안)

  • Cho, Deok-Hee;Kim, Jong-Soo;Lee, Woo-Sik
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.22 no.6
    • /
    • pp.665-672
    • /
    • 2008
  • It is necessary to implement the management plan for the production of safe and high quality drinking water from lake Paldang. To set up the plan, the water quality items such as BOD, T-P, SS and coliform were monitored for ten years, 1997~2006, and the influence of raw water quality on the drinking water treatment process and the treated water quality was also evaluated from 2004 to 2006. In conclusion, water quality items such as turbidity(SS), T-P(eutrophication), pathogens(fecal coliforms, enterovirus, reovirus, giardia, cryptosporidium), DOC(precursor of disinfection by-products), and micro-pollutants(phthalates, VOCs, heavy metals) are should be managed to get safe and high quality drinking water from lake Paldang.

A Study on the Implementation of the Safety Management Plan in the Construction Technology Promotion Act (건설기술진흥법 안전관리계획서의 실행방안에 관한 연구)

  • Shin, Sung-Su
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.104-105
    • /
    • 2018
  • The purpose of the safety management plan under the Construction Technology Promotion Act is to improve the quality and safety of construction engineers during construction work. To prevent a collapse accident of a facility after completion by preventing a collapse accident of gravel, an earthwork, a river structure or the like. In order to prevent collapses, the purpose of the project is to study measures to improve the ability of construction technology promotion law to ensure the quality of construction materials at the time of construction work.

  • PDF

Identification of Primary Activity and Management Plan for Construction Standard Unit Price (건설공사 표준시장단가 핵심공종 도출 및 중점관리방안)

  • Jin, Zheng-Xun;Baek, Seung-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.10
    • /
    • pp.589-601
    • /
    • 2020
  • The Construction Standard Unit Price (CSUP) sets the standard for calculating the estimated construction cost. The CSUP is used as basic data for preparing a standard price for public construction. Currently, the CSUP is calculated in consideration of the market and construction field conditions. However, a long-term management plan was established to prepare revised standards. As part of the plan, a field survey was conducted on changes in construction conditions and market prices. However, the plan continued for more than 5 years. Thus, the plan has a problem of difficulty continuously managing primary activities that have high importance and high price volatility. Therefore, to efficiently manage the CSUP, this study identifies the primary activities of the CSUP and presents a management plan. Through importance analysis and unit price volatility analysis, 242 primary activities in 35 activity groups were identified. Also, a management plan is presented based on the importance levels of activities. The primary activities and management plan could enable the timely revision of important activities. The results of this study provide a base for reflecting the appropriateness of construction cost criteria on time.

Foundation of Park Management Plan to Consider Ecological Aspects Based on Environment.Ecology Research and Analysis in Bulamsan Urban Nature Park (불암산도시자연공원의 환경생태 현황 조사.분석을 통한 생태적 측면에서의 공원관리계획 수립)

  • Lee Soo-Dong;Choi Jin-Woo;Lee Kyong-Jae;Han Bong-Ho
    • Korean Journal of Environment and Ecology
    • /
    • v.20 no.2
    • /
    • pp.170-187
    • /
    • 2006
  • The purpose of this study is to provide a basic datd for establishing a basic park management plan for Bulamsan Urban Nature Park. This research surveys very closely about the present condition of the natural ecosystem based on the examination and analysis of the present condition. This research suggests development and management methods for environment-friendly park by understanding damages on the ecosystem due to overuse, as well as park facilities and their effects on the surrounding environment, using quantative analysis. The three steps: researching the present condition research, ecosystem evaluation, and park management plan were taken in order. The present condition research is based on the general condition, natural environment, and natural ecosystem data. In the ecosystem evaluation, wildlife habitats evaluation, landscape evaluation, and biotope type research which is a materialized form of the plant ecosystem were excuted based on the present condition research data. In the park management plan step, 1) classified ecosystem and landscae preservation zone, ecosystem protection zone and ecosystem restoration zone as ecosystem and landscape preservation plan, 2) plannings for ecosystem, fine landscape preservation, damaged area restoration and recovery plan were established in order to suggest environment-friendly plan,

Development of Strategic Environment Assessment Model in Urban Development Plan - In case of Metropolitan Plan - (도시개발 행정계획의 전략환경평가 모델개발 - 광역도시계획에의 사례적용 -)

  • Choi, Hee-Sun;Song, Young-Il
    • Journal of Environmental Impact Assessment
    • /
    • v.19 no.4
    • /
    • pp.381-396
    • /
    • 2010
  • It is essential to consider strategies, spatial planning, and reflection of sustainability for the creation of sound urban spaces. To this end, there is a need for plans that can secure better sustainability through strategic environmental assessment (SEA) of plans. This study examined the literature and available precedent to develop a SEA model for administrative plans for urban development including metropolitan plans, urban master plans and urban management plans. In the course of development of the model, environmental issues associated with the urban plans were analyzed by classifying them into ten categories, including "spatial planning," "conservation planning," "greenbelt systems," "habitats." and etc. according to their rank. Furthermore, those issues were reflected on the development of environmental evaluation indices for the plans. Overall and detailed environmental indices that can be applied to the administrative plans for urban development including metropolitan plans, urban master plans and urban management plans were devised for five stages: (1) Establishment of development goals and strategy, (2) Analysis of current status and characteristics, (3) Conceptualization of spatial structure, (4) Planning for each department, and (5) Execution and management. Sub plans are more detailed and concrete. Criteria based on the evaluation indices, when performing evaluations on plans based on each environmental assessment index in reference to experts and the literature, were used to forecast their effects, i.e. whether they had a positive, negative, or no effect or relationship, or whether their effects was uncertain. Based on the forecasts, this study then presents means to establish more improvable plans. Furthermore, by synthesis of the effects according to each index and integration of the process, plans were analyzed overall. This study reflects the characteristics of the present time period based on issues in the SEA process and techniques in upper level administrative plans being newly established, and presents them according to the stage of each plan. Furthermore, by forecasting the effect of plans by stage, this study presents proposals for improvement, and in this aspect, can be meaningful in promoting plan improvements through SEA.

The First Global Management Plan for the Urban Landscape Restructure in Tokyo

  • Iglesias, Fernando;Shinji, Isoya
    • Journal of the Korean Institute of Landscape Architecture International Edition
    • /
    • no.1
    • /
    • pp.176-182
    • /
    • 2001
  • The case for study in this paper is the Main Plan and Management for the Fukutoshin; the restructure of Nishi Shinjuku, This plan was first outlines in 1960, and includes a vast area of 96 ha for redevelopment. It aims to create a totally new center in the city. This was the first case in Japan, and in the world of a plan of these magnitudes. involving urban landscape restructuring from three points: Landscape (open spaces for public use: the Shinjuku Central Park and the surrounding area of the buildings), transport and commercial building developments. The Landscape plan for the green areas was decided in a way to compensate the population of the area and the visitors. As a rule, high-rise building constructions are placed each one in single lots and are surrounded by open spaces and greenery. Pedestrain areas are widened and also connected by bridges in a way to allow free circulation, and interconnection between the constructions and the green areas. Another important factor is the role that Private Corporation, and public interest plays. Joining these two forces has allowed the concretization of this project. This interpolation between public and private roles was an innovation in Japan, and it also the key for the concretion of the project. The historical review of the process and management of this project help us to put into perspective the introduction of new concepts and ideas, which were not related at that time to traditional Japanese Landscaping. Furthermore we are better able to understand the substantial increase in the percentage of land dedicated to green areas in contrast to the typical standards of Japanese cities.

  • PDF

Water Resources Management Challenge in the Citarum River Basin, Indonesia

  • Wicaksono, Albert;Yudianto, Doddi;Jeong, Gimoon;Kang, Doosun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.198-198
    • /
    • 2016
  • The Citarum River Basin is the biggest river basin in West Java Province, Indonesia and it plays strategic roles in providing water for irrigation, domestic and industrial uses, and power generation, besides controlling the flood during rainy season. Flowing through seven major cities makes the river flow and water demand are vulnerable to land use change around the river. The present water resources management has involved the regulator, operator, and users in deciding an appropriate water management plan for the entire basin. The plan includes an operation plan for three reservoirs, construction or maintenance of the river channel, and water allocation for all users along the river. Following this plan, a smaller operation group will execute and evaluates the plan based on the actual flow condition. Recently, a deforestation, environment degradation, river sedimentation, a rapid growth of population and industry, also public health become new issues that should be considered in water basin planning. Facing these arising issues, a new development program named ICWRMIP was established to advance the existing management system. This program includes actions to strengthen institutional collaboration, do the restoration and conservation of the river environment, improve water quality and public health, also advance the water allocation system. At present, the water allocation plan is created annually based on a forecasted flow data and water usage prediction report. Sometimes this method causes a difficulty for the operator when the actual flow condition is not the same as the prediction. Improving existing system, a lot of water allocation studies, including a development of the database and water allocation simulation model have been placed to help stakeholders decide the suitable planning schemes. In the future, this study also tries to contribute in advancing water allocation planning by creating an optimization model which ease stakeholders discover a suitable water allocation plan for individual users.

  • PDF

A Study on the Systems Engineering Management Plan for the Korean High-speed Electric Multiple Unit 400km/h Experimental (차세대 고속열차 개발을 위한 시스템엔지니어링 관리계획 연구)

  • Lee, Tae Hyung;Choi, Sung Hoon;Kim, Sang Soo;Park, Choon Soo;Kim, Ki Hwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.3 no.2
    • /
    • pp.17-24
    • /
    • 2007
  • The HEMU-400X(High-speed Electric Multiple Unit 400km/h eXperiment) project starts in 2007. It is required to control and balance the systems engineering activities throughout the project life cycle for a successful completion of the project. The Systems Engineering Management Plan(SEMP) is the primary, top level technical management document for the integration of all engineering activities within the context of, and as an expansion of, the project plan. A SEMP should be prepared for each project and regularly updated as development progresses. This paper proposes the systems engineering management plan for the HEMU-400X project.

  • PDF